Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The revision of the epicyclic 3rd speed gearbox, friction clutch, and brake.

Identifier  WestWitteringFiles\V\March1931-September1931\  Scan308
Date  9th July 1931
  
BY.{R.W. Bailey - Chief Engineer} FROM DA.{Bernard Day - Chassis Design}
C. to SG.{Arthur F. Sidgreaves - MD} HS.{Lord Ernest Hives - Chair}
ORIGINAL
EPICYCLIC 3rd. SPEED
GEARBOX REVISED.
FRICTION CLUTCH & BRAKE.
DA{Bernard Day - Chassis Design}2/M9.7.31.
X523
We send herewith N. schs. 3306/7., shewing respectively the temporary adaptation of the present operating gear to the new oil valve, and the modification to the striking rods which is necessary to clear the brake drum etc.
The existing rods are used shortened.
RECEIVED 10 JUL 1931
DA.{Bernard Day - Chassis Design}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙