Suggesting replacing adjusting washers with packing plates for the Bentley III propeller shaft centre bearing assembly.

Identifier  ExFiles\Box 99\4\  scan0105
Date  15th October 1938
  
To Da.{Bernard Day - Chassis Design} from HPS{Horace Percy Smith - Experimental Factory Mgr}/LK.{L. King}
c. BY.{R.W. Bailey - Chief Engineer}
c. Rm.{William Robotham - Chief Engineer}
c. BY/NS.{Norman Scott}

437
FJH{Fred J. Hardy - Chief Dev. Engineer} 7/4

HPS{Horace Percy Smith - Experimental Factory Mgr}/LK.{L. King}1/VS.{J. Vickers}15.10.38.

BENTLEY III.

PROPELLER SHAFT CENTRE BEARING
G.CD.289.

When assembling the centre bearing to the above scheme it is difficult to insert the adjusting washers GB.3173 between the bracket and frame. Therefore, to facilitate assembly we suggest that the washers be replaced by a range of S/M.{Mr Moon / Mr Moore} packing plates .750" wide x 3.250" long, varying in thickness.

HPS{Horace Percy Smith - Experimental Factory Mgr}/L. King.
  
  