From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation report on increasing the friction area of servo balance links for damping.
Identifier | ExFiles\Box 16\3\ Scan006 | |
Date | 22th September 1926 | |
RR 755 (10M) (DB{Donald Bastow - Suspensions}130 12-9-24) MS 301225 X/7370 COMPLETED 20.10.26 STANDARDISATION of CHASSIS PARTS. Date 22.9.26 Description of Parts SERVO BALANCE LINKS. X No. 7370 Drawing N sch. No. 2194 Part List G.74852 Origin. To increase area of friction for damping the links. Experimental Test Report. Friction remains more constant with the increased area - load can be definitely set by the castellated nut. Road Test Report. 10,000 miles in France on 12-EX car. Friction of links remained constant with the increased area of load of 50 lbs. at end of lever G.72513 and was found to give the best results i.e. prevent thumping of front brakes. A Scrap and replace at all costs including Chassis already delivered to customers. B Scrap and replace on Chassis in works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Cost of Old Part. £. 14. 9d. Weight of New Part. Cost of New Part. £. 1. 4. 0d. Difference per Car. Difference per Car. £. 9. 3d. increase. Cost of Parts in Works which will be scrapped if commenced on:- Series.........£.......... Series.........£.......... Series.........£.......... Signature of Mr. De LOOZE that above is correct. My/Rb.{R. Bowen} 18.10.26. SIGNATURES DATE REMARKS MR. C.W.B. 24.9.26 Agreed. CWB. MR. B. JOHNSON 20.X.26 agreed speed # pressure of MR. ROYCE 24.9.26 Agreed. FHR. MR. WORMALD 22.9.26 Agreed. Wor.{Arthur Wormald - General Works Manager} MR. ROWLEDGE 22.9.26 Agreed. Rg.{Mr Rowledge} MR. DAY 24.9.26 Agreed. Da.{Bernard Day - Chassis Design} MR. BAILEY 11.10.26 Agreed. BY.{R.W. Bailey - Chief Engineer} MR. PLATFORD 23.9.26 Agreed. EP.{G. Eric Platford - Chief Quality Engineer} MR. ELLIOTT 25.9.26 Agreed. E.{Mr Elliott - Chief Engineer} MR. NORTHEY 23.9.26 Agreed. PN.{Mr Northey} MR. HIVES 22.9.26 Agreed. Hs.{Lord Ernest Hives - Chair} | ||