Standardisation of a washer for the steering box stud.

Identifier  ExFiles\Box 38\1\  Scan126
Date  26th September 1923
  
R.R. 755 (10M) (SL 72 18-7-23) MP 274954s.
Y3465
COMPLETED 18.10.23
STANDARDISATION of CHASSIS PARTS.
Date 26.9.23.
Description of Parts: WASHER FOR STEERING BOX STUD.
Origin: To improve design.
Experimental Test Report: A large diameter washer is used to ensure nut remaining tight.
Road Test Report: Adopted by Springfield.
Weight of Old Part:
Weight of New Part:
Difference per Car:
Cost of Old Part: £
Cost of New Part: £
Difference per Car: £ Negligible.
Signature of Mr. De LOOZE that above is correct. My/JW 15.10.23.
X No. 3465
Drawing No.
Part List
A Scrap and replace at all costs including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.......... £.........
Series.......... £.........
Series.......... £.........
SIGNATURES | DATE | REMARKS
MR. JOHNSON | 17 OCT | Agreed C. Johnson
MR. B. JOHNSON | 17.10.23 | Agreed
MR. ROYCE | 11.10.23 | Agreed. FHR.
MR. WORMALD | 16.10.23 | Agreed. Wor.{Arthur Wormald - General Works Manager}
MR. ROWLEDGE | 3.10.23 | Agreed. Rg.{Mr Rowledge}
MR. DAY | 10.10.23 | Agreed. Da.{Bernard Day - Chassis Design}
MR. BAILEY | 27.9.23 | Agreed. BY.{R.W. Bailey - Chief Engineer}
MR. PLATFORD | 26.9.23 | Agreed. EP.{G. Eric Platford - Chief Quality Engineer} R.{Sir Henry Royce} writes 'Obviously slight improvement - recommend adopt Derby'.
MR. ELLIOTT | 9.10.23 | Agreed. E.{Mr Elliott - Chief Engineer} This washer is also twice the thickness of present std. to avoid collapsing into the elongated cast stud hole.
MR. NORTHEY | 1.10.23 | Agreed. PN.{Mr Northey}
MR. HIVES | 16.10.23 | Agreed. E.{Mr Elliott - Chief Engineer} Hives.
STAMPS: RECEIVED, CHASSIS
  
  