Status report on various chassis specifications, tests, and component fittings.


Identifier  ExFiles\Box 161a\3\  scan0054
Date  20th February 1939
  
-3-

HFS/WSC. {W. S. Cassel} 1/BA.20.2.39.

A.B.SO. continued.

It must be understood that this chassis is build up with temporary axle, steering, front suspension etc. Correct details should be urged so that same can be fitted immediately the car returns from the coachbuilders.

11.B.V.

Specification issued in accordance with HFS/WSC. {W. S. Cassel} 1/BA.21.1.39 should be carefully considered with a view of arriving at a completion date.

12.B.V.

The remarks as for 11.B.V., also apply to this chassis, specification is issued in HFS/WSC. {W. S. Cassel} 11/BA.6.2.39.

4.E.SO.

Specification will be issued for this chassis on 20.2.39.

B.V.Bumper Chassis.

It was agreed that we do not fit the Steel Dashboard, Radiator and Bonnet, Running Boards etc, to this chassis, in view of this FS {F. Steele} promised to pass to test on 18.2.39.

Ph.III.Tappts.ECD.S35.766.777.

FN. reported that he was fitting this scheme to Ph.III No.14 Unit, and. passing to test 20.2.39.

Wraith Gear Box Adapted to B.V.

No.1 Box is fitted in B.II No.7 Car. HPS. {Horace Percy Smith - Experimental Factory Mgr} instructed that the second Box was to be completed for dynamometer running.

continued.
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙