From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The status of steering modifications for 200 Bentley chassis.
Identifier | ExFiles\Box 108\2\ scan0255 | |
Date | 1st July 1939 | |
-2- Modifications to Bentley Steering. There were 200 Bentley Chassis which required the steering roller changed and all of these chassis, with the exception of six, have now been attended to. We are awaiting the convenience of the owners of these six chassis, so that the whole 200 cars can be completed. The average time taken to complete the Bentley Steering modification has been 1 3/4 hrs, and as with the Wraith, we arranged for the customer to bring his car to the Works in the morning, leaving the same evening with the car completed. LA{L. A. Archer} | ||