Schedule of parts with promised and posted dates, organised by vehicle section.
Identifier | WestWitteringFiles\L\Jan1924-March1924\ Scan25 | |
Date | 16th January 1924 guessed | |
E.{Mr Elliott - Chief Engineer} A.{Mr Adams} C. 2. ENGINE SECTION. Item. Date promised. Date posted. Main oil connections for feed to each main bearing. 5th Jan. 5th Jan. Oil level gauge. 5th Jan. 4th Jan. Two jet carburetter. 15th Jan. 16th Jan. Air inlet, engine breather. 15th Jan. 16th Jan. Exhaust butterfly valve & control gear for same. 15th Jan. 16th Jan. Ejector exhaust connection for induction pipe jacket. 15th Jan. 16th Jan. Engine underguards. 22nd Jan. Control mechanism. 22nd Jan. ELECTRICAL SECTION. Switchbox. 27th Jan. GEAR-BOX SECTION. Coupling between engine & gearbox. 3rd Jan. 3rd Jan. FRAME SECTION. Radiator. 5th Jan. 5th Jan. Bonnet & Strips. 5th Jan. 5th Jan. Pedals. 19th Jan. Well in hand: expect to be to time. Front cross member & engine suspension. 5th Jan. 5th Jan. Steering - (side steering tube & modifications to box.) 19th Jan. Well in hand: expect to be to time. Forward exhaust pipe. 5th Jan. 5th Jan. Frame side member. 12th Jan. 5th Jan. Mixture control. 12th Jan. 17th Jan. Klaxon position. 12th Jan. 12th Jan. Front brake equalising gear. 12th Jan. 12th Jan. | ||