Standardisation of chassis parts report for an aluminium inlet pipe.

Identifier  ExFiles\Box 171\1\  img129
Date  26th March 1928
  
RR 785 REVISED (10M) (D.C. 777 - 29 - 2 - 28) MC C.LTD
COMPLETED 10.5.28
STANDARDISATION of CHASSIS PARTS.
Date 26.3.28
Description of Parts.
ALUMINIUM INLET PIPE.
X No. 7070
Drawing L.O.P. No E.{Mr Elliott - Chief Engineer} 76692
Part List
Origin: Incorporated with new type cyl. head.
Experimental Test Report.
Fitted to 15-EX and run 10,000 miles in France. Fitted to 14-EX and 10-EX run 5000 and 8000 miles respectively.
Road Test Report.
Good distribution during 10,000 miles in France.
Pipe in good condition at finish of test.
A Scrap and replace at all costs including Chassis already delivered to Customers.
B Scrap and replace on all Chassis in Works.
C Scrap present stock and place on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part. £
Weight of New Part. £
Difference per Car. £
Cost of Old Part. See sheet X.7050. Alum.
Cost of New Part. cyl. head, etc
Difference per Car. Wor.{Arthur Wormald - General Works Manager}
Cost of Parts in Works which will be scrapped if commenced on:-
Series.......£......
Series.......£......
Series.......£......
Signature from Cost Dept. that above is correct. G.{Mr Griffiths - Chief Accountant / Mr Gnapp}
INITIAL, DATE, REMARKS
BJ., 10.5.28, Agreed. B.J#
R.{Sir Henry Royce}, 29/3/28, agree. JNR.{Charles L. Jenner}
WOR.{Arthur Wormald - General Works Manager}, 27.3.28, Agreed. Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge}, 26.3.28, Agreed. RG.{Mr Rowledge}
DA.{Bernard Day - Chassis Design}, 28.3.28, Agreed. Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer}, 26.3.28, Agreed. BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer}, 27.3.28, Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer}, 28.3.28, Agreed. E.{Mr Elliott - Chief Engineer} We are anxious to follow this with the Weir induction pipe as soon as possible to avoid butterfly throttle valve and for other important advantages.
PN.{Mr Northey}, 10.5.28, Agreed. PN.{Mr Northey}
CWB., 4.4.28, Agreed. CWB.
HS.{Lord Ernest Hives - Chair}, 26.3.28, Agreed. Hs.{Lord Ernest Hives - Chair}
  
  