Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of road springs for 40/50 HP and 20 HP models to suit bad roads abroad.

Identifier  ExFiles\Box 54\3\  Scan118
Date  22th January 1924
  
R.R. 755 (10M) (SL 72 18-7-23) MP 274954a.
X2628. COMPLETED 4.3.24.
STANDARDISATION of CHASSIS PARTS.

Description of Parts. ROAD SPRINGS, 40/50 HP. AND 20 HP.
Origin: To suit bad roads abroad.

Experimental Test Report.
We frequently receive complaints of road springs being too weak for countries such as - Australia, Poland, Portugal etc. The suggested modification is to increase the strength of road springs 20%.

Road Test Report.
The effect of the 20% stiffer springs is that they will greatly reduce the bumping over bad roads - we also expect they will tend to reduce spring failures. We recommend we adopt 20% stiffer springs where roads are consistently bad.

Weight of Old Part.
Weight of New Part.
Difference per Car.

Cost of Old Part. £
Cost of New Part. £
Difference per Car. £
Estimated increase in cost of such cars - £2. 0. 0

Signature of Mr. De LOOZE that above is correct. My/JW 25.1.24.

SIGNATURES
MR. JOHNSON
MR. B. JOHNSON
MR. ROYCE
MR. WORMALD
MR. ROWLEDGE
MR. DAY
MR. BAILEY
MR. PLATFORD
MR. ELLIOTT
MR. NORTHEY
MR. HIVES

DATE
3.3.24
3.3.24

22.1.24
23.1.24
24.1.24
23.1.24
23.1.24
26.1.24
24.1.24
25.2.24

REMARKS
Agreed. CJ.
Agreed, provided Sg.{Arthur F. Sidgreaves - MD} advises whether strong springs are requested in each case. BJ.
See over for R's remarks.
Agreed. Wor.{Arthur Wormald - General Works Manager}
Agreed. Rg.{Mr Rowledge}
Agreed. Da.{Bernard Day - Chassis Design}
Consider this very necessary to prevent breakages. BY.{R.W. Bailey - Chief Engineer}
Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
Agreed. E.{Mr Elliott - Chief Engineer} It is presumed we also fit shock dampers to rear for such work. E.{Mr Elliott - Chief Engineer}
Agreed. PN.{Mr Northey}
Agreed. E.Hives.

Date 22.1.24
X No. 2628
Drawing No. 4261
Part List

A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Cost of Parts in Works which will be scrapped if commenced on :-
Series..........£..........
Series..........£..........
Series..........£..........
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙