Statement on the nil cost for extra jigs and tools to bring the 'F' series chassis into production.
| Identifier | ExFiles\Box 166\1\ img054 | |
| Date | 12th March 1935 | |
| [Upside down header] BRITISH STANDARDIZATION OF PARTS [Typed text] Est. cost of extra jigs, tools and equipment (Sft {Mr Swift} /Ws.12.3.35) NIL Could be brought on to production at the 1st chassis in "F" series (Sft {Mr Swift} /GH.12.3.35) without scrap. [Stamped text] RECEIVED WO 2 FEB 1935 [Handwritten Log Table] INITIAL | DATE DS | 29.3.35 W.O.W | 25.4.41 C | 25.9.35 OR | 10.1.36 AQ | 2.2.36 VB | 5.3.36 EF | 12.5.36 ER | 2.6.36 TT2 | 21.7.36 XM | 18.8.36 RH {R. Hollingworth} | 28.9.36 | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
