Standardisation of chassis parts by deleting oil holes and grooves in steering worms to reduce cost.

Identifier  ExFiles\Box 106\3\  scan0191
Date  20th October 1927
  
RR 758 REVISED (10H) (DE.649 9-12-26) BM. 2/1187.
COMPLETED. 15.11.27
Rec'd 4/4/27 x5430
STANDARDISATION of CHASSIS PARTS.
Date 20.10.27
Description of Parts.
DELETION OF OIL HOLES AND GROOVES IN STEERING WORMS.
X No. 5430
Drawing No.
Origin. To reduce cost.
Experimental Test Report.
The holes and grooves were instructed with the object of assisting the Works in producing free steerings. It is now considered they are unnecessary.
Road Test Report.
9 production cars have passed through tests without any trouble. Most experimental cars have always been running with plain worms.
Part List (1)
A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part. Cost of Old Part. 20HP £ 3-6-4 40/50HP
Weight of New Part. Cost of New Part. 20HP £ 2-19-10 40/50HP
Difference per Car. £ 6-6 20HP / 6-7 40/50HP
Signature from Cost Dept. that above is correct. ARb 9/11/27 G 10/11/27
Cost of Parts in Works which will be scrapped if commenced on :-
Series.........£.......
Series.........£.......
Series.........£.......

INITIAL | DATE | REMARKS
BJ. | 15.11.27 | Agreed
R.{Sir Henry Royce} | 31.10.27 | Agreed. FHR.
WOR.{Arthur Wormald - General Works Manager} | 21.10.27 | Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 21.10.27 | Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 21.10.27 | Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 21.10.27 | Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 20.10.27 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 31.10.27 | Agreed. E.{Mr Elliott - Chief Engineer}
PN.{Mr Northey} | |
CWB. | 24.10.27 | Agreed. CWB.
Hs.{Lord Ernest Hives - Chair} | 20.10.27 | Agreed. Hs.{Lord Ernest Hives - Chair}

[STAMPED TEXT]
PHANTOM
20. H.P.
CHASSIS
  
  