Clarifying a discrepancy in the slack specification for serrations on a pressure ring for the 20/25 HP model.
| Identifier | ExFiles\Box 103\1\ scan0063 | |
| Date | 6th November 1933 | |
| Hs. {Lord Ernest Hives - Chair} Hd {Mr Hayward / Mr Huddy} /SB {Mr Bull/Mr Bannister} 2/HR.6.11.33. CLUTCH SLIP. 20/25 HP. -------------------- We are arranging for the serrations on the pressure ring to be machined in the Works as suggested in your Hs {Lord Ernest Hives - Chair} /Gry {Shadwell Grylls} 5/KT.4.10.33. In this memo you refer to the slack in the serrations as being increased from .005" to .020" whereas the instructions already given by us to Depots (vide Depot Sheet No. Hd. {Mr Hayward / Mr Huddy} 242 and Hs {Lord Ernest Hives - Chair} 5/MJ.31.1.33) only specify .010" to .012" slack. BY. {R.W. Bailey - Chief Engineer} has also altered the drawings to show .010" slack. In view of the trouble due to jaggering which is apt to develop with too much slack, we shall be glad to know whether .020" slack is intentional, or whether this figure was stated in error. Handwritten notes: X1300 Hd. {Mr Hayward / Mr Huddy} GRY {Shadwell Grylls} see me H {Arthur M. Hanbury - Head Complaints} /S | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
