The installation of the Cost Section and the associated responsibilities for detail drawings.
| Identifier | ExFiles\Box 176\2\ img073 | |
| Date | 4th April 1940 | |
| H2A. from Fm. c. EV. {Ivan Evernden - coachwork} c. HPS {Horace Percy Smith - Experimental Factory Mgr} /RH. {R. Hollingworth} c. Rm {William Robotham - Chief Engineer} /HH. I'h. {Arthur M. Hanbury - Head Complaints} Rm. {William Robotham - Chief Engineer} 18/AL.E.4.40. ALAN F. {Mr Friese} UDRY. The Cost Section will shortly be installed at the Clan. All detail drawings will be submitted to this Section before they are issued to the Shop. Rm {William Robotham - Chief Engineer} /HH. will be responsible from now onwards to Fm. for all detail drawings. As heretofore, copies of all correspondence addressed to Rm {William Robotham - Chief Engineer} /HH, should be sent to EV. {Ivan Evernden - coachwork} who is responsible for all design work. Fm. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
