The cost and implementation plan for a chassis part modification.

Identifier  ExFiles\Box 171\1\  img130
Date  29th February 1928
  
STANDARDISATION of CHASSIS PARTS
ALUMINIUM LIMIT FILE
CONSOLIDATED 3.C.58
Date: 29.2.28

(1) The number of the first chassis on which the new part will be fitted. F.2.B series.
(2) Date when the chassis will be handed to test. 9.6.28
(3) Cost of scrapped material, if any. £300 includes all parts affected by this modification.
(4) Cost of jigs and tools. £550 includes all parts affected by this modification.

TABLE:
INITIAL | DATE | REMARKS
BL | 10.2.28 | Des.A B.14
ROW | 21.2.28 | Des.A 701.
RD | 28.2.28 | Des.A R.C.
DA{Bernard Day - Chassis Design} | 28.2.28 | Des.A G.H.
BY | 28.2.28 | Des.A BY.{R.W. Bailey - Chief Engineer}
ER | 21.2.28 | Des.A ER
E | 28.2.28 | Des.A b.g.e.w We are anxious to follow this up with the induction jigs as soon as possible to avoid delay to engine output and for valve test department.
RM{William Robotham - Chief Engineer} | 10.2.28 | Des.A M.{Mr Moon / Mr Moore}
DMB | 4.4.28 | Des.A DMB.
HR | 28.2.28 | Des.A HR.
  
  