From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Engine and component testing procedures and endurance test updates.

Identifier  ExFiles\Box 155\2\  scan0162
Date  8th October 1937
  
2. Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}4/WH.8.10.37.

Wraith III. No.2 Continued.

Each 10 hours to comprise -

7 hrs full load.
2 hrs 1/2 load.
1 hr 1/4 load.

After 20 hours remove cylinder head and crack
test exhaust valves.

Oil inlet temp to be controlled at 110°C.

Log all failures.

No.5.

Ph.III No.6.

Continue endurance under conditions of previous memo.

Bentley No.19 Unit.

Take power curves open exhaust, and with std Bentley silencer noting valve bounce, if any.

Check slow running and observe tappet noise with the normal .006 tappet clearance.

When completed, instruct fitters to fit EB.3240
camshaft and re-check the above tests with this camshaft, but with a tappet setting of .012. This test is important and urgent with regard to information required for instructions regarding B.III camshaft.

No. 2 Bed.

B.23.OHC.

Investigations proceeding with exhaust system and camshaft.

Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}
  
  