From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Design alteration for the Bentley 111 propeller shaft centre bearing.
Identifier | ExFiles\Box 99\4\ scan0106 | |
Date | 18th October 1938 | |
H 37. BY/NS.{Norman Scott} C. BY.{R.W. Bailey - Chief Engineer} c. Rm.{William Robotham - Chief Engineer} C. HPS.{Horace Percy Smith - Experimental Factory Mgr} DA.{Bernard Day - Chassis Design}11/G.18.10.38. FJH{Fred J. Hardy - Chief Dev. Engineer} BENTLEY 111. PROPELLER SHAFT CENTRE BEARING. G.CD.289. Referring to HPS.{Horace Percy Smith - Experimental Factory Mgr}/LK.{L. King}1/VS.{J. Vickers}15.10.38. the thin adjusting washers were proposed because it was thought they would assist in assembling. As this has turned out not to be so, we have no objection to the solid packing of varying thickness and suggest that the detail should be altered. DA.{Bernard Day - Chassis Design} | ||