Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Capacity and feasibility of undertaking Allison engine repairs.

Identifier  ExFiles\Box 132\2\  scan0233
Date  10th December 1940
  
Hs.{Lord Ernest Hives - Chair} from Rm.{William Robotham - Chief Engineer}
Allison file
1120
Rm.{William Robotham - Chief Engineer}7/ML.10.12.40.
ALLISON ENGINE REPAIRS.
Further to our conversation on this subject.
We have now done 278 Kestrels at the Clan Foundry, 107 of which were completed in the last seven weeks.
We therefore feel that we should be able to handle any Allison repairs that are likely to be required for the next twelve months.
We have examined the engine which is at present stripped and find that most of the existing Kestrel fixtures can be adapted.
We should like to have this job unless, for reasons of policy, it is impossible.
Rm.{William Robotham - Chief Engineer}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙