Scheduling a conference to discuss advance estimates and routines for the Rationalised Chassis Programme.
Identifier | ExFiles\Box 148\2\ scan0232 | |
Date | 17th August 1939 | |
1260 To By.{R.W. Bailey - Chief Engineer} c. to Rm.{William Robotham - Chief Engineer} c. to RHC.{R. H. Coverley - Production Engineer} c. to RHC{R. H. Coverley - Production Engineer}/AML. c. to RHC{R. H. Coverley - Production Engineer}/Wld/JF. c. to Les.{Ivan A. Leslie} By/NS.{Norman Scott}10/JH.17.8.39. Advance Estimates for Rationalised Chassis Programme. We have been asked in the memo. RHC{R. H. Coverley - Production Engineer}/AML.1/MD.10.8.39. to keep the Rate Fixing Department up to date with information relating to the Rationalised Chassis. As a temporary measure we have supplied RHC{R. H. Coverley - Production Engineer}/AML. with copies of the specifications that have been produced. We have also obtained prints of LOP's. that have not been instructed for production. We propose to hold a conference with RHC{R. H. Coverley - Production Engineer}/Wld/JF. and RHC{R. H. Coverley - Production Engineer}/AML. to fix up the routine for future use. The conference will take place at 10 o-clock on Friday 18th. in the writers office. By/NS.{Norman Scott} | ||