From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of a modified control for the butterfly valve in the exhaust pipe.
Identifier | ExFiles\Box 171\3\ img175 | |
Date | 28th May 1923 | |
R.R. 784 (5 M.{Mr Moon / Mr Moore}) (S.J.) 291. 1-10-21. G.{Mr Griffiths - Chief Accountant / Mr Gnapp} 3087. ORIGINAL COMPLETED 28.6.23 STANDARDISATION of CHASSIS PARTS. Description of Parts. Modified control for butterfly valve in exhaust pipe. Origin. To prevent the possibility of the exhaust butterfly valve holding open carburetter throttle. Experimental Test Report. This modification consists of the butterfly valve being closed by a spring. If this valve sticks, it would remain wide open and no harm would result. Road Test Report. Run 3600 miles on 6-EX. " 2500 " " 49-GB. Has given no trouble. Drawing No. Part List A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on:- FORTHWITH £25. Series...... £.... Series...... £.... Series...... £.... Signature of Exp. Dept. that above is correct. E.Hives. Weight of Old Part. Cost of Old Part. £0. 19. 1 Weight of New Part. Cost of New Part. £1. 9. 8 Difference per Car. Difference per Car. £ 10. 7 increase. Signature of Mr. De LOOSE that above is correct. My/JW 18.5.23 Storekeeper advised re above: Storekeeper's Signature SIGNATURES | DATE | REMARKS Mr. JOHNSON | 21.6.23 | C.Johnson. Mr. E.Johnson. | 21.6.23 | Agreed, BJ. Mr. ROYCE | 25/6/23 | Agreed FHR Mr. WORMALD | 19.6.23 | Agreed, Wor.{Arthur Wormald - General Works Manager} Mr. ROWLEDGE | 30.5.23 | Agreed, Rg.{Mr Rowledge} Mr. DAY | 31.5.23 | Agreed, Da.{Bernard Day - Chassis Design} Mr. BAILEY | 31.5.23 | Agreed, BY.{R.W. Bailey - Chief Engineer} Mr. PLATFORD | 29.5.23 | Agreed, EP.{G. Eric Platford - Chief Quality Engineer} Mr. NORTHEY | 1.6.23 | Agreed, PN.{Mr Northey} E.W.L. for M.R.Inc. | ||