Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
The required lift on the wing-nut for Bensport brake adjustment.

Identifier  ExFiles\Box 84\2\  scan0051
Date  2nd August 1933
  
[Handwritten at top] GRY{Shadwell Grylls} x204. See me

To [Strikethrough]BY.{R.W. Bailey - Chief Engineer}[/Strikethrough] from Da.{Bernard Day - Chassis Design}
c. [Strikethrough]Wor{Arthur Wormald - General Works Manager} E.{Mr Elliott - Chief Engineer}[/Strikethrough] Hs.{Lord Ernest Hives - Chair}

Da.{Bernard Day - Chassis Design}6/HP.2.8.33. [Handwritten]HS{Lord Ernest Hives - Chair}[/Handwritten]

Bensport Brake Adjustment.

In view of the discussion which arose as to the amount of lift required on the wing-nut to set the clearance at an amount adequate for alum. shoes, we set the adjuster movements out and send the result, N. Sch. 3781 herewith.

It will be seen that when the teeth on the wing nuts are .1875 deep, as given on the original production D.O. details, the movement at the end of the levers indicates that there is more than adequate clearance.

Da.{Bernard Day - Chassis Design}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙