From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Proposal to use weaker springs in the side steering tube to reduce road shocks on the Phantom model.
Identifier | ExFiles\Box 68\1\ scan0171 | |
Date | 14th August 1926 | |
RR 755 (10H) (DB{Donald Bastow - Suspensions}130 12-9-24) MS 301225 STANDARDISATION of CHASSIS PARTS. Description of Parts WEAKER SPRINGS IN SIDE STEERING TUBE. Origin. To reduce road shocks. Experimental Test Report. It is proposed, in cases of complaint with the original Phantom steering with 1.125" lead, that the springs in the side steering tube should be changed from 3500 lbs. to 1500 lbs. If found necessary, the .940 worm will also be fitted. Road Test Report. Several customers cars have satisfactorily been dealt with in this way by Paris. It has been agreed that approximately 50% reduction in road shocks can be obtained by alteration to the springs. COMPLETED 20.9.26 X No. 8450 Drawing No. Part List A Scrap and replace at all costs, including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. £ s. d.{John DeLooze - Company Secretary} Weight of New Part. £ s. d.{John DeLooze - Company Secretary} Difference per Car. £ 12. 12. 0d. Cost of Old Part. £ s. d.{John DeLooze - Company Secretary} Cost of New Part. £ s. d.{John DeLooze - Company Secretary} Difference per Car for changing springs. For changing steering worm & nut. Cost of Parts in Works which will be scrapped if commenced on:- Series ......£...... Series ......£...... Series ......£...... Signature of Mr. De LOOZE that above is correct. SIGNATURES, DATE, REMARKS MR. JOHNSON C.W.B., 13.9.26, Agreed. CWB. (not in France) MR. B. JOHNSON, 13.9.26, Agreed. B. Johnson. per CWB Signing by end of Sept MR. ROYCE, 16.8.26, Agreed. FHR. MR. WORMALD, 14.8.26, Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE, 10.9.26, Agreed. Rg.{Mr Rowledge} MR. DAY, 16.8.26, Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY, 16.8.26, Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD, 14.8.26, Agreed. EP.{G. Eric Platford - Chief Quality Engineer} What about steering column support - C. & D.{John DeLooze - Company Secretary} steering? MR. ELLIOTT, 16.8.26, Agreed. E.{Mr Elliott - Chief Engineer} MR. NORTHEY, 23.8.26, Agreed. PN.{Mr Northey} MR. HIVES, 14.8.26, Agreed. Hs.{Lord Ernest Hives - Chair} | ||