Rolls-Royce Archives
         « Prev  Box Series  Next »        

Advisability of continuing with Phantom III rig tests.


Identifier  ExFiles\Box 159\6\  scan0027
Date  15th October 1937
  
To Rm. {William Robotham - Chief Engineer}

Handwritten: 1371
Handwritten (crossed out): AFEM 2/4
Handwritten (crossed out): SRD

Rm {William Robotham - Chief Engineer} /WB. {Mr Brazier / Mr Bell} 1/CB.15.10.37.

Re: PHANTOM III RIG TESTS.

Considering future policy re this chassis, we would be interested to know whether it is advisable to continue with the following Phantom III rig tests which we have in hand at the present time :-

Handwritten: HARDY (a) Timing gear endurance tests.
Handwritten: STEADMAN (struck out) (b) Water pump flow tests.
Handwritten: STEADMAN (c) Cylinder corrosion tests.
Handwritten: STEADMAN (d) Water pump flexible drive tests.
Handwritten: ROBEY (struck out) (e) Fan and belt tests.
Handwritten: HARDY (f) Steering pads.
Handwritten: MARTINDALE (g) Front brake dumb-bell link tests.

Handwritten Note: PJL - Will you let me know please AJS

Rm {William Robotham - Chief Engineer} /W. Bell.

Signature: W. Bell
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙