Scheduling a conference to discuss advance estimates and routines for the Rationalised Chassis Programme.
| Identifier | ExFiles\Box 148\2\ scan0232 | |
| Date | 17th August 1939 | |
| 1260 To By. {R.W. Bailey - Chief Engineer} c. to Rm. {William Robotham - Chief Engineer} c. to RHC. {R. H. Coverley - Production Engineer} c. to RHC {R. H. Coverley - Production Engineer} /AML. c. to RHC {R. H. Coverley - Production Engineer} /Wld/JF. c. to Les. {Ivan A. Leslie} By {R.W. Bailey - Chief Engineer} /NS. {Norman Scott} 10/JH.17.8.39. Advance Estimates for Rationalised Chassis Programme. We have been asked in the memo. RHC {R. H. Coverley - Production Engineer} /AML.1/MD.10.8.39. to keep the Rate Fixing Department up to date with information relating to the Rationalised Chassis. As a temporary measure we have supplied RHC {R. H. Coverley - Production Engineer} /AML. with copies of the specifications that have been produced. We have also obtained prints of LOP's. that have not been instructed for production. We propose to hold a conference with RHC {R. H. Coverley - Production Engineer} /Wld/JF. and RHC {R. H. Coverley - Production Engineer} /AML. to fix up the routine for future use. The conference will take place at 10 o-clock on Friday 18th. in the writers office. By {R.W. Bailey - Chief Engineer} /NS. {Norman Scott} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
