Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Comparing production costs for a re-designed Starting Handle Cover on the 25/30-HP Chassis.

Identifier  ExFiles\Box 113\5\  scan0010
Date  22th January 1937
  
Hs.{Lord Ernest Hives - Chair}
PY
Rm.{William Robotham - Chief Engineer}
Hy.{Tom Haldenby - Plant Engineer}

247

25/30-HP CHASSIS.

At present Starting Handle Cover E.84742 is produced as a Staybrite Pressing and costs 10d per stamping, plus machining - total cost 3/3d, as per memo RHC{R. H. Coverley - Production Engineer}/CH.1/IB.8.12.36.

This detail has been re-designed on similar lines to EW.571 - Piece No. E.61278, and we have obtained a quotation for this, produced as a Hot Brass Pressing, of 1½d each plus £3.10.0d for Dies, plus Plating & Machining Approx. total 1/- each.

The Staybrite forgings for "O2" and "P2" Series have already been made and delivered, i.e., 525 = £21.13.4d. Apparently it would pay us to scrap these and replace by Dixtampo Pressings. Please say if you are in agreement.

Roy.{Sir Henry Royce}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙