Rolls-Royce Archives
         « Prev  Box Series  Next »        

Test report on a Watford RO1 Magneto No. 68302 from chassis GAK.77.


Identifier  ExFiles\Box 47\4\  Scan099
Date  9th January 1925
  
EFC. {E. Fowler Clarke - Electrical Engineer}

9.1.25.

WA. {Mr Wallis} 102.

WATFORD RO {C. C. Rose - Export Manager} 1 MAGNETO No,68302 -- EXC CHASSIS GAK.77.
JACKSON.

This magneto has now been tested and was found to be O.K.

It was firstput through the production test as per our specification, the low speed sparking being as follows:-

Fully advanced 350 r.p.m.
Central 220 r.p.m.
Fully retarded 162 r.p.m.

An endurance test was then carried out consisting of an 8 hour run at 2000 r.p.m. lever central, and the H.T. discharging at 4.5 mm. gap.

Throughout the whole of this run the H.T. sparking was regular and the magneto exhibited no suspicion of failure.

We cannot understand why the magneto should fail so abruptly as reported by the customer, it is most another case of faulty timing.

EFC {E. Fowler Clarke - Electrical Engineer} /HEW.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙