Modification of the starter automatic switch to prevent sparking and simplify assembly by deleting carbon contacts.
| Identifier | ExFiles\Box 168a\2\ img058 | |
| Date | 16th October 1931 | |
| R.6080 COMPLETED 2. 3. 32. STANDARDISATION of CHASSIS PARTS. Date: 16.10.31 No. 6080 Drawing No: Le.C. 2904 & No. 73380 Part List Description of Parts. SEQUENCE STARTER AUTOMATIC SWITCH WITH MODIFIED MAIN SWITCH TO Le.C. 2904 AND WITH TAAZAN CARBON CONTACTS DELETED. Origin. To prevent sparking at the main copper contacts and to simplify assembly of relay switch. Experimental Test Report. Bench tests with chronograph show that main carbons now make always before coppers, by retiming the operation of the switch so that main copper contacts close before the teaser circuit is broken. The necessity for teaser carbon contacts is obviated, there being little or no current at the teaser contacts at break. Road Test Report. Used on 28-MX {John H Maddocks - Chief Proving Officer} for 22,000 miles satisfactorily. Le.C. 2904 also tried on the switch on 27-AX for 7,000 miles OK. ACTION TAKEN Weight of Old Part. Cost of Old Part. £ - 5-7d. Weight of New Part. Cost of New Part. £ - 5-2d. Difference per Car. Difference per Car. £ - - 5d Decrease Signature from Cost Dept. that above is correct. G {Mr Griffiths - Chief Accountant / Mr Gnapp} /RD.29.2.32, G.29.2.32, WOR. {Arthur Wormald - General Works Manager} INITIAL | DATE | REMARKS SG. {Arthur F. Sidgreaves - MD} | 1.3.32. | Agreed SG. {Arthur F. Sidgreaves - MD} R. {Sir Henry Royce} | 1.1.32. | Agreed R.. WOR. {Arthur Wormald - General Works Manager} | 1.1.32. | Agreed WOR. {Arthur Wormald - General Works Manager} Be very careful about deleting the carbon contact as this part has been C. | 1.1.32. | Agreed for. to have been very reliable as far as I know. FER. RG. {Mr Rowledge} | 1.1.32. | Agreed RG. {Mr Rowledge} DA. {Bernard Day - Chassis Design} | 1.1.32. | Agreed DA. {Bernard Day - Chassis Design} BY. {R.W. Bailey - Chief Engineer} | 1.1.32. | Agreed By. {R.W. Bailey - Chief Engineer} EP. {G. Eric Platford - Chief Quality Engineer} | 1.1.32. | Agreed E. {Mr Elliott - Chief Engineer} E. {Mr Elliott - Chief Engineer} | 1.1.32. | Agreed E. {Mr Elliott - Chief Engineer} PN. {Mr Northey} | 1.1.32. | Agreed P. HS. {Lord Ernest Hives - Chair} | 1.1.32. | Agreed H. {Arthur M. Hanbury - Head Complaints} A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock. Alteration effective on future Chassis. Cost of Parts in Works which will be scrapped if commenced on :- Series.........£....... Series.........£....... Series.........£....... | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).