From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of chassis parts report for the Crick Valve Lifter.
Identifier | ExFiles\Box 171\3\ img151 | |
Date | 15th January 1923 | |
R R 766 (6 H) (S H 268, 29-9-20) G 2564 ORIGINAL COMPLETED 3.3.23. STANDARDISATION of CHASSIS PARTS. Date 15.1.23. Description of Parts. CRICK VALVE LIFTER. Drawing No. X No. 591 Part List Origin. To enable valves to be taken out more easily. A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock alteration effective on future Chassis. Experimental Test Report. The present valve lifter we supply in the 40/50 HP. Tool Kit is unsatisfactory. The Crick valve lifter enables valve to be taken out without dismantling exhaust pipes etc. Road Test Report. We have supplied a large number of these to customers who have complained of the present tool. We have had no complaints of the 'Crick' Signature of Exp. Dept. that above is correct. L.Aives Weight of Old Part. Cost of Old Part. £ 0. 3. 11 1/2 Weight of New Part. Cost of New Part. £ 0. 8. 6 Difference per Car. Difference per Car. £ 0. 4. 6 1/2 increase. Signature of Mr. De LOOZE that above is correct. My/JW 20.1.23. Cost of Parts in Works which will be scrapped if commended on:- forthwith Series... £ Series... £ Series... £ Storekeeper advised re above: Storekeeper's Signature. SIGNATURES | DATE | REMARKS Mr. JOHNSON | 2.3.23 | Agreed. BJ. Mr. B.Johnson | 1.3.23 | Agreed. CJ. Mr. ROYCE | 18/1/23 | Agreed FHR no reason for further search Mr. WORMALD | 22.1.23 | Agreed - but price should be decreased. Mr. BARRINGTON (Mr. ROWLEDGE. crossed out) | 17.1.23 | Agreed. Rg.{Mr Rowledge} Mr. DAY | 18.1.23 | agreed as temporary measure until improved design is available. DA{Bernard Day - Chassis Design} Mr. BAILEY | 22.1.23 | Agreed. BY.{R.W. Bailey - Chief Engineer} Mr. PLATFORD | 19.1.23 | Agreed. BP. Mr. NORTHEY (EWT. for R.R. Inc) | 23.1.23 | Agreed. PN.{Mr Northey} [STAMPED TEXT] 40/50. H.{Arthur M. Hanbury - Head Complaints} CHASSIS | ||