From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Scheduling a conference to discuss advance estimates and routines for the Rationalised Chassis Programme.

Identifier  ExFiles\Box 148\2\  scan0232
Date  17th August 1939
  
1260

To By.{R.W. Bailey - Chief Engineer}
c. to Rm.{William Robotham - Chief Engineer}
c. to RHC.{R. H. Coverley - Production Engineer}
c. to RHC{R. H. Coverley - Production Engineer}/AML.
c. to RHC{R. H. Coverley - Production Engineer}/Wld/JF.
c. to Les.{Ivan A. Leslie}

By/NS.{Norman Scott}10/JH.17.8.39.

Advance Estimates for Rationalised Chassis Programme.

We have been asked in the memo. RHC{R. H. Coverley - Production Engineer}/AML.1/MD.10.8.39. to keep the Rate Fixing Department up to date with information relating to the Rationalised Chassis.

As a temporary measure we have supplied RHC{R. H. Coverley - Production Engineer}/AML. with copies of the specifications that have been produced. We have also obtained prints of LOP's. that have not been instructed for production.

We propose to hold a conference with RHC{R. H. Coverley - Production Engineer}/Wld/JF. and RHC{R. H. Coverley - Production Engineer}/AML. to fix up the routine for future use.

The conference will take place at 10 o-clock on Friday 18th. in the writers office.

By/NS.{Norman Scott}
  
  