| Identifier | Entry | |
|
scan0001 |
Follow-up letter to Mr. Hives concerning correspondence from the Association of British Motor & Allied Manufacturers, Ltd.
| |
|
View original record |
X4554 MAY 11 J. EH/LG 15-5? S/W: Mr. Hives. 10.5.18. C9/H10518. With reference to Mr. Johnson's letter to you of the 30th inst., wherein he enclosed a letter from the Association of British Motor &…
| |
|
scan0002 |
Letter from the Association of British Motor and Allied Manufacturers regarding applications for materials for experimental post-war models.
| |
|
View original record |
COPY. THE ASSOCIATION OF BRITISH MOTOR AND ALLIED MANUFACTURERS, LTD. Ref. No. C.9. 39, St. James's Street, London, S.W.1. ENGINEERING TRADES (NEW INDUSTRIES) COMMITTEE. MOTOR INDUSTRY BRANCH…
| |
|
scan0003 |
Post-war production strategy for the 'Northcliffe' and 'After-the-War' chassis.
| |
|
View original record |
To R. from EH. c. to CJ. c. to C X4554 EH1/LG16.5.18. X.2565 - RE - AFTER THE WAR CHASSIS. Attached herewith are copies of letters sent to the works by CJ with a request that we should send our…
| |
|
scan0004 |
Letter from the Ministry of Reconstruction requesting a statement of material requirements for experimental post-war models.
| |
|
View original record |
S.R. 239a (500 T) (S.D. 408. 26-4-17.) Bm. 2/156/13. COPY THE ASSOCIATION OF BRITISH MOTOR AND ALLIED MANUFACTURERS. LTD+ Ref. No. B.16. 39 St. James' Street, London. S.W.1. 29th April 1918. Dear Sir,…
| |
|
scan0005 |
Letter from The Association of British Motor and Allied Manufacturers Ltd. clarifying requirements for material applications for experimental post-war models.
| |
|
View original record |
H.H. 83a (500 T) (S.D. 408. 26-4-17.) Bm. 2/156/13. C O P Y THE ASSOCIATION OF BRITISH MOTOR AND ALLIED MANUFACTURERS LTD. Ref. No C.9. 39 St. James's Street, London S.W.1. ENGINEERING TRADES (NEW…
| |
|
scan0006 |
Recommendation for Mr. Royce regarding materials for experimental post-war models.
| |
|
View original record |
4554 EH1/LG 16-5-18 To EH from CJ. 30th April 1918. CJ18/E30418. Referring to the attached letter from the Association of British Motor and Allied Manufacturers Ltd., dated 29th April, with reference…
| |
|
scan0007 |
Letter from the Motor Industry Branch Committee requesting a statement of material requirements for experimental post-war models.
| |
|
View original record |
The ASSOCIATION of BRITISH MOTOR and ALLIED MANUFACTURERS Ltd. TELEGRAMS: ABRITIMAM,PHONE,LONDON. TELEPHONE: GERRARD 1744. SECRETARY HORACE WYATT. 39, St James's Street. London. S.W.1. Ref: No: B.16.…
| |
|
scan0008 |
Material and component specifications for the second batch of 500 40/50 HP chassis.
| |
|
View original record |
To Ey. From En. Copy to Moy. HH Ds. Wd. EFC. - 1 - 74554 Bn15/W8.8.19. 40/50 HP. CHASSIS. ------------------ RE MATERIAL FOR SECOND 500 CHASSIS. ---------------------------------- By2/F7.8.19 &…
| |
|
scan0009 |
Production holds and design considerations for various vehicle components.
| |
|
View original record |
- 2 - EH15/W.8.19 Contd. has been under consideration as an alternative. unless Mr. Whitehead considers it necessary will be please order no more than 500 Lucas Dynamos. 6. Battery Box and Fittings.…
| |
|
scan0010 |
Ordering schedule for materials and components for a second batch of 500 40/50 hp chassis.
| |
|
View original record |
R.R. 285 A (100 T) (S.F. 575, 16-4-19) G. 2354. X 4554 Bn. from Wd. c. to Hor. c. to EH. c. to Da. c. to Ms. Wd7/NJ11.8.19. 40/50 hp. Chassis - Re Material for second 500 chassis. Referring to your…
| |
|
scan0011 |
Material orders and design decisions for clutch, hub, pistons, and shock absorbers.
| |
|
View original record |
- 2 - Wd7/NJ11.8.19. 7. New Type Clutch Box I understand you will shortly communicate with me regarding this. At present material is ordered for only the first 250 chassis and material for another 250…
| |
|
scan0012 |
Material instructions for the second batch of 500 40/50 HP chassis.
| |
|
View original record |
R.P. 235 s (200 T) (S.F. 103, 25-10-18) G. 2241. X4554 To Ry. from Bn. (struck through) C. to Mor. (struck through) RH. (struck through) HW. (struck through) EFC. (struck through) 40/50 HP. CHASSIS.…
| |
|
scan0013 |
Sourcing of wheels from Michelin or Dunlop for the next series of 500 chassis.
| |
|
View original record |
R.R. 235. B (200 T) (S.F. 103 25-10-18) G. 2244 X10554 Bn. from Wd. c.to Wor. c.to EH. c.to Da. c.to Ms. Wd9/NJ15.8.19. 40/50 hp.Chassis - Re Material for second 500 chassis. Further to mine…
| |
|
scan0014 |
On the decision to continue using wire wheels for the second 500 40/50 HP chassis due to Michelin Disc Wheels being untested.
| |
|
View original record |
To Wd. from Bn. c. to Wor. c. to EH. c. to BY. c. to Da. c. to Ms. X4554 Bn5/W19.8.19. 40/50 HP. CHASSIS - RE MATERIAL FOR Wd7/NJ11819.SECOND 500 CHASSIS. Wd9/NJ15819. As we have not yet tested the…
| |
|
scan0015 |
Material instructions for the first 1000 40/50 HP chassis.
| |
|
View original record |
X4554 BY/JH17/R. 9. 9. 19. RE 40/50 H P CHASSIS. RE MATERIAL FOR FIRST 1000 CHASSIS ------------------------------------ The following parts may be instructed:- E DEPARTMENT Pressure Feed Pump. Series…
| |
|
scan0016 |
Instructions and production holds for various vehicle components.
| |
|
View original record |
- 2 - fittings to suit the new Shock Absorber. Front Shock Absorber. To be instructed as Series K. that is, the new scheme. Will Mr. Ormerod please see Mr. Day re Stocking, as Mr. Hives informs us…
| |
|
scan0017 |
Status of parts held up for 'N' and 'O' series production.
| |
|
View original record |
X4554 By5/H.4.8.20. Ms. c. Hs. c. EFC. c. Mr. Booth. c. Mr. Shelton. c. Mr. Robinson. ---------------- MATERIAL. - FE PARTS HELD UP ON "N" AND "O" SERIES. --------------------------------- Referring…
| |
|
scan0018 |
The type of ignition tube to be used for the 'N' series engine and the potential scrapping of ordered fibre tubes.
| |
|
View original record |
Contd. -2- By5/H.4.8.20. the end of "N" series using the same type ignition Tube as we used on J, K, L, and M. it is possible that we shall have to continue to use this type of tube right through, but…
| |
|
scan0019 |
Material ordering for 500 chassis, proposing a change from heavy steel castings to lighter sheetmetal pressings and drop forgings.
| |
|
View original record |
To Wd. from R. Copy to CJ. " " Wor. " " Hs. " " Da. " " By. X4554 R19/G23.8.20. X 4554 (crossed out) X.4072. (crossed out) X.4062. (crossed out) RE ORDERING OF MATERIAL FOR FURTHER 500 CHASSIS. £ With…
| |
|
scan0020 |
The in-house production of parts for 500 chassis, rather than ordering them in cast steel.
| |
|
View original record |
XC4554 R. from Wd. c.to GJ. c.to Wor. c.to Hs. c.to Da. c.to Bv. Wd6/NJ26.8.20. Material we are now ordering for 500 chassis. In reply to yours R19/G23.8.20, we are not placing orders for exhaust…
| |
|
scan0021 |
Held-up sections of the 'R' Series material pending experimental improvements.
| |
|
View original record |
X.4584 RECEIVED STAMP: E F C FEB 12 BY10/H. 11. 2. 21. EFR X.2565 "R" SERIES MATERIAL. The following sections have been held up in view of the possibility of the Experimental Dept. wishing to bring in…
| |
|
scan0022 |
Component standardization for push-button switches, pistons, and magnetos.
| |
|
View original record |
- 2 - (Handwritten: X.2641, X.3660) e. Push Button Switch, Main Switch, Actuating Box. ------------------ Are we to proceed with the standard scheme as at present, with parallel circuits, or will the…
| |
|
scan0023 |
Material choices and component design for the 'R' series, including wiring schemes and engine feet.
| |
|
View original record |
X4554 Hs. from By. c. EFC. EY1-P23.3.21. X.4165 - "R" SERIES - MATERIAL. X.2778c. X4554 X.4172. X.3660. Referring to the material which is held up on various sections in view of possible improvement…
| |
|
scan0024 |
Ceasing material orders for the 40/50 HP and planning for a new 40 HP chassis after the 'Goshawk II' project.
| |
|
View original record |
To WD. from R. Copy to Lde. HS. RAH. EFO. ✓ X4574 COPY RECEIVED 14 XII 1921 R1/H/10/6/21. X4574 As soon as we have finished with the "Goshawk II" we are going to press forward with another 40 HP.…
| |
|
scan0025 |
From R. to WD. regarding a procedure to maintain production output, referencing Mr. Claude Johnson's views.
| |
|
View original record |
To WD. from R. -2- R1/G10/6/21 Contd. what is wanted to keep the required output going, say, continuously 6 months ahead. This procedure is, I understand, in accordance with Mr. Claude Johnson's…
| |
|
scan0026 |
Status and reconsideration of held-up parts for the 'R' Series production.
| |
|
View original record |
X4554 Hs. from BY. c. EFC. c. Wd/MS. RECEIVED JUL 26 1922 40/50 CHASSIS. RE "R" SERIES MATERIAL. BY6-P25.7.22. In BY10/H11221, when we were pushing hard for production, I gave you a list of certain…
| |
|
scan0027 |
Dynamo proposals (Smith's vs Lucas) and rear engine feet material (steel castings vs drop forged).
| |
|
View original record |
BY6-P25.7.22. contd. - 2 - (8) (7310) Dynamo. The proposal at this time was, that we should use the Smith's outfit, but here again this has probably died out and you probably intend to go along with…
| |
|
scan0028 |
Testing a soldering flux named 'Chemico' and requesting more for further experiments.
| |
|
View original record |
X4554 Wd. from BY. c. Hs. BY3-P11.9.22. MATERIAL - RE SOLDERING FLUX. Mr Dale submitted a soldering flux to me, marketed under the name "Chemico". I have had various materials soldered together by the…
| |
|
scan0029 |
Material and modification instructions for the production of 250 Goshawk 11 chassis.
| |
|
View original record |
XG554 Md. c. Wd/Ms. c. Hs. c. "D" Dept. c. "H" " c. "S" " c. "G" " BY5-F29.9.22. GOSHAWK 11. MATERIAL. In view of the fact that we are to go ahead quickly with 250 sets of material and put Goshawk…
| |
|
scan0030 |
Continued list of production decisions for various vehicle components up to a quantity of 250 sets.
| |
|
View original record |
BY5-P29.9.22. contd. - 2 - M. contd. but arranged for a larger diameter fan to be ordered up for all chassis after the first 20, the combination being the original bracket and drive, original diameter…
| |
|
scan0031 |
Instructions for parts including the improved type box, horn & fittings, and distribution board.
| |
|
View original record |
BY5-P29.9.22. contd. - 3 - 19.ctd. as the improved type box, which is being handed to Hs, has certain advantages. 20. Horn & Fittings. Increase orders to 100 sets of the present type and keep going to…
| |
|
scan0032 |
Material requirements and modifications for the 'R' Series 40/50 HP chassis.
| |
|
View original record |
X4554 Wd. c. Wd/Ms. c. D.Dept. C.F " " S.C. c.Hs. BY3/P. 29.9.22. 40/50. H. P. CHASSIS. "R" SERIES MATERIAL. The only parts which it is necessary to hold up on "R" Series, owing to changes between "P"…
| |
|
scan0033 |
Continued memorandum listing components affected by a design change and a decision on steering wheel implementation.
| |
|
View original record |
- 2 - BY3-P. 29.9.22. Contd. -------------------- This change will therefore affect the following items:- 1. Governor Drive. 2. Distributer Drive. 3. Ignition Coil. 4. Ballast Resistance. 5. Oil Pump.…
| |
|
scan0034 |
Material release and potential design improvements for Goshawk II series components.
| |
|
View original record |
XL554 RECEIVED Dept. C. Wd. c. Hs. c. EF. c. SFT. BYS-P13.10.32. GOSHAWK II. MATERIAL. With reference to what we consider for the moment Goshawk II Series material, I have discussed this fully with…
| |
|
scan0035 |
Listing parts not required and to be modified for the 40/50 HP 'R' Series chassis.
| |
|
View original record |
X4554 BY/C6/H.17.10.22. WG. C. WG/Mr. C. F. Dept. C. HS. RECEIVED OCT 18 1922 40/50. H.P. CHASSIS. MATERIAL FOR "R" SERIES. -------------------------------------------- Further to our BY3/P. 29.9.22.…
| |
|
scan0036 |
Modifications and improvements for the 20 HP chassis material.
| |
|
View original record |
X4554 Mr. Hives. Mr. Beard. Mr. Hall. Mr. Rowledge. C. Hs. BY/C12/H. 26.2.23. 20.HP. CHASSIS MATERIAL. -------------------- The question of modifications to be included in the next series has been…
| |
|
scan0037 |
List of technical instructions for various automotive components.
| |
|
View original record |
- 2 - BY/C12/H. 26.2.23. ------------------ Carburetter. ------------ The larger collar should be removed from the low speed valve E.51940. and cork washers should be used for the petrol level…
| |
|
scan0038 |
Specifications for radiator, wiring, and front/rear spring fittings.
| |
|
View original record |
- 3 - Radiator. -------- The present type should be instructed but to be altered to suit the larger water connections. H. instructs that we should have nickel silver shutters therefore these should be…
| |
|
scan0039 |
List of agreed modifications and material instructions for the next series of 40/50 HP Chassis.
| |
|
View original record |
40/50. HP. CHASSIS - MATERIAL. Please note it has been agreed between Hs. and By. that the follow ing modifications should be instructed for the next Series of 40/50. Chassis material. Crank shaft.…
| |
|
scan0040 |
Essential release of all material for the 20HP Chassis, series 751-1000, by a new deadline.
| |
|
View original record |
U X4554 Hs. BY10-P25.6.23. 20HP CHASSIS. MATERIAL FOR SERIES 751-1000. In talking the matter over with Wd, in view of the increased time requirements specified by the O.O. it is essential that in…
| |
|
scan0041 |
Status report on materials and components for the 20HP chassis, batch 751-1000.
| |
|
View original record |
"D" Dept. c. Hs. C. Wd. X4554 BY18-P25.6.23. 20HP CHASSIS. 751-1000. MATERIAL. (1) S.S. Motor Armature. O.K. (2) S.S. Motor Bearing Bracket & Brush Holders. O.K. (3) S.S. Motor Commutator. O.K. (4)…
| |
|
scan0042 |
Continued memo discussing the Dashboard Ignition Terminal and Body Lighting Junction Box, with instructions for ordering.
| |
|
View original record |
BY18-P25.6.23. contd. - 2 - (18) Dashboard Ignition Terminal - this is not required for the Series in question. (19) Body Lighting Junction Box. O.K. Hs. will have to settle up within the next…
| |
|
scan0043 |
Material and component status report for the 20HP chassis, series 751-1000.
| |
|
View original record |
X4554 "G" Dept. c. Hs. c. Wd. BY17-P25.6.23. 20HP CHASSIS. 751-1000. MATERIAL. (1) Flywheel & Clutch. O.K. (2) Gearbox & Actuating Gear. O.K. (3) Speedometer Drive: O.K. (4) 1st & 3rd Motion: O.K. (5)…
| |
|
scan0044 |
List of material and design updates for 20HP chassis numbers 751-1000.
| |
|
View original record |
"F" Dept. c. Hs. e. Wd. 14554 BY16-P25.6.23. 20HP. MATERIAL FOR CHASSIS 751-1000. (1) Frames & Fittings. O.K. (2) Wings, Running Boards and Valances. These may be considered satisfactory if the lamp…
| |
|
scan0045 |
Continued checklist of vehicle components and their approval status, with additional instructions.
| |
|
View original record |
BY16-P25.6.23. contd. - 2 - (15) Autovac. O.K. (16) Shock Absorber, front and rear. O.K. (17) Instrument Board. O.K. (18) Battery & Fittings. O.K. (19) Horn & Fittings. O.K. (20) Wiring & Fittings.…
| |
|
scan0046 |
Correcting details for the 20 HP chassis 751-1000 regarding steel wheels and front axle control.
| |
|
View original record |
BY. from Hs. X4554 Hs5/LG29.6.23. 20 HP. MATERIAL FOR CHASSIS 751-1000 Item 3. in your memo. BY16/P25.6.23 states - "In connection with the steel wheel when this becomes standard, Hs. says they had to…
| |
|
scan0047 |
Listing parts to be held up for the 20-HP chassis, numbers 751-1000.
| |
|
View original record |
To Md. C. to Bfl. C. to TB. C. to BP. C. to CHAF. C. to My/c. C. to Off. Dept. C. to Wor. for Int. C. to RHD. C. to HR. 20-HP. CHASSIS. MATERIAL FOR CHASSIS 751 - 1000. Further to our memo'…
| |
|
scan0048 |
Parts list for the petrol tank, pedals, operating gear, dashbrackets and footboards.
| |
|
View original record |
-2- BY/HEB2/W.2/7/23(Contd). SEC:7080.- L.o.P. P.50946- PETROL TANK.-(CONTD.) F.51262 - Spindle. 1 off per chassis F.51266 - Crown Wheel. 1 " " " F.51268 - Pinion. 1 " " " F.51269 - Bearing for Gears.…
| |
|
scan0049 |
Material composition and properties of aluminium pistons, comparing hard and soft results.
| |
|
View original record |
45524 BY. E... g. Sft. c. Hs. O...Hm. EP9/Hl8.7.23. re. ALUMINIUM PISTON MATERIAL. With reference to the trouble we have had recently in regard to pistons which we have considered rather too soft, and…
| |
|
scan0050 |
Piston alloy composition, specifically copper and iron content, and issues related to heat treatment, distortion, and cracking.
| |
|
View original record |
- 2 - " In view of the softness of the pistons which are low in tin and copper, we are seriously considering the advisability of calling for copper 7.5% to 8.5% . It is the harder pistons of which…
| |
|
scan0051 |
Piston troubles, annealing processes, and a special 'Nelson' type piston.
| |
|
View original record |
- 3 - and on which the only attention required on test is to ease the hard spots which show up after running, and which will not necessarily be consistent in the same place. I should also like to draw…
| |
|
scan0052 |
Material list for the 'T' Series chassis, comprising 200 units.
| |
|
View original record |
x4554 BY/HEB4/W.27/7/23. [Crossed out text] Sent: C. to Bro. C. to HB. C. to SP. C. to CHAT. C. to W/Off. C. to T.T. Dept. C. to Works for Est. C. to Hs. 40/50 CHASSIS. MATERIAL FOR "T" SERIES…
| |
|
scan0053 |
Continuation sheet listing components with their associated Section and L.O.P. numbers.
| |
|
View original record |
-2- BY/HEB3/W.25/7/23.(Contd). SEC: L.O.P. TITLE. NO. NO. 7250. F.6532. Electromotor Suspension. 7290. F.9755. Battery and Fittings. 7320. F.9477. Dynamo Suspension. 7340. F.6139. Horn and Fittings.…
| |
|
scan0054 |
Instructions for ordering material and outlining special features for the 40/50 chassis, series 'T'.
| |
|
View original record |
X4554 Dept. a. b. c. Wd. c. Hs. BY/CS/F19.12.23. MATERIAL FOR 40/50 CHASSIS. SERIES 'T'. Wor. has instructed in accordance with CJ's authority to immediately proceed to order material for the first…
| |
|
scan0055 |
Specifications and modifications for various chassis components.
| |
|
View original record |
BY/C5/F19.12.23. contd. - 2 - DASHBRACKETS & FOOTBOARDS. To be of the new type. FRONT SHOCK ABSORBERS. Same as present standard excepting that they should be modified to suit. PRESENT 40/50 GEARBOX…
| |
|
scan0056 |
List of production instructions and material changes for the 20HP chassis, commencing chassis 1001.
| |
|
View original record |
4554 Mr Shelton. Mr H'leth. Mr Booth. Mr Davis. c. Hs. BY/C3/P29.3.24. 20HP CHASSIS. MATERIAL. Further to BY/C1/H26.3.24. the various outstanding experiments have been discussed with Hs, and it has…
| |
|
scan0057 |
Continued memorandum regarding dashboard and starter switch modifications, with a request for standardisation sheets.
| |
|
View original record |
BY/C3/F29.3.34. contd. - 2 - Dashboard to suit new Radiator & Bonnet. D. SECTION. Starter Switch with thinner gauge contacts and Positive Release. We should be glad if Hs. would issue standardisation…
| |
|
scan0058 |
Material specifications and changes for the 'G' Series vehicles.
| |
|
View original record |
44554 Secret. D.R. F.R. W.H. C. Hs. C. Hn. BYG/H. 13. 3. 25. "G" SERIES MATERIAL. Referring to BYG/H. 5.3.25. will you kindly note that the above memo defining what the material for "F" Series was…
| |
|
scan0059 |
The decision on ordering front springs.
| |
|
View original record |
- 2 - BYG/H. 13.3.25. 6. Front springs will not be ordered at present as we shall depend upon the 38" unequal ended spring which will be ultimately ordered for FWB. In "D" Dept. no alteration will be…
| |
|
scan0060 |
Proposal outlining material ordering and feature incorporation for the 'W' Series car, referencing modifications to the subframe, gear mechanism, and radiator.
| |
|
View original record |
Secret, C. BJ C. Mor. C. HS. BYL/H. 25.3.25. "W" SERIES MATERIAL. In ordering up material for "W" Series, I do not propose to introduce doubtful new features in this proposal; although on "V" Series…
| |
|
scan0061 |
Suggestion for an integral shutter and radiator design while retaining existing bonnet and dash dimensions.
| |
|
View original record |
- 2 - BYL/H. 25.3.25. -------------- very desirable feature indeed, in my opinion, so much so that even if we retain the present dimensions of radiator bonnet and dash, I would suggest that an…
| |
|
scan0062 |
Improvements and variations for the 'W' Series material.
| |
|
View original record |
44554 P.Dept. A.C. Order Office. Hs. ********** BY5/H. 27.3.25. ************* "W" SERIES MATERIAL. ***************** Further to my memo BY10/H. 24.3.25. instructing the material for "W" Series up to a…
| |
|
scan0063 |
Instructions to order materials for 300 sets of a 40/50 HP chassis and a discussion on related mechanism modifications.
| |
|
View original record |
X4554 BY18/H. 29.4.26. A. Depts B. C. HS. D. E. F. G. HS. We have received instructions from HJ, through WG, permitting us to order up 300 sets of material for a further series of 40/50 HP. chassis. I…
| |
|
scan0064 |
Standardization of parts including the front axle, wheels, shock absorbers, and petrol tank for a new vehicle series.
| |
|
View original record |
- 2 - The front axle will have to be the present standard. I do not see any possibility of bringing in the new front axle for this series, although here again it would possibly be policy to order up…
| |
|
scan0065 |
Differences between 'W' Series and 'V' Series components and proposing a course of action for standardization.
| |
|
View original record |
Urgent. 44554 [REDACTED STAMP] c. Hs. "W" SERIES MATERIAL. Now that a Standardization Sheet has been issued in connection with "V" Series, it is necessary that I should draw your attention to the fact…
| |
|
scan0066 |
Design and use of 'X' Series frame side members and a luggage grid.
| |
|
View original record |
Urgent. EJ. c. BJ. L. Hcr. c. Hs. "X" SERIES MATERIAL. ------------------- Referring to BY12/H. 30.6.25, the same points apply to "X" Series as to "W", with the exception that none of the material is…
| |
|
scan0067 |
Recommendation regarding frame modifications for a luggage grid on the 'X' Series chassis.
| |
|
View original record |
- 2 - In the event of it not being considered desirable to incorporate the frame extension to suit the luggage grid and the new luggage grid itself, it is possible for us to cut off the extension,…
| |
|
scan0068 |
Changes and parts ordering for the 20 HP 'K' Series chassis.
| |
|
View original record |
+1554 D. Dept. E. " F. " G. " Ex/SS. Wd. HS. BY2/H. 5.7.26. 20 HP. CHASSIS. "K" SERIES. As the Administration are afraid that difficulties may arise if we put off the ordering of the material to the…
| |
|
scan0069 |
Authorizing part orders and modifications for the 40/50 HP C.2 Series chassis.
| |
|
View original record |
+4554 D. Dept. E. " F. " G. " PY/SS. Wd. Hs. BY3/H. 5.7.26. 40/50 HP. CHASSIS. C.2. SERIES. I have received consent from BJ. and R. is also in agreement, that we should order up the lightened type…
| |
|
scan0070 |
Design decisions for a new front axle, gearbox, silencer mechanism, and cast dash for the D.2 series.
| |
|
View original record |
X4554 BY4/H. 20.12.26. ***************** MATERIAL D.2.SERIES RECEIVED Please note that the new front axle with the central boss carrying the operating shaft slightly inclined to the axis of the axle,…
| |
|
scan0071 |
List of proposed modifications for the 40/50 HP, E.2 series chassis, requesting an update on standardization tests.
| |
|
View original record |
Hs. X4554 BY/Cgh16/G.10.3.27. Hs [STAMP: RECEIVED MAR 11 1927] 40/50 HP. CHASSIS - E.2. SERIES MATERIAL. --------------------------------------- Instructions are about to be issued for 200 sets of…
| |
|
scan0072 |
List and standardization of modified parts for the next series of production.
| |
|
View original record |
48554 To BY. from Hs/Rm. E2. SERIES MATERIAL. X 3066 With reference to the list of modified parts about which you wish to have information before ordering material for the next series. The simplified…
| |
|
scan0073 |
Search for a new, blemish-free radiator material and evaluating a potential new nickel alloy.
| |
|
View original record |
WHO. Hs. C. Roy. X4554 BY1/H. 15.6.27. RADIATOR MATERIAL. In an attempt to obtain a radiator material which could be produced free from blemishes which are giving us so much trouble, we have been…
| |
|
scan0074 |
Requesting a report on experimental work for various vehicle components.
| |
|
View original record |
To RHC. X4554 BY/SS1/DB.20.10.27. Experimental Work. As the Drawing Office is about to order a further Series of Material, will you please report as much as possible, on the undermentioned items:-…
| |
|
scan0075 |
Confirming a telephone communication to continue using standard material for the first half of the F.2 series.
| |
|
View original record |
Wor. Hs. c. BJ. V455E BY5/G.20.12.27. MATERIAL FOR F.2 SERIES. I wish to confirm that I have received a telephone communication from BJ's secretary telling me that we must continue with the standard…
| |
|
scan0076 |
Changes to chassis materials for the Phantom F.2 and 20 HP 'M' series chassis.
| |
|
View original record |
BY/CS. Sft. ROY. C. Wor. c. Hs c. BY/HEB X4559 BY4/G.20.12.37. CHASSIS MATERIAL. Referring to the Phantom chassis material for F.2, the position now is as follows : 1/- We are making the whole series…
| |
|
scan0077 |
Clarifying the use of 'standard material' for the F.2. Series, specifically the radiator and spare wheel carrier.
| |
|
View original record |
X.4554 To BY from BJ. Copy to Wor. Material for F.2. Series. BJ3/E21.1227 Copy to Hs. With reference to BY5/G20.12.27, your memo. is correct in regard to radiator and spare wheel carrier, but I am not…
| |
|
scan0078 |
Material and feature updates for the F.2 series.
| |
|
View original record |
BJ. c. Wor. c. Hs. X4558 BY9/G.23.12.27. MATERIAL FOR F.2 SERIES. With reference to BJ3/E.21.12.27. my previous memo was of course dealing only with the material affected by the new radiator and the…
| |
|
scan0079 |
Authorising material orders for 40/50 HP and 20-HP chassis and discussing future modifications.
| |
|
View original record |
X4554 To-Boys. from Wor. c to BY. (crossed out) c to Sft. (crossed out) c to Hs. Wor3/T.24.2.28. ****************** Will you please order material for:- 40/50 H.P. Chassis .... G-2 Series... 200 sets…
| |
|
scan0080 |
Standardization of a Rear Wheel Carrier and a Turbulent Head for the F-2 series.
| |
|
View original record |
-2- Wor3/T.24.2.28 contd. 2. REAR WHEEL CARRIER. If Hs. confirms that this has now done 2500 miles, it can be standardised in the second half of F-2 series. 3. TURBULENT HEAD. We understood from Hs.…
| |
|
scan0081 |
Production challenges and delays for the new 20 HP and 40/50 HP chassis, urging the Drawing Office to expedite arrangements.
| |
|
View original record |
X4554? BY. from ROY. c. to Wcr. c. to Hs. c. to Eft. ROY11/MG7.3.28 New Series - 20 HP. Chassis, Series "N" 40/50 HP Chassis, Series "G.2" Although these were only released by the Administration on…
| |
|
scan0082 |
The urgent ordering of material for New Series 20 HP and 40/50 HP chassis to meet increased demand.
| |
|
View original record |
X4554 To BY. from Wor. c to Hs. c to Sft. c to Roy. [struck through] Wor5/T.8.3.28. New Series - 200 - 20 HP Chassis, Series "N". 200 - 40/50 HP Chassis, Series "G.2". With reference to ROYll/MG/3.28…
| |
|
scan0083 |
List of proposed improvements for the next series of 100 Phantom cars.
| |
|
View original record |
To R. from Hs. c. to BJ. Wor. c. to E. DA. c. to BY. 44554 Hsl/LG24.4.28. PHANTOM IMPROVEMENTS. X.8770 X.4663 X.7770 X.4554 The C.O. are pressing for the release of instructions for producing a…
| |
|
scan0084 |
Parts ordering and modifications for the 12-EX car based on testing results.
| |
|
View original record |
contd :- -2- in conjunction with the scheme got out for the central oiling, we could reduce the number of Enots lubricators to be hand-oiled. All these parts are fitted to 12-EX car which is at…
| |
|
scan0085 |
List of proposed material and design changes for the Phantom G.2B series chassis based on experimental fittings to chassis 12-EX.
| |
|
View original record |
Hs. 44554 BY/Cgh6/G.12.5.28. PHANTOM CHASSIS - G.2B SERIES MATERIAL. --------------------------------------- With reference to the standardisation sheets which have been circulated in connection with…
| |
|
scan0086 |
Proposed material changes for the 'N' series 20 HP chassis, including a higher radiator and increased headlamp height.
| |
|
View original record |
X4554 O.O. Sft. c. Hs. C. E. Dept. C. F. Dept. BY6/G./21.5.28. 20 HP. CHASSIS - 'N' SERIES MATERIAL. ------------------------------- On the second half of 'N' series material we have already, owing to…
| |
|
scan0087 |
List of experimental 'N.P.P. Chassis Material' parts that were never fitted into service, seeking advice on their disposal.
| |
|
View original record |
By from Wd. c. to EFC. X.4554? Wd9/NJ6.7.28. N.P.P.Chassis Material. Included in this material are many items which I am told have been made experimentally and have never been fitted in chassis which…
| |
|
scan0088 |
Continued parts list index with corresponding reference numbers.
| |
|
View original record |
-2- Wd9/NJ.6.7.28 contd. D70635 A.B.Bracket Rough 265 D70636 Armature Rough 115 D70640 Clamping Plate Rough 116 D70643 Copper Connection 145 D70646 End Plate 152 D70651 Copper Connection 150 D70652…
| |
|
scan0089 |
Parts list with corresponding reference numbers and a memo regarding a Sequence Starter.
| |
|
View original record |
-3- Wd9/NJ6.7.28 contd. D70776 Spring 96 D70778 Cable Pressing 127 D70779 Screw 234 D70781 Spring 99 D70782 Cable Eye 219 D70783 Face Plate 104 D70784 Screw 130 D70786 Spring 101 D70788 Ring 158…
| |
|
scan0090 |
Recommending that chassis material parts that cannot be used for production or modified should be scrapped.
| |
|
View original record |
c. to EFC. X455 BY/MtnlC/Nl8.7.28 N.P.P. CHASSIS MATERIAL. Referring to your memo WD9/NJ6.7.28 we see no prospects of any of the parts referred to being required for production and we suggest that any…
| |
|
scan0091 |
List of modifications for the 40/50 HP J.2 Series chassis components.
| |
|
View original record |
44554 E. Dept. F. Dept. G. Dept. D. Dept. c. ROY. c. Hs. c. Sft. c. DWP. c. Ws. RECEIVED 11 FEB 1929 SH 40/50 HP. CHASSIS - J.2 SERIES MATERIAL. Further to BY/Cgh12/N16.1.29. the various modifications…
| |
|
scan0092 |
List of production instructions for modifications on various vehicle components.
| |
|
View original record |
- 2 - instructed for production :- LeC.2659 Carburetter - Silencer for Vacuum Pump Connection. LeC.2642 Carburetter Mixture Adjustment. The air valve should be held up as some modification will be…
| |
|
scan0093 |
List of production instructions and modifications for various vehicle components.
| |
|
View original record |
- 3 - BY1/G.9.2.29. N.Sch.2794 Strengthened Front Damper Casing. N.Sch.2795 Strengthened Shaft for Front Dampers. N.Sch.2817 Improved Ball Pin L'brn.Front Dampers. Rear Hydraulic Dampers. To be…
| |
|
scan0094 |
Listing vehicle components by section and their production release status.
| |
|
View original record |
- 4 - BY1/G.9.2.29. coupling shown on N.Sch.2812, which should be held up until tests have been made. 'D' SECTION. Press Buttom Switch. To be instructed for production as per Lec.2641. Auxiliary…
| |
|
scan0095 |
Confirming verbal instructions to hold materials for wire wheels and frame cross members pending a decision.
| |
|
View original record |
[strikethrough: O.O.] c. Wor. c. Hs. [strikethrough: c. BY/TWD.] [strikethrough: c. BY/HEB.] [strikethrough: c. BY/RD.] S.S. MATERIAL. ---------- I wish to confirm my verbal instructions over the…
| |
|
scan0096 |
Authorisation to order 100 sets of material for the 20 HP chassis 'P' series, with clarifications on specific parts.
| |
|
View original record |
XU554 E. Dept. F. Dept. D. Dept. G. Dept. C. Hs. C. O.O. C. Wor. BY2/G.19.4.29. 20 HP. CHASSIS MATERIAL. --------------------------- We have been authorised and instructed to order 100 sets of…
| |
|
scan0097 |
Material requirements and engine alterations for the 20 HP Chassis 'P' Series.
| |
|
View original record |
Y4554 BY11/G.24.4.29. 20 HP. CHASSIS MATERIAL 'P' SERIES. Please note that as there is a very big possibility 'P' series will include an engine with a larger bore, but otherwise the engine will be…
| |
|
scan0098 |
Reinstating the short frame for the 'P' Series 20 HP chassis.
| |
|
View original record |
X.4554 ROY. [Struck through] C. E. Dept. [Struck through] C. D. Dept. [Struck through] C. F. Dept. [Struck through] C. G. Dept. [Struck through] C. Wor/ks. [Struck through] C. Hs. BY1/G.8.5.29. 'P'…
| |
|
scan0099 |
Asking for an opinion regarding the scrapping of manufactured parts for the Continental Chassis.
| |
|
View original record |
To EY. " HS. Wor. absent. Hyl/H.17.5.29. +4534 Chassis Parts in abeyance. Parts manufactured for Continental Chassis. With reference to copy of WH9/AD7.5.29., attached, will you please let me have…
| |
|
scan0100 |
Disposal of manufactured parts for the Continental Chassis.
| |
|
View original record |
G. from Wd. c. to Hy. COPY. Wd9/AD7.5.29. Chassis Parts in abeyance. Parts manufactured for Continental Chassis. With mine Wd1/AD24.10.28 (to G) I sent (to G) an inventory Wd2/AD24.10.28 of parts…
| |
|
scan0101 |
Disposal of materials for a chassis that was never put into production.
| |
|
View original record |
(2) WD 9/AD 7.5.29...contd. those parts which could not be used were included in the inventory already referred to. The parts have no interest for Repair Dept, as the chassis never went into…
| |
|
scan0102 |
Decision to scrap surplus chassis parts for the Sports type Continental model.
| |
|
View original record |
Hs c. Hs. X4554 BY/Cgh4/G.24.5.29. ADDITIONAL CHASSIS PARTS IN ABEYANCE. With reference to Wd9/AD.7.5.29. copy of which is attached to Hy1/H17.5.29., since the Works have used or kept in stock any…
| |
|
scan0103 |
Decision to proceed with issuing instructions and part lists for 40/50 HP K.2 series material.
| |
|
View original record |
E. Dept. F. Dept. G. Dept. D. Dept. C. O. c. Hs. BY2/G.13.8.29. 4654 40/50 HP. - K.2 SERIES MATERIAL. It has been decided at a Conference in Wor's office on the 12th inst. that we should go ahead and…
| |
|
scan0104 |
Outstanding materials and changes to be instructed for the second half of the 40/50 HP Chassis K.2 series.
| |
|
View original record |
E. Dept. F. Dept. G. Dept. D. Dept. C. Div. C. Hs. BY/Cghl/G.23.10.29. 40/50 HP. CHASSIS - K.2 SERIES MATERIAL. --------------------------------- Please note the following outstanding items for the…
| |
|
scan0105 |
Instructions for the exhaust fittings and cutout for the second half of the 40/50 HP Chassis K.2 series.
| |
|
View original record |
WOR. c. ROY. c. Hs. c. Sft. BY/Cgh2/G.23.10.29. 40/50 HP. CHASSIS - K.2 SERIES MATERIAL. With reference to ROY/Ms1/P.17.10.29. we have now issued instructions for the exhaust fittings and cutout for…
| |
|
scan0106 |
Instructions to proceed with material for the 40/50 HP. Chassis, L.2 Series, noting specific exceptions and modifications.
| |
|
View original record |
E. Dept. F. Dept. G. Dept. D. Dept. C. ROY. C. Sft C. Hs. BY/Cgh3/G.23.10.29. 40/50 HP. CHASSIS - L.2 SERIES. Permission is being obtained by ROY. to instruct material for 40/50 HP. chassis, L.2…
| |
|
scan0107 |
Programme for 40/50 HP Chassis, Series L.2, detailing chassis number allocation.
| |
|
View original record |
To DPT. from ROY. c. to MP. [crossed out] c. to WP. [crossed out] c. to G. [crossed out] c. to Hs. [crossed out] c. to Ms. (O.O) [crossed out] ROY5/MG11.11.29 40/50 HP. CHASSIS - SERIES L.2 divided…
| |
|
scan0108 |
Production schedule and material order dates for 40/50-HP Chassis Series 'L2'.
| |
|
View original record |
ROY2/MG4.11.29 40/50-HP CHASSIS - SERIES "L2." L2-A. 6013 - 6112. L2-B. 6113 - 6212. Number of Chassis in Series ................... 200. Proposed Output ............................... Average 11 per…
| |
|
scan0109 |
Outlining a disagreement on the release dates for a further 200 chassis, proposing an alternative schedule.
| |
|
View original record |
-ROY- from SFT. c. Ws. C. EWP. c. G. c. Hs. c. MS. SPT.6/B.15.11.29. 40/50.HP. CHASSIS. 'L.2' SERIES. With reference to your memo ROY5/MG11.11.29., enclosing programme for further 200 chassis; we do…
| |
|
scan0110 |
To hold work on specific rear axle bolts for the 40/50-HP 'L.2.' Series chassis.
| |
|
View original record |
To. Roy. c. O.P. Dept. c. T.U. c. Stu. c. G/Rb. c. A/Mt. c. Eff. Dept. c. Wn. Sectt. c. RHC. c. Ws. BY/TWD5/E.18.12.29. 40/50-HP. CHASSIS. REAR AXLE. SECTION 6120. RE. MATERIAL FOR 200 CHASSIS. "L.2."…
| |
|
scan0111 |
To hold work on specific rear brake parts for the 'L.2.' Series chassis.
| |
|
View original record |
To. Roy. C. [Text obscured] C. RHC. BY/TWD1/E.20.12.29. 40/50-HP. CHASSIS. REAR BRAKES. SECTION 6130. RE. MATERIAL FOR 200 CHASSIS. "L.2." SERIES. (CHASSIS 6001 - 6200.). Will you kindly hold up all…
| |
|
scan0112 |
Authorising an order for material for 200 M.2 series chassis, listing parts that differ from the L.2 series.
| |
|
View original record |
[Struck through distribution list: E. Dept., F. Dept., G. Dept., D. Dept., Cr. ROY, c. Hs.] X4554. BY/Cgh3/G.13.1.30. 40/50 HP. CHASSIS - M.2 SERIES. It has been decided to order material for a…
| |
|
scan0113 |
40/50 HP Chassis M.2 Series programme and its division into two half-series.
| |
|
View original record |
X4554. To CPT. from ROY. c. to Es. c. to H-T c. to G. c. to Hs. c. to Ms. ROY6/MG20.1.30 ************************ 40/50 HP. Chassis - Series M.2 divided into two HALF-series 100 Chassis Nos. 6213 -…
| |
|
scan0114 |
Production schedule for the 40/50-HP Chassis - Series M2, detailing quantities, outputs, and key dates.
| |
|
View original record |
ROY4/MG14.1.30 40/50-HP CHASSIS - SERIES M2. M2-A = 6213 - 6312. M2-B = 6313 - 6412. Number of Chassis in Series ................. 200 Proposed Output ............................ Average 12 per week…
| |
|
scan0115 |
Confirming the standardisation of the 20-inch rim and 'Fort' type tyre for the L.2 series.
| |
|
View original record |
ROY. c. Sft. (text crossed out) c. Hs. c. D/PP (text crossed out) c. G. Dept. (text crossed out) c. F. Dept. (text crossed out) c. D. Dept. (text crossed out) Handwritten: x4554. xu554 x8810 x8820…
| |
|
scan0116 |
Wheel and tyre specifications for the L2 series vehicle.
| |
|
View original record |
W/S (C) c. Hs. e. D/DP XC554 BY/Cghl/G.4.2.30. v4554 x 8810 x 8820. SECOND HALF OF L2 SERIES - WHEELS AND TYRES. Please note that the 20" rim has been decided upon as the correct size of wheel for…
| |
|
scan0117 |
Ordering materials for a batch of 20/25 HP 'S' series chassis, listing exceptions.
| |
|
View original record |
Hs. XU 554 BY/Cgh10/G.28.2.30. 20/25 HP. CHASSIS. 'S' SERIES MATERIAL. We understand that Sg. has agreed that sanction for a further batch of 200 chassis shall be given not later than March 8th., and…
| |
|
scan0118 |
Authorizing a further batch of 200 20/25 HP 'S' Series Chassis and enclosing the production programme.
| |
|
View original record |
y4554 To BY. from ROY. c. to HT [struck through] c. to Ws [struck through] c. to EWT [struck through] c. to G [struck through] c. to Ha [struck through] c. to Hm [struck through] *******************…
| |
|
scan0119 |
Production schedule for 20/25-HP Chassis - Series 'S'.
| |
|
View original record |
Ref:- ROY6/MG5.3.30 20/25-HP CHASSIS - SERIES "S". S-A. 3401-3500.. S-B. 3501-3600.. Number of Chassis in Series ................... 200. Proposed Output ............................... Average 8 per…
| |
|
scan0120 |
Directive regarding the material used for exhaust valves on 20 HP and 40/50 HP chassis, changing to S.L.V. steel.
| |
|
View original record |
COPY. X4554 E. Dept. c. Hs. c. Roy. X. 7230 X. 5230 X. 4554 BY.16/G.4.4.30. 20 HP. and 40/50 HP. CHASSIS - EXHAUST VALVES. In view of Mr. Hancock's reports, whilst there is no need to create a panic…
| |
|
scan0121 |
Directive to revert to S.L.V. specification No. 238.A for exhaust valves on 20/25 HP and 40/50 HP chassis.
| |
|
View original record |
E. Dept. Roy. Sft. Hs. Roy/Ms. COPY X4554 Byl6/N.7.4.30. X. 7230 X. 5230 X. 4554 Re. EXHAUST VALVES. It is most important that we should revert to S.L.V. specification No. 238.A. in place of H.R.…
| |
|
scan0122 |
List of modifications and new features for the 40/50 HP Chassis N.2 series material.
| |
|
View original record |
Hs. X4554 BY/Cgh3/G.8.7.30. X.7772. X.7770. X.4554. 40/50 HP. CHASSIS - N.2 SERIES MATERIAL --------------------------------------- We are instructing the following modifications to be incorporated in…
| |
|
scan0123 |
Request to issue standardisation sheets for specific parts and highlighting material hold-ups.
| |
|
View original record |
-2- BY/Cgh3/G.8.7.30. We should be glad if you would issue standard- isation sheets covering these items as soon as possible. Material is still being held up for the following :- (A) Radiator, Bonnet…
| |
|
scan0124 |
Urging for a quick decision on outstanding details for the 40/50 HP N.2 Series chassis to maintain the production schedule.
| |
|
View original record |
To BY. from ROY. c. to Wor. c. to Hs. c. to SFI ROY2/MG5.9.30 I do not wish to press matters unduly, but if we are to maintain output of 40/50 HP. Chassis on the revised reduced basis, whereby the…
| |
|
scan0125 |
Parts for the 40/50 HP Chassis - N2 series that are held up by the Drawing Office (D.O).
| |
|
View original record |
(Roy/AES3/PA4.9.30) Re 40/50 HP. Chassis - N2 series. Parts still held up by the D.O Sec. Description 5250 Radiator. Approx. 24 parts still held up 6000 Flywheel & Clutch (7 parts held up for whole of…
| |
|
scan0126 |
Material release status for the N.2 series parts.
| |
|
View original record |
ROY. c. Wor. c. Hs. c. Sft. X4554. BY/Cgh7/G.10.9.30. RECEIVED SEP 1930 N.2 SERIES MATERIAL. ------------------- With reference to ROY2/MG.5.9.30. the position is as follows :- RADIATOR. We are now…
| |
|
scan0127 |
Release status and issues with various vehicle parts.
| |
|
View original record |
To. Roy. C. Wor. c. Hs. c. Sft. X4584 BY7/N.29.9.30. Re: N.2. Series Material Referring to Royl/MG.29.9.30, there is some mistake in regard to the following parts:- Sec. 5250 Radiator. Released by…
| |
|
scan0128 |
Delayed release of parts details for the 40/50 HP Chassis, N2 Series.
| |
|
View original record |
X4554. To BY. from ROY. c. to Wor. c. to Hs. c. to SPT. ROY5/MG30.9.30 ---------------- 40/50 HP. Chassis - N2 Series BY7/N29.9.30 - Thank you for the details re above. It is noted many of the details…
| |
|
scan0129 |
The proposed production programme for a further 50 20/25 HP 'T' Series chassis (numbers 3701-3800).
| |
|
View original record |
Y4554. To BY AFT Hs T C Hs from ROY. ROY2/MG30.4.31 20/25 HP. CHASSIS - "T" SERIES (2nd half) Chassis 3701-3800 Agreeably with the authority we have received from the Administration to produce a…
| |
|
scan0130 |
Production schedule for the 20/25 HP. Chassis - Series 'T', numbers 3701-3800.
| |
|
View original record |
ROY3/MG18.4.31 20/25 HP. CHASSIS - SERIES "T" T-B - Nos. 3701-3800 Number of Chassis in Series ......... 100 Proposed Output .................... 6 per week including Holidays Authority to proceed…
| |
|
scan0131 |
Specifications for the 'Japan 1 Second Half 'T' Series' 25 HP cars.
| |
|
View original record |
To R. From Hs. c. to Sg. Wor. c. to S. By. c. to Ta. Handwritten: J4 554 Hs.5/MJ.8.5.31. X5770 X45-54 JAPAN 1 SECOND HALF 'T' SERIES. Replying to R1/M7.5.31. It is very important that the…
| |
|
scan0132 |
Proposed improvements and status of various components for a 25 HP model, including springs, axles, and dynamo.
| |
|
View original record |
-2- Hs.5/MJ.8.5.31.Cont'd. ROAD SPRINGS. It is very definite that we make a considerable improvement to the 25 HP. springs by fitting springs of the low rating type. These are fitted to 16-G4 at…
| |
|
scan0133 |
Lengthening of the bonnet and instructions for wheel carriers for the 'T' Series Japan 1 model.
| |
|
View original record |
HS. FROM DA. C. to SC. WOR. C. to E. BY. DA2/M11.5.31. JAPAN 1. - SECOND HALF OF 'T' SERIES. X.5770. K.4554. With reference to HS5/MJ8531, we should like to point out that the lengthening of the…
| |
|
scan0134 |
Schedule of material changes and modifications for the 20/25 HP Chassis 'T' Series.
| |
|
View original record |
84554 E. Dept. F. Dept. G. Dept. D. Dept. c. Hs. C. Rpt. C. NOW. BY/Cgh.9/G.1.10.31. 20/25 HP. CHASSIS MATERIAL - 'T' SERIES. With reference to the second half of 'T' series, Hs. and By. have agreed…
| |
|
scan0135 |
To the Drawing Office regarding items to proceed with and items to slow down for the 'T' series.
| |
|
View original record |
- 2 - BY/Cgh.9/G.1.10.31. the battery suspension, but we propose to use the present standard battery.) Will the D.O. please issue particulars of the items which are to be proceeded with in accordance…
| |
|
scan0136 |
Arranging a meeting to discuss ordering material for the 'U' Series to maintain output.
| |
|
View original record |
Hs. from Wor. X4554. Wor2/GR.24.11.31. MATERIAL FOR 'U' SERIES. Roy. reminds me that we must order material during the next few days for 'U' Series in order to keep up continuity of output. Will you…
| |
|
scan0137 |
Conference memo detailing material ordering for the 'U' Series chassis in response to increased output of the 20/25 HP model.
| |
|
View original record |
Hs. X4554. 25.11.31. MATERIAL FOR 'U' SERIES. Wor. called a Conference this morning in connection with the above, at which the following were present:- Hs. By. Wor. Wor. mentioned that Roy. had…
| |
|
scan0138 |
Material ordering and specifications for the 20/25 HP 'U' Series chassis.
| |
|
View original record |
84554. Hs. By Rey. Spt. Wor3/GR.27.11.31. Re: 20/25 H.P. MATERIAL. "U" SERIES. Sg. has agreed to our ordering material for 100 'U' Series chassis in order that continuity of output can be maintained.…
| |
|
scan0139 |
Delays and modifications for the 20/25 HP Chassis 'U' Series.
| |
|
View original record |
[Stamp: RECEIVED 23 JAN 1932] X4554. ROY. c. Wor. c. Hs. c. Sft. BY/Cgh.10/G. 22.1.32. 100 - 20/25 HP. CHASSIS 'U' SERIES. --------------------------------------- With reference to ROY4/MG.15.1.32. we…
| |
|
scan0140 |
Timing for ordering material for spanners and tools.
| |
|
View original record |
- 2 - BY/Cgh.10/G.22.1.32. In regard to the spanners and tools, we under- stand that there is yet time before it is absolutely necessary to order material. BY/Cgh.
| |
|
scan0141 |
Conference notes regarding the reconsideration of units for the 'U' Series, including the petrol tank and a longer bonnet.
| |
|
View original record |
WOR. c. Hs. c. AEM. c. ROY HS X4554 BY.5/G.26.1.32. MATERIAL FOR 'U' SERIES. CONFERENCE HELD IN ROY'S OFFICE - 25.1.32. PRESENT :- Hs, AEM., ROY, and BY. The following units for 'U' Series were…
| |
|
scan0142 |
Chassis modifications, an order for 100 instrument sets, and a note on delaying non-basic units.
| |
|
View original record |
- 2 - BY.5/G. 26.1.32. Chassis will have new bonnet and dash fitted by Monday evening, February 1st. c/- INSTRUMENT PATCH. It was decided to place an order for 100 sets of instruments with Smiths.…
| |
|
scan0143 |
Material and production instructions for the 'U' Series 20/25 HP chassis.
| |
|
View original record |
X 4554. E. Dept. (crossed out) F. Dept. (crossed out) G. Dept. (crossed out) D. Dept. (crossed out) C. Hs. (crossed out) C. ROY. (crossed out) C. SCI/AEH. (crossed out) C. WS. (crossed out) C. BY/NW.…
| |
|
scan0144 |
Instructions for fitting stronger springs and side spare wheel carriers.
| |
|
View original record |
- 2 - BY./Cgh.18/G.27.1.32. abroad we should continue to fit normal type springs, 10% stronger, as per present practice. In regard to side spare wheel carriers, the scheme as fitted on 18-G-1V. should…
| |
|
scan0145 |
Introduction of a new petrol tank for the 20/25 HP 'U' Series chassis.
| |
|
View original record |
X4554. Wcr. [Struck through] c. Ey. [Struck through] c. Hs. [Struck through] c. Roy. [Struck through] c. Ws. [Struck through] Sft. absent. Sft/AEM/B.27.1.32. 20/25 HP Chassis. 'U' Series.…
| |
|
scan0146 |
Comparing the cost of springs from suppliers Firths and Woodheads, with a suggestion to trial Woodheads springs on certain car models.
| |
|
View original record |
Private By. Hs. Roy from Wor. Y4554. Wor10/T8.2.32. Re Cost of Material. There has been some correspondence between Sg., R. and myself on the question of Cost of Springs in comparison with the cost of…
| |
|
scan0147 |
Expressing alarm over delays in releasing details for the 20/25 HP Chassis 'W' Series.
| |
|
View original record |
Roy. Dr. Hs. SPT. [Struck through] from Wor. X4554. Wor5/T11.2.32. 100 - 20/25 HP Chassis "W" Series. I am distinctly alarmed that we are still awaiting details to be released for these chassis, the…
| |
|
scan0148 |
Preparing orders for 100 sets of material for the 20/25 HP 'V' series chassis.
| |
|
View original record |
Hs. V4554. BY/Cgh.4/G.10.3.32. 20/25 HP. CHASSIS - 'V' SERIES. The Order Office have received permission to prepare orders for another 100 sets of material for 'V' series, and we are advising them to…
| |
|
scan0149 |
Material orders and proposed cost-saving modifications for the 25 HP model.
| |
|
View original record |
X4554. To Wor. From Hs. c. to BY. c. to E. Hs.6/MJ.22.3.32. X5770. 25 HP. MATERIAL. With regard to the further batch of material which has been ordered for the 25 HP. to follow on after 'U' Series. It…
| |
|
scan0150 |
Requesting urgent instructions for the 25 HP model exhaust system due to increased production.
| |
|
View original record |
Hs. from Wor. Copy to BY. and E. X-554 Wor14/T19.4.32. 25 HP Material. With reference to your note Hs6/MJ22.3.32, you will remember it was agreed to hold up instructions for the exhaust system because…
| |
|
scan0151 |
Production policy for 25 HP silencers and trials of a new exhaust scheme.
| |
|
View original record |
X4554 To Wor. From Hs. c. to BY. c. to E. Hs.16/MJ.20.4.32. 25 HP. MATERIAL. Replying to Wor.14/T.19.4.32. We recommend the only safe policy to ensure continuity of output, is to produce a further…
| |
|
scan0152 |
Authorisation to order a further 50 sets of castings and forgings for the 20/25 HP Chassis 'V' Series, with a hold on production machining.
| |
|
View original record |
Rev. from Wor. Sft. Jpg. Hs. x4554 Wor11/GR.20.4.32. 20/25 H.P. CHASSIS - "V" SERIES. Roy19/P.18.4.32. I agree to your going ahead and ordering a further 50 sets of castings and forgings, making 100…
| |
|
scan0153 |
Status of standardisation sheets for 'O' Series material.
| |
|
View original record |
X4554. To By. from Hs/Rn. c. to Wor. Hs/Rn. 2/KT. 27.6.32. P.II. 'O' SERIES MATERIAL. With reference to BY/CGH4/H.S.6.32. We have issued standardisation sheets for everything on this list, except item…
| |
|
scan0154 |
List of modifications for a further 50 sets of '0.2' Series Phantom II chassis.
| |
|
View original record |
Hs. C. Wor. X48554 BY/Cgh.4/G.8.6.32. PHANTOM 11. '0.2' SERIES MATERIAL. ------------------------------------ In accordance with the decision made at the Conference, and instructions we have received…
| |
|
scan0155 |
Hold-up of ordering exhaust material for the 20/25 HP 'W' Series Chassis.
| |
|
View original record |
84554. To Wor. from ROY. c. to BY. (Struck through) c. to Hs. ----------------- re:20/25 HP. CHASSIS MATERIAL ----------------- Wor2/GR.15.7.32 - In accordance with the present instructions outlined…
| |
|
scan0156 |
Recommending to proceed with an order for a further 50 sets of 20/25 HP chassis material.
| |
|
View original record |
X4554. BY. Luy.PT. Copy to Hs. Wor absent. Hy2/T22.7.32. 20/25 H.P. Chassis Material. Roy3/MC21.7.32 and BY/Cgh3/W21.7.32. Hs. recommends continuing with a further 50 sets as before, as his tests will…
| |
|
scan0157 |
Production status of 20/25 HP 'W' Series chassis material, noting holds on certain parts.
| |
|
View original record |
By. Roy. Sft. c. Hs. RECEIVED 12 AUG X 4554. Wor. Absent. Hy3/GR.8.8.32. 20/25 H.P. CHASSIS MATERIAL. Hy2/T22.7.32. *W* Series. The position of this series is now as under:- 1st 50 sets to be exactly…
| |
|
scan0158 |
The production programme for a second batch of 100 20/25 HP 'R-B' Series chassis.
| |
|
View original record |
γ X4554 To SY. from ROY. E.H. W.H.H. A.G.E. A.F.C.S. H.I. REC'D 23 AUG 1932 ROY4/MG22.8.32 20/25 HP. CHASSIS - "R-B" SERIES Second 100 - Nos.4101-4200 Agreeably with the authority received to produce…
| |
|
scan0159 |
Production schedule for the 20/25 HP Chassis 'W-B' Series, second 100, numbers 4101-4200.
| |
|
View original record |
Ref: ROY5/MG19.8.32 20/25 HP. CHASSIS - "W-B" SERIES Second 100 - Nos.4101-4200 Number of Chassis in Series ................... 200 Proposed Output ............................ 8 per week (including…
| |
|
scan0160 |
Supply, testing, and cost-saving of cold-pressed versus hot-pressed nickel frames for the 25 HP chassis.
| |
|
View original record |
X4554. TO BY. from ROY. c. to Wor. c. to Hs. -------------- ROY9/MG29.8.32 -------------- FRAMES You will recollect we had a number of Cold-pressed Frames for both "Peregrine" and "Bensport", and in…
| |
|
scan0161 |
The continued ordering of hot pressed nickel frames until cold pressed frames are approved by the Experimental Department.
| |
|
View original record |
Ex. from Wor. Hs. " " Copy to Roy. X4 554 Wor2/T30.8.32. FRAMES. The answer to Roy9/MG29.8.32 is very simple. We must keep ordering the present type of hot pressed nickel frames until the Experimental…
| |
|
scan0162 |
Requesting an indication of when the Standardisation Sheet for Cold Pressed Frames will be issued.
| |
|
View original record |
x4 554. To BY. from ROY. [BY is crossed out] c. to Wor. [Wor is crossed out] c. to Hs. ROY2/MG31.8.32 Cold Pressed Frames Arising out of ROY9/MG29.8.32 and Wor2/T/30.8.32 re above, kindly advise if…
| |
|
scan0163 |
Standardisation tests for the 20/25 HP chassis cold pressed frames.
| |
|
View original record |
RECEIVED x4554 ROY. c. War c. Hs. BY/Cgh.3/G.1.9.32. 20/25 HP. CHASSIS ---------------- With reference to ROY.2/MG.31.8.32., we consider it necessary to carry out standardisation tests on a 20/25 HP.…
| |
|
scan0164 |
Increase in 20/25 HP chassis output and requesting sanction for further materials.
| |
|
View original record |
X4554. TO Wor. from ROY. c.c. to BY c.c. to SFT. c. to Hs. ----------------- ROY4/MG12.9.32 20/25 HP. Chassis Output ----------------- I am delighted to note from Wor2/GR12.9.32 the good news…
| |
|
scan0165 |
Production schedule and material plan for the 40/50 HP Chassis - 02 Series.
| |
|
View original record |
(ROY2/MG14.9.32) 40/50 HP. CHASSIS - 02 SERIES 6689-6738 Number of Chassis in Series ............. 50 Proposed Output ..................... 2 per week Authority to proceed given ............. June…
| |
|
scan0166 |
Programme for 50 40/50 HP, 02 Series chassis, numbers 6689-6738.
| |
|
View original record |
X 4 S-54 To BY. from ROY. HY CRI S. Hs He ----------------- ROY9/MG19.9.32 ----------------- 40/50 HP. CHASSIS NOS. 6689-6738 - 02 SERIES ------------------------------------------ Enclosed please…
| |
|
scan0167 |
The testing and potential standardisation of 20/25 HP Cold Pressed Chassis Frames.
| |
|
View original record |
84554 To Hs. from ROY. c. to Wor. c. to BY c. to HY c. to E. ---------------- ROY4/MG19.9.32 ---------------- Cold Pressed Chassis Frames F.59190/1 ---------------- The 3 sample pairs of such 20/25…
| |
|
scan0168 |
Ordering materials for exhaust fittings for the 20/25-HP Chassis 'W' Series.
| |
|
View original record |
Wor. (crossed out) c. to Hy. c. to Ha. X4554 ROY/LS13/P.23.9.32. 20/25-HP CHASSIS - "W" SERIES. ------------------------- As you are aware, the Exhaust Fittings for this series has been released up to…
| |
|
scan0169 |
Enclosing a programme for the 20/25 HP 'X' Series chassis.
| |
|
View original record |
X4554 To BT. from ROY. [Text redacted by red lines] ------------ ROY4/M030.9.32 ------------ 20/25 HP. CHASSIS - "X" SERIES X-A. 4201-4300 X-B. 4301-4400 Enclosed please find copy of Programme drawn…
| |
|
scan0170 |
Production schedule and material requirements for the 20/25 HP Chassis 'X' Series.
| |
|
View original record |
ROY2/MG26.9.32 20/25 HP. CHASSIS - "X" SERIES X-A. 4201-4300 X-B. 4301-4400 Number of Chassis in Series.................. 200 Proposed Output............................. 10 per week (including…
| |
|
scan0171 |
Decision to replace the 25 HP model with the J.11 and not order further 25 HP materials.
| |
|
View original record |
X4554. To Wor. From Hs. Hs.1/MJ.7.11.32. With reference to attached. Considering the decision which was made at the conference last week to push on with J.11 to replace the present 25 HP., we do not…
| |
|
scan0172 |
Delaying modifications to the 'O' Series 40/50 Chassis pending a test drive of car 19-EX.
| |
|
View original record |
RECEIVED γ 4554T S/W. To Wor. from Sg. copy to Hs. copy to EV. 1932 Sg4/D7.11.32 Re: 100 of "O" Series 40/50 Chassis Referring to my telephone message of Friday relative to new type carburetter,…
| |
|
scan0173 |
Order for 100 'O' Series 40/50 Chassis.
| |
|
View original record |
Sg. from Wor. c. Hs. c. Ey. [struck through] c. Roy. X4554. Worl8/CR.8.11.32. Re: 100 of "O" Series 40/50 Chassis. Thanks for your Sg4/D7.11.32. We can wait another week without causing, I believe,…
| |
|
scan0174 |
Modifications for the 'O' Series 40/50 HP chassis, deciding against the resonant exhaust for the standard model.
| |
|
View original record |
Hs X 4554. X L 100 x 77-10 To Wor. from Sg. Copy to Hs.BY. ROY.Cx. re 100 of "O" Series Sg14/E16.11.32 40/50 HP Chassis. Referring to Sg4/D7.11.32 and Wor18/GR.8.11.32 we have now completed a very…
| |
|
scan0175 |
Modifications and cost savings for the 20/25 HP Chassis 'X' Series, numbers 101 to 200.
| |
|
View original record |
84554. To Wor. from ROY. c. to BY. c. to Hs. ROY20/MG16.11.32 ---------------- 20/25 HP. Chassis "X" Series - 2nd 100 Nos. 101 to 200 ---------------- You will recollect it was agreed to hold in…
| |
|
scan0176 |
Concluding page of a memorandum to various departments.
| |
|
View original record |
ROY20/MG16.11.32 continued. 2 To Wor. BY Hs. We are concluding you are in agreement with the foregoing, and proceeding accordingly, unless you advise otherwise. ROY.
| |
|
scan0177 |
Material programme for 100 Chassis, Series 'O2' (Second Part).
| |
|
View original record |
Y 4554 RECEIVED 22 NOV 1932 To [REDACTED] [REDACTED] [REDACTED] [REDACTED] From ROY. ROY4/MG21.11.32 40/50 HP. CHASSIS Series "O2" (Second Part) 100 Chassis. O2-B. Nos. 6739 - 6838 Enclosed please…
| |
|
scan0178 |
Production schedule and material requirements for the 40/50 HP. Chassis Series 'O2'.
| |
|
View original record |
(ROY2/MG18.11.32) 40/50 HP. CHASSIS Series "O2" (Second Part) 100 Chassis. O2-B. Nos. 6739 - 6838 Number of Chassis in Series .............. 150 (Increased from 50 to 150 by Wor4/GR20.10.32) Proposed…
| |
|
scan0179 |
Authorising the order of parts and assembly of 20 chassis for the 'Peregrine' project.
| |
|
View original record |
PRIVATE. cft. from Wor. Rey. By. Hs. 84554 Wor2/GR.30.11.32. "PEREGRINE" Please go ahead and order 200 sets of parts, of which we feel sure. Make up 20 of these into finished chassis by obtaining 20…
| |
|
scan0180 |
Material programme for 100 20/25 HP chassis, series Y-A.
| |
|
View original record |
To BY. from ROY. SPT. WS EWT G. Hs. MS. 84554. ROY3/MG2.12.32 20/25 HP. CHASSIS - SERIES 'Y-A' 100 Chassis. Nos. 4401-4500 Enclosed please find copy of Programme covering material for the 100 Chassis…
| |
|
scan0181 |
Production schedule for 100 chassis of the 20/25 HP, Series Y-A, numbers 4401-4500.
| |
|
View original record |
(ROY2/MG2.12.32) 20/25 HP. CHASSIS 100 Chassis. SERIES Y-A. Nos. 4401-4500 Number of Chassis in Series .........100 Proposed Output ................. (12 per week after (Feb.25th. Authority to proceed…
| |
|
scan0182 |
Listing parts and material specifications considered safe to proceed with for the Peregrine project.
| |
|
View original record |
To BY. From Hs. c. to E. c. to Wor. c. to Roy. c. to Sft. X4584. X4027. PEREGRINE MATERIAL. The following is a list of the parts which we consider are safe to go ahead with :- (1) Crankcase. There is…
| |
|
scan0183 |
Continued list of vehicle components and notes, specifically regarding the gearbox.
| |
|
View original record |
-2- Hs.3/ML.5.12.32. Cont'd. (17) Petrol tank and fitting. (18) Petrol pump. (19) Gearbox. Silent second speed. We wish however to hold up the change speed lever and brake and the servo in the…
| |
|
scan0184 |
Holding up certain Peregrine parts due to failures and releasing others for production.
| |
|
View original record |
To BY. From Hs. c.c to E. c.c to Wor. c.c to Roy. c.c to Sft. + 55H. Hs.4/MJ.14.12.32. PEREGRINE MATERIAL. With reference to our list of Peregrine material sent through ref: Hs.3/MJ.5.12.32, we wish…
| |
|
scan0185 |
Continued list of numbered vehicle components including brake, steering, and chassis parts.
| |
|
View original record |
-2- Hs.4/MJ.14.12.32.Cont'd. (9) Rear Brake Equaliser Gear.Hand. (10) Rear Brake Intermediate Shaft. (11) Front Brake Equaliser. (12) Servo Counter Shaft. (13) Cross Steering Tube. (14) Front Apron.…
| |
|
scan0186 |
Ordering of further material for the 20/25 HP chassis.
| |
|
View original record |
Hs. from Wor. By. Y + S54. Wor3/GR.29.12.32. 20/25 H.P. CHASSIS MATERIAL. At present rate of output to test, it is about time we considered the ordering of further material for the above. We allow 22…
| |
|
scan0187 |
Outlining proposed improvements for the 20/25 chassis.
| |
|
View original record |
To Wor. From Hs. c. to BY. c. to E. 4554 Hs.2/MJ.2.1.33. 20/25 CHASSIS MATERIAL. On the next batch of 20/25 cars we should like to see the following improvements :- (1) Air silencer to carburetter.…
| |
|
scan0188 |
Continued discussion on proposed improvements regarding gearboxes, dampers, lubrication, and axle control for the 20/25 model.
| |
|
View original record |
-2- Hs.2/MJ.2.1.33. Cont'd. The gearboxes are being arranged to take the automatic control and if we get the correct shock absorbers fitted, the actual connecting up of the automatic control is not…
| |
|
scan0189 |
The expedited release of outstanding carburetter items for the 40/50 HP 'O' Series chassis.
| |
|
View original record |
To BY. from ROY. c.c to Hs. X45554 ROY10/MG3.1.33 40/50 HP. Chassis "O" Series - Chassis 51-150 Sales are asking for augmented output of such Chassis commencing as soon as possible, the result being…
| |
|
scan0190 |
Proposal to change the radiator shutter for the 25 HP model to a less expensive Peregrine type made from drawn tube.
| |
|
View original record |
X4-554. [handwritten] To Wor. From Hs. c. to BY. c. to E. Hs.4/MJ.3.1.33. 25 HP. MATERIAL. We see no reason why on the future 25 HP. model [struck through] material [handwritten] we should not use the…
| |
|
scan0191 |
Agreeing to use a drawn tube type radiator shutter on the 20/25 and Phantom II models.
| |
|
View original record |
RECEIVED 84554. To Hs. from E. E.1/HP.4.1.33. X S250. X 7250. c. Wor. By. re 20/25 HP. material. We are in agreement with your recommendation to use the drawn tube type of radiator shutter on the…
| |
|
scan0192 |
Material requirements for 200 sets of the 'Z' series 20/25 HP chassis, noting exceptions compared to the 'Y' series.
| |
|
View original record |
Y4554. ROY. c. Hs. c. E. Dept. c. F. Dept. c. G. Dept. c. D. Dept. c. Sft. c. BY/NW. 20/25 HP. CHASSIS - RE: MATERIAL FOR 'Z' SERIES. (200 SETS). ------------------------------------------ Will you…
| |
|
scan0193 |
List of parts, production instructions, and material specifications.
| |
|
View original record |
- 2 - BY.1/G.10.1.33. G.54697 2nd. Speed Driven Gear. G.54698 1st. Speed Driven Gear. G.54696 Constant Mesh Wheel - Rear. G.55079 Distance Piece. G.55080 Distance Piece. G.55081 Distance Piece.…
| |
|
scan0194 |
Note on the material specification for the first 100 chassis of the 20/25 HP 'Z' series.
| |
|
View original record |
ROY c. Hs. c. RY/HEB. 8.4554. BY.3/G.13.1.33. RECEIVED 4 XII 1933 20/25 HP. CHASSIS - 'Z' SERIES. Will you kindly note that the first 100 chassis in 'Z' series are to be in the present standard…
| |
|
scan0195 |
Releasing the programme for 200 'Z' Series 20/25 HP chassis, numbers 4501-4700.
| |
|
View original record |
To BY. CPT [Strikethrough] Ms [Strikethrough] EWT [Strikethrough] G. Hs Me. [Strikethrough] 84554. (ROY/absent) ROY/MG-18.1.33 [STAMP: PLANNING DEPT 19 JAN 1933] 20/25 HP. CHASSIS - "Z" SERIES 200…
| |
|
scan0196 |
Production schedule and material plan for the 20/25 HP Chassis 'Z' Series.
| |
|
View original record |
ROY16/MG16.1.33 20/25 HP. CHASSIS - "Z" SERIES Z-A. 4501-4600 Z-B. 4601-4700 Number of Chassis in Series ................ 200 Proposed Output ............................ 16 per week (including…
| |
|
scan0197 |
The ordering of material for 100 sets of 40/50 chassis.
| |
|
View original record |
Y4554 By. from Wor. Hs. Roy. Sft. Re: Material - 40/50 Chassis. In view of present commitments, we need additional material at once for a further batch of chassis. Please, therefore, go ahead ordering…
| |
|
scan0198 |
Instruction to hold machining of parts for the Phantom II gearbox to allow for fitting a new silent second gear.
| |
|
View original record |
RY/TWD. c. Sft. c. Hs. c. Roy. c. Roy/Ms. 84554 BY.10/G.19.1.33. [STAMP] RECEIVED 20 JAN 1933 P.11. GEARBOX. O.2. SERIES from 101 onwards. -------------------------------------------- From 101 onwards…
| |
|
scan0199 |
Materials for the 40/50 HP chassis and the release of a silent second gear.
| |
|
View original record |
X+ 554 Hs. BY.12/G.20.1.33. -------- 40/50 HP. CHASSIS. ----------------- I would like to remind you that we have got to settle up what the further 100 sets of material (P.2) will cover for the above…
| |
|
scan0200 |
Proposed modifications for a batch of 100 sets of P.2 Series material for the 40/50 HP chassis.
| |
|
View original record |
Hs. 84554. BY/Cgh.13/G.26.1.33. 40/50 HP. CHASSIS - P.2 SERIES MATERIAL. With reference to the further batch of 100 sets of material, which we have been given permission to order to comprise P.2…
| |
|
scan0201 |
Delays in ordering materials for the 'Z' and 'P.2.' series chassis, causing increased costs and worry.
| |
|
View original record |
To. Hs. By. Roy. [Handwritten top left]: Stock item held up. C. Rm [Handwritten top center]: XH554 Wor9/GR.31.1.33. 20/25 H.P. CHASSIS. 200 sets of material were authorised to be ordered on the 9th…
| |
|
scan0202 |
Authorising the release of materials for 200 sets and the construction of three more experimental 'Bensport' chassis.
| |
|
View original record |
Hs. By. Roy. Sft. "BENSPORT". Will By. please release, and will Roy. please order up 200 sets of material for "Bensport" as the chassis stands at present as regards design, excepting, of course, the…
| |
|
scan0203 |
Specification sheet for the Bensport chassis, detailing parts and modifications.
| |
|
View original record |
K4554 E. Dept. Hs. F. Dept. Roy. G. Dept. A MZO B. Dept. WH BY/SS6/N.4.2.33. BENSPORT SPECIFICATION. ------------- The Administration have given permission for 200 sets of material for the Bensport…
| |
|
scan0204 |
Continuation sheet for the Bensport specification, detailing various engine and chassis components.
| |
|
View original record |
Bensport Specification Continued. Valves & Fittings. - Standard 20/25 Valve Springs Ex.8979 Tappet Spring Hs.500 Push Rod E.56823 (.225 dia) check length. Inlet Pipes. - Hold up. Carburetter. - Hold…
| |
|
scan0205 |
Continued specification details for a bonnet, starting handle, and ignition distributor.
| |
|
View original record |
Specification Continued. Bonnet - Bensport design. Starting Handle. - As fitted to 1st. Experimental Car. Ignition Distributor. - Standard 20/25 with lightened contact levers.
| |
|
scan0206 |
Specification sheet for the Bensport model detailing various chassis components.
| |
|
View original record |
BENSPORT SPECIFICATION. Frames and Fittings. - Bensport Side Channels. Crossmembers as on LeG.3280. Wings outside Valance and - As on first Experimental Running Board. Chassis. Front Apron - No…
| |
|
scan0207 |
Specification document for Bensport, listing various vehicle components and their status or type.
| |
|
View original record |
BENSPORT SPECIFICATION. Flywheel & Clutch - Standard Gear Box & Actuating Gear - Standard Speedometer Drive - Standard 1st. & 3rd. Motion Shafts - Standard (Handwritten: Alt. ratio) Servo Drive -…
| |
|
scan0208 |
Requesting a decision on whether to use improved materials or old parts for the 20/25 HP chassis.
| |
|
View original record |
RECEIVED P.S. from Wor. Hs. By. Roy. FEB 7 1933 X4554. Worl/GR.6.2.33. 20/25 H.P. CHASSIS MATERIAL. Wor9/GR.31.1.33. I shall be pleased to have a reply to the P.S. in the above memo, so that I may…
| |
|
scan0209 |
Modifications and new drawings for 20/25 and 40/50 HP chassis material.
| |
|
View original record |
Wor. c. E. c. Hs. c. Roy X4554. BY.8/G.7.2.33. 20/25 and 40/50 HP. CHASSIS MATERIAL. With reference to Wor.9/GR.31.1.33. and Wor.1/GR.6.2.33. it was agreed on the 3rd inst. in conjunction with Hs.…
| |
|
scan0210 |
Modifying the dynamo drive, which halts production of crankcases for the 20 Peregrine chassis.
| |
|
View original record |
Sft. (crossed out) c. Hs. c. RHC. (crossed out) c. E. (crossed out) c. E. Dept. (crossed out) c. D. Dept. (crossed out) Y4554 BY.6/G.10.2.33. A decision has been arrived at that we shall reduce the…
| |
|
scan0211 |
Enclosing a programme for 100 40/50 HP 'P-2' Series chassis, numbers 6839-6938.
| |
|
View original record |
To BY. from ROY SPT Ws EWT G. Hs Ms. ----------------- XH554 ROY1/MG10.2.33 40/50 HP. CHASSIS - "P-2" SERIES 100 Chassis - 6839-6938 Enclosed please find copy of Programme covering the 100 Chassis…
| |
|
scan0212 |
Production schedule for 40/50 HP Chassis - P2 Series, covering chassis numbers 6839 to 6938.
| |
|
View original record |
ROY9/MG8.2.33 40/50 HP. CHASSIS - P2 SERIES Nos. 6839 to 6938 inclusive Number of Chassis in Series ........ 100 Proposed Output .................... 4 per week (including Holidays) Authority to…
| |
|
scan0213 |
Attaching a summary of new and cancelled car design parts issued to the Tool Drawing Office over an eight-year period.
| |
|
View original record |
Sgt. from Wor. Hs. from Wor. V4554 Wor7/T15.2.33. I attach hereto copy of a Summary of new and cancelled parts on car design issued to Tool Drawing Office covering a period of eight years, which I am…
| |
|
scan0214 |
Summary of new and cancelled parts on car design issued to the Tool Drawing Office covering a period of eight years.
| |
|
View original record |
COPY Summary of new and cancelled parts on car design issued to Tool Drawing Office covering a period of eight years. Year | 40/50 | Number of Parts | Average per Month | 20/25 | Number of Parts |…
| |
|
scan0215 |
Internal instruction to release an order for 200 sets of 20/25 HP chassis material.
| |
|
View original record |
By. Roy. Sft. AMM. c. to Hs. X4854 16 MAY 1933 RECEIVED Worl/GR.10.5.33. 20/25 H.P. CHASSIS MATERIAL. Will By. please release, and will Roy. please order without delay, 200 further sets of material…
| |
|
scan0216 |
Clarifying material orders and machining instructions for the Peregrine and Bensport projects.
| |
|
View original record |
X HS.S HY.1/G.30.3.33. Sft. Roy. c. Hs. c. Wor. RE: MATERIAL ORDERED FOR PEREGRINE AND BENSPORT. ------------------------------------------ In order to prevent misunderstanding, I wish to confirm the…
| |
|
scan0217 |
Machining schedules for the 3.5-litre Bentley Car, authorising work on 100 sets of material.
| |
|
View original record |
Hs YVP To Wor. from Sg. re 3½-litre Bentley Car. Sg9/E26.4.33 Copy to Hs. F. E.H. Referring to the 200 sets of material which were authorised at the end of January, I under- stand that no machining…
| |
|
scan0218 |
The procurement and testing of road wheels and hubs for the 3½ Litre Bentley.
| |
|
View original record |
X458H G. Dept. Hs. E. D. Dept. C. Wor. BY.7/G.3.5.33. 3½ LITRE BENTLEY. In my memo outlining precisely what we were able to do and instruct up the machining of material for the 100 sets, we omitted to…
| |
|
scan0219 |
Progress chart and conference summary regarding the production plan for the 3 1/2 Litre Bentley chassis.
| |
|
View original record |
Wop. c. Hs. c. E. X4554 BY.1/G.2.5.33. 3 1/2 LITRE BENTLEY PROGRESS CHART. ----------------- A Conference was held in Hs's. Office with E., Hs., and By. present, in order to settle exactly what could…
| |
|
scan0220 |
List of parts and materials held up for the balance of 85 sets.
| |
|
View original record |
- 2 - BY.1/G.2.5.33. Exhaust Fittings. Exhaust Cutout. Undersheets. Luvax Oil Pipes. Spares. Side Spare Wheel Carrier. Inlet Pipes. Carburetter. Petrol Pump. Water Connections. Instrument Board. Wire…
| |
|
scan0221 |
Urging the provision of outstanding instructions for Bentley Material due to time constraints.
| |
|
View original record |
E. BY. Hs. SFT. from Wor. R455P Wor4/T13.6.33. According to the report I received yesterday from Roy., there is still 4% of the Bentley Material not yet% instructed. This means that the Works are…
| |
|
scan0222 |
The 4% material for road wheels and hubs and the issuance of drawings.
| |
|
View original record |
x + 554 Wor. c. Hs. c. Sft. c. F. ------------ BY/Cgh.2/G.15.6.33. With reference to Wor.4/T.13.6.33. the 4% of material referred to represents the parts comprising road wheels and hubs. All detail…
| |
|
scan0223 |
The release and order of 200 further sets of material for the 20/25 HP chassis.
| |
|
View original record |
By. from Wor. C. Hs. 14554. Wor5/M.16.6.33 Re: 20/25 HP. Chassis Material. -------------------------- Will By. please release and will Roy. please order without delay 200 further sets of material for…
| |
|
scan0224 |
Potential economies and improvements for the 25 HP model by adopting Bentley-style components.
| |
|
View original record |
H554 To Wor. From Hs. c. to E. c. to By. Hs.1/MJ.19.6.33. 25 HP. MATERIAL. On the 200 sets of 25 HP. material which have just been ordered we think we might take advantage of one or to economies :-…
| |
|
scan0225 |
Proposed modifications and improvements for the 20/25 HP Chassis, B.2 Series material.
| |
|
View original record |
Wor. c. Hs. c. Sft. c. Roy. c. AEM. X4.8.6. BY/Cgh.7/G.19.6.33. 20/25 HP. CHASSIS - B.2. SERIES MATERIAL. With reference to Wor.5/M.16.6.33. we have discussed the matter with Hs. and it is suggested…
| |
|
scan0226 |
Agreeing to the introduction of new items for the 20/25 Material series, conditional upon the signing of Standardisation Sheets.
| |
|
View original record |
Hs. BY. from Wor. X45854 Wor6/T20.6.33. Hsl/MJ19.6.33 and BY/Cgh7/G19.6.33. I quite agree that in the next Series of 20/25 Material we should introduce the four or five new items, but I do this on the…
| |
|
scan0227 |
Authorizing the order of 100 material sets for the 40/50 HP Chassis and requesting allocation details.
| |
|
View original record |
By. from Wor. Hs. Roy. Sft. Xf554 Wor2/M24.6.33 Re: Material - 40/50 HP. Chassis. Would you please go ahead ordering up a further 100 sets, except material affected by any proposed modifications in…
| |
|
scan0228 |
Cover memo for a programme covering 200 chassis, numbers 4901 to 5100, of the 20/25 HP 'B2' series.
| |
|
View original record |
[Handwritten: X4854] To [Strikethrough: FY.] from ROY. [Strikethrough: RPT] [Strikethrough: EHT] [Strikethrough: G] [Strikethrough: Hs] **************** ROY16/MG26.6.33 **************** 20/25 HP.…
| |
|
scan0229 |
Production schedule for the 20/25 HP Chassis 'B2' Series, detailing output, testing, and material ordering timelines.
| |
|
View original record |
ROY14/MG26.6.33 20/25 HP. CHASSIS - "B2" SERIES B2-A 4901-5000 B2-B 5001-5100 Number of Chassis in Series ............. 200 Proposed Output ........................ 15 per week (including holidays)…
| |
|
scan0230 |
Potential new features for an upcoming order of 100 40/50 HP chassis.
| |
|
View original record |
Hs. [Handwritten]: X54 BY.7/G.28.6.33. 40/50 HP. CHASSIS MATERIAL. -------------------- We have had instructions from Sales to order up a further 100 sets of 40/50 HP. chassis material. The Order…
| |
|
scan0231 |
Page 2 of a typed memorandum regarding a settlement and a postscript about a modified petrol tank filler cap.
| |
|
View original record |
- 2 - one's mind in talking the matter over with Mr. Clough, there may be other items which you are particularly interested in, but we think the matter urgently requires settlement. BY. P.S. There is…
| |
|
scan0232 |
Responding to eight points regarding vehicle component experiences and proposed standardizations.
| |
|
View original record |
To By. from Hs/Rm. Hs/Rm.1/KT.30.6.33. With reference to your BY.7/G.28.6.33. We agree with - (1) Yes. (2) Yes. (3) Crankcase strengthened on main bearing web. (4) No, we have not sufficient…
| |
|
scan0233 |
Release schedule and production quantities for the Bentley Chassis, noting potential supply issues due to upcoming holidays.
| |
|
View original record |
K4554 To BY. from ROY. c. to Nor. c. to E. c. to Hs. ----------------- ROY3/MG3.7.33 ----------------- Chart attached shows the present position of Releases for the Bentley Chassis. You will see from…
| |
|
scan0234 |
Parts status report for the 'Bensport' 'A' Series, detailing held-up components for production.
| |
|
View original record |
Copy. ROY. ROY/AES.7/TW. 30.6.33. Re 'Bensport' 'A' Series. o/1500. Section. Description. "A" "B" Held up. Held up. 1 - 15. 16 - 200. 5000. Crankcase & Bearings. - 2 parts. 5050. Cylinder. - 21 parts.…
| |
|
scan0235 |
Release of parts for the 20/25 HP Chassis 'B.2' series.
| |
|
View original record |
X 4584 To BY. (struck through) from ROY. c. to Wor. (struck through) c. to Hs. ROY4/MG3.7.33 200 - 20/25 HP. CHASSIS - "B.2" SERIES You will recollect it was arranged these Chassis should be released…
| |
|
scan0236 |
List of material exceptions for the 'R.2.' series 40/50 HP chassis compared to the P.2. series.
| |
|
View original record |
BY/Cgh.2/G.3.7.33. 40/50 HP. CHASSIS - 'R.2.' SERIES MATERIAL. With reference to Wor.2/M.24.6.33. we are releasing instructions for material for all the units to be exactly similar to P.2. series with…
| |
|
scan0237 |
Release of a programme for 100 chassis, numbers 6839 to 6938, of the 40/50 HP 'R.2' Series.
| |
|
View original record |
To BY. from ROY. XU5156 ROY5/MG4.7.33 40/50 HP. Chassis - "R.2" Series Attached please find copy of Programme covering the 100 Chassis Nos. 6839 to 6938 inclusive, released on June 24th. ROY.…
| |
|
scan0238 |
Production schedule for the 40/50 HP 'R.2' Series Chassis, numbers 6839-6938.
| |
|
View original record |
ROY3/MG4.7.33 40/50 HP. CHASSIS - "R.2" SERIES 6839-6938 Number of Chassis in Series .................... 100 Proposed Output ............................... 4 per week (including holidays) Authority…
| |
|
scan0239 |
Ordering brake material for the Bentley chassis and earmarking existing stock for the Peregrine.
| |
|
View original record |
BY/TWD. [struck through] c. Hs. c. ROY. [struck through] Kestrel [handwritten] BY/.7/G.11.7.33. BENTLEY CHASSIS - BRAKE MATERIAL. Will you kindly note that we should order up the A.M.R.2. material for…
| |
|
scan0240 |
Part cancellations and outstanding decisions for the 3.5 Litre Bentley 'A' Series.
| |
|
View original record |
ROY. C. Wort C. E. c. Hs. BY/Cgh.9/G.11.7.33. 3.5 LITRE BENTLEY - 'A' SERIES MATERIAL. With reference to ROY.3/MG.3.7.33. and list attached thereto, we have not got any items held up for the first 15…
| |
|
scan0241 |
Outstanding material and decisions for the 3 1/2 Litre Bentley 'A' Series.
| |
|
View original record |
By. For. E. Hs. ROY/HSG/P.12.7.33. 3 1/2 LITRE BENTLEY - 'A' SERIES MATERIAL. We are in receipt of By/Cgh9/G.11.7.33., and note that the three parts held up under heading 'Wing Stays - Sec. 7001' are…
| |
|
scan0242 |
Limiting an order for Bentley Chassis brake material to 100 sets for the 'A' series, pending further review.
| |
|
View original record |
X 4554 BY/TWD c. Hs. c. Roy BY.4/N.12.7.33. BENTLEY CHASSIS - BRAKE MATERIAL. Further to our memo BY.7/G.11.7.33 ordering A.M.R.2. brake linings for the whole of 'A' series, will you please release…
| |
|
scan0243 |
List of parts not yet released by the Drawing Office for the Bensport Chassis 16-200, with handwritten annotations.
| |
|
View original record |
Brake for Dynamo Drive Delete X4584 BENSPORT CHASSIS 16 - 200. PARTS NOT YET RELEASED BY THE D.O. 'E' Dept. Sec.5000 Crankcase & Bearings. E.B.316 Housing. E.B.1024 Cover. E.B.184 Bush. Sec.5010…
| |
|
scan0244 |
Parts list organized by section, detailing part numbers and including handwritten annotations on their status.
| |
|
View original record |
-2- Sec.5230 Exhaust Fittings. E.79322 Bolt. E.B.570 Tube. E.B.638 Lagging. E.B.643 Strap. E.B.644 Lagging. E.B.645 Lagging. E.B.787 Lagging. E.B.795 Brackets. E.B.835 Pipes. E.B.560 Sling. E.B.797…
| |
|
scan0245 |
Request to review production drawings for the centre point radiator mounting.
| |
|
View original record |
X4554 Les. from Rm. Hs/Rm. 7/KT. 29.9.33. CENTRE POINT RADIATOR MOUNTING. Will you please go over the production drawings of the centre point radiator mounting and satisfy yourself that these are O.K.…
| |
|
scan0246 |
Requesting a final report on outstanding features, the gear lever and clutch centre, for 200 Bentley cars.
| |
|
View original record |
Gry. from Rm. Hs/Rm.8/KT.29.9.33. We have promised to clear up the Bentley instructions for the 200 cars within a fortnights time. The outstanding features in which you are interested are - (1) Gear…
| |
|
scan0247 |
Outlining a fortnight deadline to finalise instructions for the exhaust system and fan for 200 Bentleys.
| |
|
View original record |
X4554 Lid. from Rm. Hs/Rm.5/KT.29.9.33. MATERIAL FOR 200 BENTLEYS. The D.O. have given us a fortnight in which to clear up the final instructions for :- (1) Exhaust system, (2) Fan, for the Bentley.…
| |
|
scan0248 |
The production continuity and sanction for 20/25 HP Chassis, Series C.2.
| |
|
View original record |
K.554 To BX. from ROY. c. to Hs. ----------- 20/25 HP. Chassis - Series C.2 ----------- Wor has now given authority to proceed with manufacture of a further 200 such Chassis (Vide Wor3/M30.10.33) and…
| |
|
scan0249 |
Production recommendations and modifications for the 3.5 litre Bentley Chassis.
| |
|
View original record |
To WCR. from E. c. Hs. By. Sft. Rm. 3½ litre Bentley Chassis. With further reference to E.5/HP.28.9.33 and Wor.6/T.4.10.33, a meeting of Ms. By. Sft. Rm. and E. was held to discuss the position of…
| |
|
scan0250 |
List of production recommendations for various vehicle components.
| |
|
View original record |
- 2 - approximately 100 pumps of the original type to be used up with plugs. (9) Sec.5181. Petrol Pump. It is agreed that the S.U. Co. will supply 200 sets of complete pumps, we on our part supplying…
| |
|
scan0251 |
List of recommendations for production changes and additions for various vehicle components.
| |
|
View original record |
- 3 - E.S/MP.1.11.33. (22) Fan. We now recommend that we go ahead with the new type of fan for 200 sets as fitted to the 10,000 mile car. (25) Propeller Shaft Universal Joints. We wish to cancel the…
| |
|
scan0252 |
Recommendation to incorporate a bronze bush in the distributor tower bearing to overcome slackness.
| |
|
View original record |
(31) Distributor Tower. We recommend incorporation on production immediately of the bronze bush in the distributor tower bearing to overcome the slackness which has previously developed at this point…
| |
|
scan0253 |
Instructions to order 200 sets of material for the 20/25 HP chassis C.2. series.
| |
|
View original record |
Hs. BY/Cgh.2/G.1.11.33. 20/25 HP. CHASSIS - C.2. SERIES MATERIAL. We have received instructions to order 200 sets of material for the 20/25 HP. chassis to comprise C.2. series. In order to avoid any…
| |
|
scan0254 |
Production quantities and part standardization for the 3½ Litre Bentley Chassis.
| |
|
View original record |
from Wor. Copy to Hs. B[redacted] X4554 Wor4/T2.11.33. X4553 Re 3½ Litre Bentley Chassis. With reference to E8/HPl.11.33, I am very pleased that you have had this conference, and of course, I fall in…
| |
|
scan0255 |
Recommending several material and component improvements for the 25 HP model.
| |
|
View original record |
4554 To Wor. From Hs. c. to Sg. c. to R. c. to By. c. to De. c. to Hdy. c. to FH. Re. 25 HP. MATERIAL. With reference to the 200 sets of material which have just been ordered for the 25 HP., we…
| |
|
scan0256 |
The urgent release and standardisation of a fan for the 25 HP material.
| |
|
View original record |
Hs. from Wor. Wor5/R.9.11.33. Re: 25 H.P. Material. Hs.2/MJ.3.11.33. In addition to the items mentioned in your memo, By. is pressing me to release:- Present standard fan with trailing edge of plates…
| |
|
scan0257 |
Status of standardisation sheets for 25 HP material.
| |
|
View original record |
X4174 To Wor. From Hs/Lid. C. to Sft. C. to AEM. Hs/Lid.3/KT.20.11.33. C. to C/Rb. Re. 25 HP. MATERIAL. Wor5/R.9.11.33. Wor5/R.16.11.33. The present position of standardisation sheets for 25 HP.…
| |
|
scan0258 |
Requesting feedback on modifications before ordering an additional 100 sets of material for the 40/50 HP chassis.
| |
|
View original record |
[Handwritten] X4584 Hs. BY/Cgh.6/G.1.12.33. 40/50 HP. CHASSIS MATERIAL. We have received instructions to order another 100 sets of material to follow on after R.2. series (100 chassis), therefore will…
| |
|
scan0259 |
Chassis material for the 20/25 HP C.2. Series, discussing hydraulic dampers.
| |
|
View original record |
Wor. c. Hs. c. E. Perry BY.1/G. 4.12.33. 20/25 HP. CHASSIS MATERIAL FOR C.2. SERIES. ----------------------- In considering the material for the above series we included in our memo discussing…
| |
|
scan0260 |
Programme covering the 20/25 HP. Chassis - C2 Series.
| |
|
View original record |
To BY. from ROY. SFT Ws EWT G Hs Ms. [Handwritten note]: reverse, ROY1/MG6.12.33 20/25 HP. CHASSIS - C2 SERIES 5101 - 5300 Attached please find copy of Programme covering C.2 Series.. ROY [Signature]…
| |
|
scan0261 |
Production schedule and key milestone dates for the 20/25 HP Chassis - C2 Series.
| |
|
View original record |
ROY3/MGLO.11.33 20/25 HP. CHASSIS - C2 SERIES C2-A. 5101-5200 C2-B. 5201-5300 Number of Chassis in Series ............. 200 Proposed Output ......................... 15 per week. Authority to proceed…
| |
|
scan0262 |
Requesting a list of items to be held up from a material order for the 3 1/2 Litre Bentley Chassis.
| |
|
View original record |
E. Hs. XC1554 BY/Cgh. 28/G. 8.12.33. 3 1/2 LITRE BENTLEY CHASSIS. We have received instructions to order a further 200 sets of material for Bentley production, but we are not to order material which…
| |
|
scan0263 |
Programme for 100 40/50 HP S.2 Series chassis, numbers 6939-7038.
| |
|
View original record |
To DY. from ROY OPT HS F Hs **************** Test ROY1/WG9.12.33 **************** 40/50 HP. CHASSIS - S2 SERIES 6939 - 7038 -------------- Attached please find copy of Programme covering the 100 -…
| |
|
scan0264 |
Production schedule and material requirements for the 40/50 HP. CHASSIS - S2 SERIES.
| |
|
View original record |
ROY4/MG5.12.33 40/50 HP. CHASSIS - S2 SERIES 6939-7038 Number of Chassis in Series ............. 100 Proposed Output ........................ 4 per week (including holidays) Authority to proceed given…
| |
|
scan0265 |
Covering memo for a programme authorising 200 20/25 HP D2 series chassis.
| |
|
View original record |
To BY. from ROY SFT WS EWT G Hs MS (Handwritten: reverse) ROY2/MG19.12.33 20/25 HP. CHASSIS - D2 SERIES . D2-A .. 5301-5400 . D2-B .. 5401-5500 Attached please find copy of Programme covering the 200…
| |
|
scan0266 |
Production schedule and material plan for the 20/25 HP Chassis - D2 Series.
| |
|
View original record |
ROY17/MG15.12.33 20/25 HP. CHASSIS - D2 SERIES D2-A. 5301-5400 D2-B. 5401-5500 Number of Chassis in Series .................. 200 Proposed Output ............................ 15 per week (including…
| |
|
scan0267 |
The programme covering 200 Bentley B-Series chassis.
| |
|
View original record |
To BY from ROY. SFT Ws BWT G Hs Ms (The initials SFT, Ws, BWT, G, Hs, Ms are all struck through) ROY1/MG19.12.33 BENTLEY CHASSIS - B SERIES B-A .. 201-300 B-B .. 301-400 Attached please find copy of…
| |
|
scan0268 |
Production schedule for the Bentley 'B' Series chassis, detailing output, testing, and material timelines.
| |
|
View original record |
ROY16/MG13.12.33 BENTLEY CHASSIS "B" SERIES B-A. 201-300 B-B. 301-400 Number of Chassis in Series .................... 200 Proposed Output ............................... 8 per week. (including…
| |
|
scan0269 |
Ordering materials and improvements for the 20/25 HP model.
| |
|
View original record |
Hs. from Wor. E. By. Roy. X 4584 Worl/R.21.2.34. re: 20/25 H.P. Output. Roy. is pressing to order further material. Sales agree to our ordering a further 200 sets provided matters are so arranged that…
| |
|
scan0270 |
Instruction regarding improvements for the 20/25 HP Chassis 'E2' Series.
| |
|
View original record |
Hs. from Wor. E. By. Rey. Sft. A.M.M. XGTTT X4554 Wor3/M.13.3.34. Re: 20/25 HP. Chassis - "E2" Series. Will you kindly note and make all the necessary arrangements so that "E2" Series will come…
| |
|
scan0271 |
Instruction to order 50 sets of material for the 40/50 HP T2 Series chassis.
| |
|
View original record |
By. from Wor. Roy. c. to E. c. to Hs. c. to Sft. c. to AEM. X4554 Wor2/R.7.4.34. 40/50 H.P. CHASSIS MATERIAL (T2. Series) Will By. please release, and will Roy. please order 50 sets of material for…
| |
|
scan0272 |
Internal memorandum discussing the inclusion of new features for the 40/50 HP 'T.2' series chassis.
| |
|
View original record |
X4554 To Wer. from E/Lid. c. Hs. 40/50 HP. Chassis Output. Referring to Sg.6/C.29.3.34, it is agreed for the reasons stated that it is inadvisable to incorporate many new features on 'T.2' series.…
| |
|
scan0273 |
List of reviewed modifications and recommendations for engine and chassis components.
| |
|
View original record |
- 2 - E/Lid.1/HP.10.4.34. (6)- More silent fan - requires more testing. (7)- Hydraulic tappet gear - not in a sufficiently advanced state for production. (8)- Eccentrically mounted dynamo pinion -…
| |
|
scan0274 |
List of proposed vehicle improvements concerning braking, gears, and bearings, with a recommendation for testing and implementation.
| |
|
View original record |
- 3 - E/Lid.1/Hr.10.4.34. (9)- Fully floating servo - improved braking. (10)-Easy brake adjustment. (12)-Spherical bearings in brake equaliser shafts - improved braking and cheaper production.…
| |
|
scan0275 |
Ordering materials and modifications for the 'F.2' Series 20/25 HP cars.
| |
|
View original record |
X4554 To WOR. from E/Lid. E/Lid.5/HP.12.4.34. c. Hs. re Material for 'F.2' Series 20/25 HP. Cars. With reference to Sg.3/E.11.4.34 and Wor.13/T.12.4.34, we have looked into the question of what…
| |
|
scan0276 |
Parts hold-up for a new carburetter and controllable shock dampers for the 20/25 HP Chassis.
| |
|
View original record |
Hs. from Wor. E. By. Roy. c. Sft. c. AEM. X4554 Wor8/R.13.4.34. 20/25 H.P. CHASSIS - E.2. SERIES. Sg12/Ell.4.34. Quite a number of parts are held up in connection with new type carburetter and…
| |
|
scan0277 |
Arranging a visit from 'Cx' to discuss the output of the 40/50 HP and 20/25 HP models.
| |
|
View original record |
Hs. from Wor. E. Wor2/R.17.4.34. 40/50 H.P. & 20/25 H.P. - OUTPUT. Will you please note that I have arranged for Cx. to come to-morrow, Wednesday, relative to the above, and I will inform you later…
| |
|
scan0278 |
40/50 HP chassis output, material orders for 'Spectre', and proposed Phantom II modifications for improved silence and smoothness.
| |
|
View original record |
[Handwritten: X4554] COPY. S/W.....Wor. c. to C. Cx. Sg2/C13.4.34. 40/50 H.P. CHASSIS OUTPUT. I am in receipt of your Wor5/R10.4.34. and have discussed this with C. and Cx. In view of 'Spectre'…
| |
|
scan0279 |
Material increases and technical improvements for the 40/50 HP T2 Series vehicle.
| |
|
View original record |
X4537 Sg. C. to Mr. C. C. " E. Hs. C. " BY CXS/KW19.4.34. Material - 40/50 h.p. T2 Series. I went to W. yesterday and discussed with W or an other officials the question raised in your Sg2/C18.4.34,…
| |
|
scan0280 |
Modifications to the crossmember and floor for the Olympia Show cars.
| |
|
View original record |
- 2 - CxG/AW19.4.34. It seems clear from all the correspondence that for our Olympia Show cars, i.e. the latter half of 38, we are to have the sheet metal crossmember moved back - for wells in the…
| |
|
scan0281 |
Proposed modifications for the 20/25 HP FE series engine and chassis.
| |
|
View original record |
Sg. c. to Mr. C. c. Mr E Hs. c. Mr Hy. Handwritten notes: Hs. Rm x4554 Material- 20/25 h.p. FE Series. When at W. yesterday I went fully into the question of future mods on 20/25's as affecting the…
| |
|
scan0282 |
Page discussing various chassis features, their production implications, and improvements.
| |
|
View original record |
- 2 - CHASSIS (contd) (12) Brakes - easy adjustment with protected working parts. (17) Brake linings fixed with bifurcated rivets to facilitate production. (18) Pressed steel change speed gear gate -…
| |
|
scan0283 |
Internal memorandum to release and order 100 sets of 40/50 HP Chassis Material for the T.2. Series.
| |
|
View original record |
By. Roy. c. to Hs. c. to Sft. c. to AHi. X4554 Worl/R.20.4.34. 40/50 H.P. CHASSIS MATERIAL T.2. SERIES. Further to Wor2/R7.4.34., will By. please release, and will Roy. please order 100 sets (instead…
| |
|
scan0284 |
Authorizing the order of 200 sets of material for the 'F.2' series 20/25 HP chassis.
| |
|
View original record |
X4554 By. Roy. c. to E. c. to Hs. c. to Sft. c. to AHM. Wor2/R.20.4.34. 20/25 H.P. CHASSIS/MATERIAL 'F.2' SERIES. Will By. please release, and will Roy. please order, 200 sets of material for 'F.2'…
| |
|
scan0285 |
The order of a further 200 sets of material for the 3½-Litre Bentley.
| |
|
View original record |
By: Roy. c. to E. c. to Hs. c. to Sft. c. to AEM. c. to D/BP. X4554 Wor3/R.27.4.34. 3½-LITRE BENTLEY. Will By. please release, and will Roy. please order a further batch of 200 sets of material,…
| |
|
scan0286 |
Enclosing a copy of the programme covering the 40/50 HP YZ Series Chassis.
| |
|
View original record |
To HY. WH. Bal Poyps C. Ha. Hs. from ROY [Handwritten initial: Rm] [Handwritten number: X4534] [Crossed out: ROY10/RG2.5.34] 40/50 HP. CHASSIS - YZ SERIES 7039-7138 Attached please find copy of…
| |
|
scan0287 |
Production schedule for the 40/50 HP Chassis T2 Series, outlining quantities, output, and key milestone dates.
| |
|
View original record |
ROY4/MG2.5.34 40/50 HP. CHASSIS - T2.SERIES 7039-7138 Number of Chassis in Series ......... 100 Proposed Output .................... 4 per week (including holidays) Authority to proceed given…
| |
|
scan0288 |
Holding up orders for Bentley 'C' Series clutch material due to upcoming modifications.
| |
|
View original record |
X4554 To BY. from E/Lid: E/Lid.2/HP.3.5.34. c.Hs.Roy.Sft. re Bentley 'C' Series Material. With reference to Minute 2 of E/Lid.1/HP.3.5.34 holding up of clutch material. Will you please let us know as…
| |
|
scan0289 |
Programme for the Bentley C. Series and 200 - 20/25 HP. Chassis.
| |
|
View original record |
To SY. from HOY CPT (crossed out) E.P. (crossed out) WMT (crossed out) C. (crossed out) HS (crossed out) HP (crossed out) ******************** X6554 HOY7/MGS.5.34 ******************** BENTLEY CHASSIS…
| |
|
scan0290 |
Production schedule for the Bentley C-Series chassis, outlining quantities, output rates, and key deadlines.
| |
|
View original record |
ROY6/MG5.5.34 BENTLEY CHASSIS - C.SERIES C-A. 401-500 C-B. 501-600 Number of Chassis in Series ............. 200 Proposed Output ........................ 9½ per week (including holidays) Authority to…
| |
|
scan0291 |
The programme for the 20/25 HP Y2 Series chassis.
| |
|
View original record |
To HY. from ROY X4554 [Text struck through: HY., CD, WB, WHS, Hs, Hs] ***************************** ROY4/MG5.5.34 ***************************** 20/25 HP. CHASSIS - Y2 SERIES Y2-A .. 5701-5800 Y2-B ..…
| |
|
scan0292 |
Production schedule for the 20/25 HP Chassis F2 Series, detailing output, material orders, and key dates.
| |
|
View original record |
ROY3/MG5.5.34 20/25 HP. CHASSIS - F2 SERIES F2-A. 5701-5800 F2-B. 5801-5900 Number of Chassis in Series ............. 200 Proposed Output ........................ 18 per week (including holidays)…
| |
|
scan0293 |
Clutch material, production cards, and tools for the Bentley 'C' Series.
| |
|
View original record |
x4554 Mr from Sft. Mr Bye c. Hs. Sir Royce Sft1/BH.10.5.34. Re BENTLEY 'C' SERIES MATERIAL. With reference to memo' R/Lid.2/HP.3.5.34, in regard to the Clutch material for this Series, we have now had…
| |
|
scan0294 |
The holding up of clutch material for the Bentley 'C' Series, urging the release of parts and modifications to overcome clutch juddering.
| |
|
View original record |
X4554 To Hs. from E/Lid. c. Wor. By. Roy Sft. E/Lid.3/HP.14.5.34. Bentley 'C' Series Material. With reference to Minute 2 of E/Lid.1/HP.3.5.34,holding up of clutch material, will you please note that…
| |
|
scan0295 |
Requesting the immediate issue of instructions for a new carburetter and hydraulic shock dampers for the 20/25 HP Chassis E.2. Series.
| |
|
View original record |
x4554 By. from Sft. c. Hs. Sft7/BH.29.5.34. 20/25 HP. CHASSIS - E.2. SERIES. Further to our memo' Sft1/MW.16.5.34, we shall be glad if you can now issue instructions for the new type Carburetter and…
| |
|
scan0296 |
Instructions for cylinder block castings and hydraulic shock dampers for the 20/25 HP Chassis E.2. series.
| |
|
View original record |
X4552 c. Wor. c. Hs. c. Sft. c. Roy. BY/Cgh8/N.30.5.34. Re: 20/25 HP. Chassis - E.2. series. Referring to Sft.7/BH.29.5.34. in which it is pointed out that the Works have arrived at the point when…
| |
|
scan0297 |
List of standardisation features and material orders for the 'D' Series 3 1/2 Litre Bentley.
| |
|
View original record |
Hs. 14554 BY/Cgh.5/G.10.7.34. (15) Cross member at rear of engine for rubber engine mounting - le Css45/3883 3 1/2 LITRE BENTLEY - 'D' SERIES MATERIAL. As instructed in Wor.2/R.6.7.34. we are ordering…
| |
|
scan0298 |
Material ordering for the 20/25 HP G.2. Series chassis, with a list of items delayed due to standardisation.
| |
|
View original record |
Hs. V455F BY/Cgh.10/G.10.7.34. 20/25 HP. CHASSIS - G.2. SERIES MATERIAL. -------------------------------------- As instructed in Wor.1/R.6.7.34. we are ordering 200 sets of material for the above…
| |
|
scan0299 |
Listing new or altered parts for the 20/25 G.2 Series car.
| |
|
View original record |
X4554 To By. Hs/Rm.11/KW.17.7.34. 20/25 G.2 Series Material. Referring to By/Cgh.10/E.10.7.34., the parts fitted to the car which have been omitted are :- (1) Propellor shaft damper. (2) Altered fan.…
| |
|
scan0300 |
List of omitted parts for a 3½ Litre Bentley 'D' series car.
| |
|
View original record |
+4554 To By: Hs/Rm.20/KW.16.7.34. 3½ Litre Bentley 'D' series Material. Referring to the list of parts given in your By/Cgh.5/G.10.7.34, the parts running on the car which are omitted we think are :-…
| |
|
scan0301 |
List of omitted parts for the 20/25 G.2 Series car.
| |
|
View original record |
X 6532 To By. Hs/Rm.11/KW.17.7.34. 20/25 G.2 Series Material. Referring to By/Cgh.10/E.10.7.34., the parts fitted to the car which have been omitted are :- (1) Propellor shaft damper. (2) Altered fan.…
| |
|
scan0302 |
Cover note for a programme authorizing 200 Bentley D. Series chassis.
| |
|
View original record |
x4554 To DI. from ROY DFT EHT C Hs ROY16/MG20.7.34 BENTLEY CHASSIS - D. SERIES Attached please find copy of Programme covering the 200 - Bentley Chassis authorised by ROY2/R6.7.34 ROY ENCLOSURE. Copy…
| |
|
scan0303 |
Production and materials schedule for Bentley D-Series chassis.
| |
|
View original record |
ROYS/MG13.7.34 BENTLEY CHASSIS. D.SERIES. D-A. 601-700 D-B. 701-800 Number of Chassis in Series ............ 200 Proposed Output .................... 13½ per week including holidays. Authority to…
| |
|
scan0304 |
Enclosing the programme for the 20/25 HP. Chassis G2.SERIES.
| |
|
View original record |
Y454 To DY. from ROY EWE [struck through] HJH [struck through] Hs [struck through] lls [struck through] ---------------- ROY17/MG20.7.34 ---------------- 20/25 HP. CHASSIS - G2.SERIES Attached please…
| |
|
scan0305 |
Production schedule for the 20/25 HP Chassis G2 series, detailing quantities, output rates, and material timelines.
| |
|
View original record |
ROYLO/MG13.7.34 20/25 HP. CHASSIS - G2 SERIES G2-A. 5901-6000 G2-B. 6001-6100 Number of Chassis in Series ........ 200 Proposed Output .................... 18 per week (including holidays) Authority…
| |
|
scan0306 |
The procurement of additional materials for the D and E Series 3½-Litre Bentley.
| |
|
View original record |
Sft. from Wor. By. Roy. Hs. AHi. x4584 Wor2/R.6.7.34. 3½-LITRE BENTLEY - ADDITIONAL MATERIAL. D. SERIES. Will By. please release, and will Roy. please order a further batch of 200 sets of material for…
| |
|
scan0307 |
The ordering of additional materials for the 20/25 HP Chassis, G.2 and H.S. Series.
| |
|
View original record |
Sft. from Wor. Sy. Roy. Hs. AWH. L6554 Wor1/R.8.7.34. 20/25 H.P. CHASSIS - ADDITIONAL MATERIAL. G.2. Series. Will By. please release, and will Roy. please order a further batch of 200 sets of material…
| |
|
scan0308 |
Proposed modifications for the 40/50 HP T.2 Series Chassis.
| |
|
View original record |
War. c. Hs. c. Sft. c. Roy. x4554 BY.4/G. 23.7.34. 40/50 HP. CHASSIS - T.2. SERIES. With reference to Sg's request that we should hold up the present standard material for the second half of the above…
| |
|
scan0309 |
Introduction of rubber engine mountings for the 20/25 HP chassis.
| |
|
View original record |
X6537 War. c. Hs. c. Sft. c. Roy. ----------------- 20/25 HP. CHASSIS - RUBBER MOUNTING FOR ENGINE. --------------------------------------------- With reference to Sg's request that we should hold up…
| |
|
scan0310 |
Agreement to order parts and consider standardisation for the 40/50 HP Chassis 'T2' Series.
| |
|
View original record |
By. from Wor. Hs. Roy. Sft. Rm x 455k Wor7/R.24.7.34. 40/50 H.P. CHASSIS "T2" SERIES. It has been agreed that we order 50 sets of material at once for the following first three items, so that they may…
| |
|
scan0311 |
Modifications for the Phantom II T.2 Series chassis.
| |
|
View original record |
Hs. BY/Cgh.7/G. 24.7.34. PHANTOM 11. CHASSIS - T.2. SERIES. With reference to the discussion which we had in your Office yesterday in regard to the recommendations to be made to the Administration…
| |
|
scan0312 |
Modifications for the 40/50 HP Chassis T.2 series gearbox, separating immediate changes from those pending experimental testing.
| |
|
View original record |
Hs. C. Hdy. x4554 BY/Cgh.6/G.11.9.34. 40/50 HP. CHASSIS - T.2. SERIES MATERIAL. ------------------------------------- As agreed at a Conference held in E's Office last week, we are instructing the…
| |
|
scan0313 |
Programme for the 20/25 HP Chassis, HR Series.
| |
|
View original record |
x4554 To DY. from ROY. WB MS G Hs Mc ROY9/MG07.11.34 20/25 HP. CHASSIS - HR SERIES Attached please find copy of Programme covering the 200 - 20/25 HP. Chassis authorised by Worl/RBS.10.34. ROY…
| |
|
scan0314 |
Production schedule and material plan for the 20/25 HP Chassis H2 Series.
| |
|
View original record |
ROY11/MG31.10.34 20/25 HP. CHASSIS - H2 SERIES H2-A. 6101-6200 H2-B. 6201-6300 Number of Chassis in Series ................. 200 Proposed Output ............................ 15 per week (including…
| |
|
scan0315 |
Programme for the 200 - Bentley Chassis E. Series.
| |
|
View original record |
46584 To EX. From ROY AH GSE GPP WHS HS Sha ROY10/MG7.11.34 BENTLEY CHASSIS - E.SERIES Attached please find copy of programme covering the 200 - Bentley Chassis authorised by Wor1/R23.10.34 and…
| |
|
scan0316 |
Production schedule and material ordering timeline for the Bentley E-Series chassis.
| |
|
View original record |
ROY7/MG31.10.34 BENTLEY CHASSIS - E.SERIES E-A. 801-900 E-B. 901-1000 Number of Chassis in Series ............. 200 Proposed Output ......................... 11 per week Authority to proceed given…
| |
|
scan0317 |
Material procurement and production planning for the 40/50 HP & Spectre models.
| |
|
View original record |
SECRET. x4554 Sg. from Wor. e. to E. c. to Hs. Worl/R.19.11.34. 40/50 H.P. Material & Spectre. You have recently agreed to our ordering 50 sets of bars and billets. These can, of course, be used for…
| |
|
scan0318 |
Reversing a decision to halt Phantom production, instead requesting 25 more to be made.
| |
|
View original record |
HS X4554 X7770 To - Wor. from Sg. Copy to E.Ltd.Es. HY. Em. Cr. re Phantoms. Confirming conversation on the telephone, after further considerable careful consideration we want to reverse our decision…
| |
|
scan0319 |
Lifting the embargo on the bulk manufacture of pistons for the 20/25 HP chassis.
| |
|
View original record |
Rm x4584 Dft. Hs/Rm. C. DI/CS. BY.10/G.10.12.34. 20/25 HP. CHASSIS - RE: PISTONS. ----------------------------- Referring to Sft/JMW.3/MW.8.12.34. based, of course, upon our request that the Works…
| |
|
scan0320 |
Attaching the authorised programme for the 40/50 HP GZ series chassis.
| |
|
View original record |
X407 To D.I. from ROY DWI EHT WSD G Hs ******************** ROY19/MG12.12.34 ******************** 40/50 HP. CHASSIS - GZ SERIES Attached please find copy of Programme covering the 25 - 40/50 HP.…
| |
|
scan0321 |
Production schedule for the 40/50 HP. Chassis U2 Series, detailing quantities, key dates, and material requirements.
| |
|
View original record |
NOY2/MG.4.12.34 40/50 HP. CHASSIS - U2 SERIES 7139 - 7163 Number of Chassis in Series ............. 25 Proposed Output ..................... 4 per week Authority to proceed given ............. (26th…
| |
|
scan0322 |
Material and component decisions for the Bentley 'E' Series chassis.
| |
|
View original record |
Hs/Rm. K1200 BY/Cgh.9/G.28.1.35. BENTLEY CHASSIS - 'E' SERIES MATERIAL. With reference to Hs/Rm.25/KW.211.35. although it was agreed verbally that we should introduce the pinion with integral inner…
| |
|
scan0323 |
Updating on the progress of the fine boring of cylinders job, outsourced to Daimler Co. and Archdale & Co.
| |
|
View original record |
E. - from Sft. c. Wor. c. Hs. c. BY Rm x4554 Sft.3/MW.1.2.35. Fine Boring of Cylinders. With reference to memo. E2/HP.1.1.35. and Wor9/T2.1.35. this is to inform you this job is now well in hand. We…
| |
|
scan0324 |
Two alternative production plans concerning Phantom material, U.2. series, and Spectre models for the Olympia Show.
| |
|
View original record |
L4554 Wor. PHANTOM MATERIAL. 12.2.35. We have already in hand for U.2. Series ........... 25 chassis. We cannot promise Spectre for Olympia and there appears to be two alternatives:- (1) Make U.2.…
| |
|
scan0325 |
Comparing in-house manufacturing costs of crankshafts against external supplier quotations.
| |
|
View original record |
4554 Sg. from Hy. FOR. C. to E, Ev, Hs. HyB/R.22.2.35. MANUFACTURING COSTS. Another interesting comparison of cost of manufacture has arisen which you will no doubt be pleased to know of, and which…
| |
|
scan0326 |
Attached programme for 200 Bentley F.Series chassis.
| |
|
View original record |
X4584 TO EY. from ROY ~~OFT~~ ~~HO~~ ~~MWX~~ ~~Q~~ ~~Hs~~ ~~MS~~ ROY2/MG26.2.35 BENTLEY. CHASSIS - F.SERIES Attached please find copy of Programme covering the 200 - Bentley Chassis authorised by…
| |
|
scan0327 |
Production and material schedule for the Bentley Chassis F-Series.
| |
|
View original record |
ROY2/MG22.2.35 BENTLEY CHASSIS - F.SERIES F-A. 1001-1100 F-B. 1101-1200 Number of Chassis in Series ............. 200 Proposed Output ........................ 13 per week (including holidays)…
| |
|
scan0328 |
Attached programme for the 20/25 HP Chassis, J2 Series.
| |
|
View original record |
+6534 To PY. from ROY CFT. A.F.S. E.W.H. G. Hs Hde -------------------- ROY2/MG26.2.35 -------------------- 20/25 HP. CHASSIS - J2/SERIES Attached please find copy of programme covering the 200 -…
| |
|
scan0329 |
Production schedule and material ordering timeline for the 20/25 HP Chassis, J2 Series.
| |
|
View original record |
ROY4/MG22.2.35 20/25 HP. CHASSIS - J2 SERIES J2-A. 6301-6400 J2-B. 6401-6500 Number of Chassis in Series ................... 200 Proposed Output ............................ 17 per week Authority to…
| |
|
scan0330 |
Distributing programmes for 20/25 HP Chassis K.2 and L.2 series, with a proviso on design alterations.
| |
|
View original record |
X1200 To BY. from ROY. SY. [crossed out] SFF [crossed out] Rs [crossed out] FWS [crossed out] G [crossed out] HS [crossed out] Hsg [crossed out] ----------------- ROY1/MG21.5.35 -----------------…
| |
|
scan0331 |
Production schedule and key dates for the 20/25 HP Chassis, K2 Series.
| |
|
View original record |
HOYS/MG14.5.35 20/25 HP. CHASSIS - K2 SERIES K2-A. 6501-6600 K2-B. 6601-6700 Number of Chassis in Series ................. 200 Proposed Output ............................ 14 per week (including…
| |
|
scan0332 |
Production schedule and material requirements for the 20/25 HP Chassis L2 Series.
| |
|
View original record |
ROY4/MG14.5.35 20/25 HP. CHASSIS - L2 SERIES L2-A. 6701-6800 L2-B. 6801-6900 Number of Chassis in Series ............ 200 Proposed Output ........................ 14 per week (including holidays)…
| |
|
scan0333 |
The supply of parts for the 20/25 HP Chassis K.2 series, pending a revised design.
| |
|
View original record |
X1200 Rm c. Hs/Rm. BY26/N.7.8.35. Re: 20/25 HP. Chassis - K.2. series Material. The Order Office have informed me that the following parts are to go from hand to mouth pending the revised design,…
| |
|
scan0334 |
The Bentley G-Series chassis output programme for chassis numbers 1201 to 1400.
| |
|
View original record |
To HY. from ROY X1200 ROY3/MG12.8.35 BENTLEY CHASSIS OUTPUT - G.SERIES 1201 - 1400 Attached please find Programme covering the 200 sets of material released by mor4/R.4.7.35 ROY. ENCLOSURE. Copy of…
| |
|
scan0335 |
Production and materials schedule for the Bentley Chassis 'G' Series.
| |
|
View original record |
ROY2/MG12.8.35 BENTLEY CHASSIS - "G" SERIES G-A. 1201-1300 G-B. 1301-1400 Number of Chassis in Series ............ 200 Proposed Output ............ 10 per week (including holidays) Authority to…
| |
|
scan0336 |
Secret internal memorandum regarding the production schedule, material ordering, and tooling for the Spectre or Phantom III.
| |
|
View original record |
X1200 Hy. from Wor. Sft. ABM. Ws. By. MP. Roy. Mx. c.c. to E. Hs. D/BR. SECRET. Wor2/R.11.9.35. SPECTRE - OR PHANTOM III'S. Will By. please release, and will Roy. please order, 200 sets of material…
| |
|
scan0337 |
Material for the 'G' series Bentley, standardising to a 10' Borg & Beck clutch for the large bore engine.
| |
|
View original record |
X1200 To By. Hs/Gry.11/KW.28.10.35. Material for 'G' series Bentley. At the introduction of the large bore engine we shall standardise a 10" Borg & Beck clutch, and so recommend that material for the…
| |
|
scan0338 |
Programme for 200 sets of material for the 40/50 HP 'A' Series Chassis - Phantom III.
| |
|
View original record |
X1200 To BY. from ROY PT. WS. EWT G. Hs. Ms. ROY4/MG15.11.35 40/50 HP "A" SERIES CHASSIS - PHANTOM III Attached please find Programme covering the 200 sets of material released by Wor2/R11.9.35. ROY.…
| |
|
scan0339 |
Production and material schedule for the Phantom III A-Series chassis.
| |
|
View original record |
ROY1/MG14.10.35 PHANTOM III - A.SERIES A. 25 - 124 B. 125 - 224 Number of Chassis in Series ................... 200 Proposed Output ............................... 6 per week (including holidays)…
| |
|
scan0340 |
Programme covering the release of material for 200 sets of Bentley H. Series chassis (1401-1600).
| |
|
View original record |
To SY from ROY C. SFF G. Hs C. G C. Hs S. Hs x1200 ROY17/MG30.12.35 BENTLEY CHASSIS - H. SERIES Chassis 1401-1600 (inclusive) Attached please find Programme covering the 200 sets of material released…
| |
|
scan0341 |
Production schedule and material ordering for the Bentley Chassis H-Series.
| |
|
View original record |
ROY1/MG20.12.35 BENTLEY CHASSIS - H.SERIES H-A. 1401-1500 H-B. 1501-1600 Number of Chassis in Series ............ 200 Proposed Output ........................ 10 per week (including holidays)…
| |
|
scan0342 |
Material release programme for 200 sets for the 20/25 HP, M.2 Series chassis.
| |
|
View original record |
TO HY. from ROY. Mr. A Mr. B Mr. C Mr. H C. Hs C. Ma (Handwritten: X1200) ROY10/WG/31.12.35 20/25 HP. CHASSIS - M.2 SERIES Chassis 6901-7100 Attached please find Programme covering the 200 sets of…
| |
|
scan0343 |
Production schedule and timeline for the 20/25 HP. Chassis - M.2 Series.
| |
|
View original record |
ROY2/MG20.12.35 20/25 HP. CHASSIS - M.2 SERIES M2-A. 6901-7000 M2-B. 7001-7100 Number of Chassis in Series ............. 200 Proposed Output ........................ 12 per week (including holidays)…
| |
|
scan0344 |
The Bentley H.Series chassis programme, requesting expedition of unreleased details from the Drawing Office.
| |
|
View original record |
To EY, from ROY. c. to WOP. C. to SPER c. to Hs. X1200 ROY2/M05.2.36 BENTLEY CHASSIS - H.SERIES According to present Programme, i.e., at the rate of 10 per week, the first Chassis in Bentley H.Series…
| |
|
scan0345 |
Parts list for a Bentley H.Series chassis, categorized by section number.
| |
|
View original record |
List to accompany ROY2/MG5.2.36 BENTLEY CHASSIS - H.SERIES Sec: 5000. Crankcase & Bearings 8 parts 5020. Spring Drive All " 5040. Piston All " 5060. Valve & Fittings 2 " 5090. Camshaft 1 part 5100.…
| |
|
scan0346 |
Requesting the expedition of unreleased details for Phantom III chassis sets.
| |
|
View original record |
To RY. from ROY. C. to Wor. C. to SFT. C. to Hs. X1200 ROY/M05.2.36 PHANTOM III CHASSIS - 12 Sets and 50 Sets Details as list attached have not yet been released to us, and if arrangements could be…
| |
|
scan0347 |
Parts list for the Phantom III Chassis, detailing quantities required for 12 and 50 sets.
| |
|
View original record |
List to accompany ROY3/MG5.2.36 PHANTOM III CHASSIS- 12 Sets and 50 Sets Sec. 5000. Crankcase & Bearings 2 parts 5050. Cylinder 2 " 5070. Inlet Pipe All " 5082. Air Silencer All " 5160. Water Pump 1…
| |
|
scan0348 |
From 'Wor' to 'Roy' about chassis production delays affecting sales promises.
| |
|
View original record |
To Roy. from Wor. By Mr. Hs. [Struck through] I am anxiously waiting for another report, which is almost due, in connection with material on order. On the last report we are still waiting for 7% of…
| |
|
scan0349 |
Status of material orders and drawings for the Phantom III and 25/30 HP chassis.
| |
|
View original record |
X1200 Wor. [strikethrough] c.c. Bey. c.c. E.B. c.c. Hs. BY/Cgh.8/G.26.2.36. CHASSIS MATERIAL ON ORDER. With reference to Wor.10/T.25.2.36. detail drawings were issued as promised in…
| |
|
scan0350 |
Stock levels and giving production orders for 25/30 HP chassis material.
| |
|
View original record |
SECRET X1200 Hy. from Wor. Sft. A.H.M. By. Rey. D/BP. Hs. 25/30 H.P. Chassis Material. Wor5/R.23.3.36. We have material in hand as under:- (a) 200 sets for 'L.2' Series (b) 200 " " 'M.2' " (c) 200 "…
| |
|
scan0351 |
Secret internal memo regarding material stock and production orders for the 4¼-Litre Bentley.
| |
|
View original record |
SECRET. X/209 Hy. from Wor. Sft. AEM. By. Roy. B/Br. Hs. 4¼-Litre Bentley. Wor4/R.23.3.36. We have material in hand as under:- (a) 200 sets for 'G' Series (b) 200 " " 'H' " (c) 200 " of bar and billet…
| |
|
scan0352 |
Release and hold-up of materials for Bentley and 20/25 series cars.
| |
|
View original record |
X1200 30.3.36. Release of Material. Bentley. Cars on test the end of August - 'J' series, 200 cars. Hold up the clutch, particularly the centre, carburetters and inductions pipes, final machining of…
| |
|
scan0353 |
Request to immediately order a further 200 sets of Phantom III material, including bar, billet, and forgings for crankshafts.
| |
|
View original record |
Hy. from Wor. Sft. ARM. By. Roy. D/BP. Hs. X1200 P.III. MATERIAL. Wor2/R.1.4.36. Will you please arrange to order immediately a further 200 sets of material, including bar and billet and the 'long…
| |
|
scan0354 |
Material programme for Bentley J.Series Chassis 1601-1800.
| |
|
View original record |
X1200 To BY. from ROY C. SPT C. WS C. HWT C. G C. Hs C. Ms ROY2/MG17.4.36 BENTLEY CHASSIS J.SERIES Chassis 1601-1800 Attached please find Programme covering the 200 sets of material released by…
| |
|
scan0355 |
Production schedule and material requirements for the Bentley J.Series Chassis.
| |
|
View original record |
BENTLEY CHASSIS - J.SERIES ROY9/MG7.4.36 J.A 1601-1700 J.B 1701-1800 Number of Chassis in Series ............ 200 Proposed Output ........................ 15 per week (including holidays) Authority to…
| |
|
scan0356 |
Programme covering 200 sets of material for the 20/25 HP. Chassis - N/2 Series, chassis numbers 7107-7306.
| |
|
View original record |
X1200 To. BY. from ROY C. JPT C. WS C. EWT C. G C. Hs C. Mg Rm ROY1/MG17.4.36 20/25 HP. CHASSIS - N/2 SERIES Chassis 7107-7306 Attached please find Programme covering the 200 sets of material released…
| |
|
scan0357 |
Production schedule for the 25/30 HP. Chassis - N.2 Series.
| |
|
View original record |
ROY1/MG7.4.36 25/30 HP. CHASSIS - N.2 SERIES N2.A 7107-7206 N2.B 7207-7306 Number of Chassis in Series ............. 200 Proposed Output ........................ 15 per week (including holidays)…
| |
|
scan0358 |
The order of materials for 'D' and 'C' series chassis.
| |
|
View original record |
Hoy. from Hy. Hy. cpt. sec. D/Mr. Hs. X1200 P.III. MATERIAL. Hy5/R.19.5.36. Further to Wor2/R.1.4.36., please order up the balance of the material for 200 'D' Series chassis, subject, of course, to…
| |
|
scan0359 |
From ROY requesting confirmation on a programme for material for 200 Phantom III Chassis, numbers 213-412.
| |
|
View original record |
X1200 To HY. from ROY. c.c. to E. c.c. to BY c. to Hs. ROY10/MG13.5.36 200 P.III Chassis Nos. 213-412 Following our recent conversation, as arranged we have Wor's authority for 200 sets of Bar and…
| |
|
scan0360 |
Production schedule for the Phantom III - 'B' Series, detailing chassis numbers, output targets, and milestone dates.
| |
|
View original record |
ROY14/MG13.5.36 PHANTOM III - 'B' SERIES A. 213-312 B. 313-412 Number of Chassis in Series ............ 200 Proposed Output ........................ 10 per week Authority to proceed given…
| |
|
scan0361 |
Material hold-ups and production continuity for the Bentley Chassis 'J' Series.
| |
|
View original record |
BY. Hy. Hs. Sfty. Rm x1200 ROY/MS14/P.20.5.36. BENTLEY CHASSIS - 'J' SERIES. Attached is memo ref. ROY/AES3/T.2.5.36., giving details of material held up on the above series. If the output remains at…
| |
|
scan0362 |
List of parts held up by the Drawing Office (D.O.) for the Bentley Chassis 'J' Series.
| |
|
View original record |
Roy. Roy/AES.3/HT.2.5.36. RE:- BENTLEY CHASSIS. 'J' SERIES. --------------------------------- Parts held up by the D.O. :- Sec: 5070. Inlet Pipes. All. Parts. " 5080. Carburetter. All. " " 5240.…
| |
|
scan0363 |
Programme for the Phantom III B-Series Chassis, numbers 213-412.
| |
|
View original record |
To BY. from ROY. c. SPT c. WS c. EWT c. G c. Hs c. Ms X1200 ROY1/MG22.5.36 PHANTOM III CHASSIS - B.SERIES Chassis 213 - 412 Attached please find Programme covering 200 sets of material released by…
| |
|
scan0364 |
Production schedule and material order dates for the Phantom III 'B' Series chassis.
| |
|
View original record |
ROY14/MG13.5.36 PHANTOM III - "B" SERIES A. 213-312 B. 313-412 Number of Chassis in Series ................... 200 Proposed Output ............................... 10 per week Authority to proceed…
| |
|
scan0365 |
List of modifications affecting an order of 200 sets of material for the Phantom 111 'B' Series chassis.
| |
|
View original record |
Hs/Rm. X1200 BY/Cgh.3/G.29.5.36. PHANTOM 111 CHASSIS - 'B' SERIES. -------------------------------- With reference to our conversation in regard to the 200 sets of material which we are to order for…
| |
|
scan0366 |
List of proposed vehicle modifications with handwritten notes discussing their implementation on chassis 32Ex and 37Ex.
| |
|
View original record |
- 2 - BY/Ogh.3/G.29.5.36. [Handwritten] F. DODD. Was this on 32 EX. [Handwritten] Rm. [Handwritten] Yes! - HS/FD. Lec.4971 - Rubber Mounted Petrol Pump, arranged so that the pump can be removed…
| |
|
scan0367 |
Provisional standardisation for the 25/30 HP Chassis 'N2' Series.
| |
|
View original record |
To By. X1200 Hs/Rm.7/KW.8.6.36. 25/30 HP. Chassis - 'N2' Series. With reference to the attached note, Roy/MS15/P.20.5.36. As far as we know at present, there is no reason why you should not go ahead…
| |
|
scan0368 |
Material stock and ordering instructions for 4 1/4-litre Bentley parts for various series.
| |
|
View original record |
X1200 [Strikethrough]Mr.[/Strikethrough], from Hy. [Strikethrough]Mr.[/Strikethrough] [Strikethrough]Roy.[/Strikethrough] Hs. [Strikethrough]4 1/4-litre Bentley material.[/Strikethrough]…
| |
|
scan0369 |
Programme for 200 sets of material for the 25/30 HP Chassis '02' Series.
| |
|
View original record |
X1200 To BY. from ROY. c. SFT c. WS c. EWT c. G c. Hs c. MS ROY10/MG7.8.36 25/30 HP. CHASSIS - "02" SERIES Chassis 7313-7512 Attached please find Programme covering the 200 sets of material released…
| |
|
scan0370 |
Production schedule and material ordering timeline for the 25/30 HP Chassis '02' Series.
| |
|
View original record |
ROY5/MG7.8.36 25/30 HP. CHASSIS - "02" SERIES 02-A. 7313-7412 02-B. 7413-7512 Number of Chassis in Series ............. 200 Proposed Output ............................ 17 per week (including…
| |
|
scan0371 |
Cover letter for a programme covering 200 sets of material for Bentley 'K' Series chassis 1801-2000.
| |
|
View original record |
To DY from ROY. C. SMH C. WEI C. SWI C. G C. Ha C. Ms X1200 ROY.11/MG.7.8.36 BENTLEY CHASSIS - "K" SERIES Chassis 1801-2000 Attached please find Programme covering the 200 sets of material released by…
| |
|
scan0372 |
Production schedule and timeline for the Bentley 'K' series chassis.
| |
|
View original record |
ROY7/MG7.8.36 BENTLEY CHASSIS - "K" SERIES K-A 1801-1900 K-B 1901-2000 Number of Chassis in Series ............. 200 Proposed Output ........................ 12 per week (including holidays) Authority…
| |
|
scan0373 |
Stock levels and ordering of 25/30 HP chassis material.
| |
|
View original record |
Sft. from Hy. By. Roy. D/Dr. Hs. X1200 25/30 H.P. CHASSIS MATERIAL Hyl/R.28.7.36. We have material in hand as under:- 200 sets for 'M.2' Series 200 sets " 'N.2' " 200 sets of bar & billet for 'O.2'…
| |
|
scan0374 |
Ordering bar and billet material for 'C' and 'D' Series.
| |
|
View original record |
X1200 Cft. from Hy. AHV. EBS. HOJ. G/DE. HS. F.III MATERIAL. Hy2/R.4.9.36. We have on order or in hand;- 200 sets of bar and billet for 'C' Series. Please order outstanding material, making these into…
| |
|
scan0375 |
The programme for material release for the Phantom III C.Series, chassis 413-617.
| |
|
View original record |
TO Df. from ROY. C. H C. PW 2 C. S C. Hs ✓ C. H X1200 ROY/HG23.9.36 PHANTOM III CHASSIS - C.SERIES Chassis 413-617 Attached please find Programme covering the 200 sets of material released by…
| |
|
scan0376 |
Production schedule for the Phantom III C.Series chassis detailing quantities, timelines, and material requirements.
| |
|
View original record |
ROY2/W022.9.36 PHANTOM III - C.SERIES C-A. 413-512 C-B. 513-612 Number of chassis in Series .......... 200 Proposed Output .................... 10 per week including holidays Authority to proceed…
| |
|
scan0377 |
List of modifications to be incorporated on the Bentley Chassis series material.
| |
|
View original record |
HS/Rm. BY/Cgh.1/W.23.9.36. BENTLEY CHASSIS : SERIES MATERIAL. The following is a list of the modifications which you consider should be incorporated on production chassis,and for which you are in…
| |
|
scan0378 |
Recommendation to not implement close inlet valve clearances on all production cars, but to test on a small batch first.
| |
|
View original record |
To By. X1200 Hs/Rm.8/KW.28.9.36. With reference to By/Cgh.1/W.2.9.36, we recommend that we do not go over to close inlet valve clearances on all production cars, but put a small batch through to gain…
| |
|
scan0379 |
Authorising the order of bar and billet material for the 25/30 HP chassis.
| |
|
View original record |
X1200 Hys from Wor. SEV. ARM. P/SP Ly. Hs. Dey. Wor5/R.7.10.36. Re: 25/30 H.P. CHASSIS MATERIAL. We have on order or in hand:- 200 sets of bar and billet for 'P.2' Series. Please order outstanding…
| |
|
scan0380 |
Programme for 200 sets of material for the 25/30 HP Chassis, P.2 Series.
| |
|
View original record |
1200 To BY from ROY c. RHC c. Rm c. WS c. EWT c. G c. Ms. ROY7/MG27.11.36 25/30 HP. CHASSIS - P.2 SERIES Chassis 7513-7712 Attached please find Programme covering the 200 sets of material released by…
| |
|
scan0381 |
Production schedule for the 25/30 HP Chassis - P.2 Series, detailing output and timelines for materials and parts.
| |
|
View original record |
ROY5/MG24.11.36 25/30 HP. CHASSIS - P.2 SERIES P2-A. 7513-7612 P2-B. 7613-7712 Number of Chassis in Series .............. 200 Proposed Output .......................... 17 per week (including…
| |
|
scan0382 |
Ordering of material for 'L' and 'M' series Bentley chassis.
| |
|
View original record |
COPY. 1200 To Hs. from Sg. c. to C. Cx. Sg.1/E.3.12.36. Material for Bentley Chassis. I understand that more material is due to be ordered. It will be in order, therefore, for the bar and billet…
| |
|
scan0383 |
Sourcing of heat-treated steel bars from Messrs. Newall of Glasgow and its implications on manufacturing.
| |
|
View original record |
1200 Hmr. (struck through) Hy. (struck through) HOY. (struck through) BY. From RHC/GH. W. (struck through) RHms. (struck through) RHC/GH.4/IB.15.12.36. We understand that Messrs.Newall of Glasgow can…
| |
|
scan0384 |
Inquiry into the cost and usage of the product Millenite in chassis production.
| |
|
View original record |
1200. Rm/AFM. from Rm. Rm/Smth. MILLENITE. Millenite appears to be an expensive product which, at the moment, does not justify its cost. We should like to know:- (a) How much is being used on chassis…
| |
|
scan0385 |
Orders for 25/30 HP chassis materials, including bar and billet sets for various car series.
| |
|
View original record |
To Hy. from Hs, c. to RBO. AEM. BY. 1200. Reg. HHH. D/EP. Es.7/KW.21.12.36. 25/30 HP. Chassis Material. We have on order or in hand :- 200 sets of Bar and Billet Material for 'A.2' series. Please…
| |
|
scan0386 |
Enquiries into the cost and selection of different materials for brake drums.
| |
|
View original record |
1200 To Roy. from Rm/AFM. c.c. to Roy/Ms. Rm/AFM.15/AP.21.12.36. BRAKE DRUM MATERIAL. Roy/Ms. has been making enquiries into the cost of brake drum cast irons other than Millenite. When he has…
| |
|
scan0387 |
Plans to test a low-carbon case-hardening steel as a cost-saving replacement for 5% nickel steel in various engine parts.
| |
|
View original record |
To HFS. Copy to Mr. EV. Rm. RAG. /JMR. 1200 E/PSN.3/MN.22.12.36. OKL Parts to be tested in Low Carbon Casehardening Steel. It has now been agreed to test out a low carbon case-hardening steel to…
| |
|
scan0388 |
Parts list for Bentley, 25/30, and Phantom III models with associated notes.
| |
|
View original record |
-2- Bentley. EB.2746. Camshaft. EB.199. Adjusting Screw (Stop on Carbs.) EB.2853. Stop (Carbs.) E.70956. Ball (Carb.Control) 25/30. E.59919. Camshaft. Phantom III. E.85121. Crankshaft Pinion. E.86975.…
| |
|
scan0389 |
Requesting an order for bar and billet material for 'L' and 'M' series Bentley chassis.
| |
|
View original record |
To Hy. from Hs. c. to REG. AHM. BY. Roy. Rms D/EF. 1200 HS.13/KW.24.12.36. Bentley Chassis Material. We have on order or in hand :- 200 sets of Bar & Billet material for 'L' series. Please order…
| |
|
scan0390 |
Letter to the Aluminium Protection Co. Ltd. requesting a sample of their advertised Stainless Aluminium.
| |
|
View original record |
γ 1200 Experimental Department 12th January 1937 Rm/Wym.1/AP. The Aluminium Protection Co.Ltd., Dialumin Works, Brentford Road, Willesden, LONDON N.W.10 Dear Sirs, With reference to your advertised…
| |
|
scan0391 |
Instruction deadlines for held-up details and future modifications for the 25/30-HP 'R2' Series chassis.
| |
|
View original record |
BY/Ugn. c. to RWS. c. to Rm. r 1200 ROY/MS25/P.12.1.37. 25/30-HP CHASSIS - "R2" SERIES. With reference to the various details held up on the above Series, as the first chassis is due to test August…
| |
|
scan0392 |
Held-up details and future improvements for the Bentley 'L' Series chassis.
| |
|
View original record |
EH/egh. c. to RHC. c. to Rm. J 1200 ROY/MS24/F.12.1.37. BENTLEY CHASSIS - "L" SERIES MATERIAL. With reference to the various details held up on the above series, the first chassis is due to test July…
| |
|
scan0393 |
Programme for 200 sets of material released for the 25/30 HP Chassis R.2 series.
| |
|
View original record |
1200 To SY. from ROY. c. RHC c. Rm c. We c. HWT c. G c. Ms ROY5/MG18.1.37 25/30 HP. CHASSIS - R.2 SERIES Chassis 7513-7712 Attached please find Programme covering the 200 sets of material released by…
| |
|
scan0394 |
Production schedule and material ordering timeline for the 25/30 HP 'R2' Series chassis.
| |
|
View original record |
ROY2/MG18.1.37 25/30 HP. CHASSIS - "R2" SERIES R2-A. 7713-7812 R2-B. 7813-7912 Number of Chassis in Series ............ 200 Proposed Output ........................ 15 per week excluding holidays…
| |
|
scan0395 |
The programme for 200 sets of material for Bentley Chassis 'L' Series (2001-2200).
| |
|
View original record |
1200 To HY. from ROY. c. RHC c. Rm. c. Wo. c. DMI c. G c. MS. ROY6/MG18.1.37 BENTLEY CHASSIS "L" SERIES Chassis 2001-2200 Attached please find Programme covering the 200 sets of material released by…
| |
|
scan0396 |
Production schedule for the Bentley 'L' Series chassis, detailing output, order completion, and material timelines.
| |
|
View original record |
BENTLEY CHASSIS - "L" SERIES L-A. 2001-2100 L-B. 2101-2200 Number of Chassis in Series ................... 200 Proposed Output ............................. 12 per week excluding holidays Authority to…
| |
|
scan0397 |
Scheduling and ordering of chassis material for the Phantom III model.
| |
|
View original record |
E. Rm. J 1200 RHC/JMW.9/JWA.3.2.37. Re: Chassis Material - Phantom III. RHC has received a memo ' Sg.12/E.1.2.37., reading as follows:- "I understand that the present position is that the last of 'C'…
| |
|
scan0398 |
Material and design modifications for the Phantom III (35-EX) model.
| |
|
View original record |
1200 Hs. from Rm. c. to E. d. to By. Rm11/R.10.2.37. P.III MATERIAL. 35-EX now running in France is fitted with a number of features which are of considerable value in making a better motor-car, and…
| |
|
scan0399 |
List of vehicle improvements including exhaust, suspension, clutch, brakes, and a note on tyres.
| |
|
View original record |
-2- Rm11/R.10.2.37. Cont'd. (2) Exhaust System. to GWH. This main silencer is so simple and robust that we do not anticipate any trouble with it at all. (3) Wraith Suspension & Steering Levers. Fitted…
| |
|
scan0400 |
Chassis programme memo for the Phantom III D.Series, covering chassis numbers 601-800.
| |
|
View original record |
To BY. from ROY. c. RHO c. Rm c. We c. EWFA c. C.G. c. Ms 1200 ROY12/MG15.2.37 CHASSIS PROGRAMME Phantom III. D.SERIES. Nos. 601-800 Attached please find Programme covering the 200 sets of material…
| |
|
scan0401 |
Production schedule and material order dates for the Phantom III Chassis - D.Series.
| |
|
View original record |
ROY8/A 15.2.37 PHANTOM III CHASSIS - D.SERIES D-A. 601-700 D-B. 701-800 Number of Chassis in Series ....................... 200 Proposed Output ................................... 12 per week to end…
| |
|
scan0402 |
Use of Carobronze tubing for bushes as a replacement for phosphor bronze.
| |
|
View original record |
Hs/CAN. c. Hs. c. Rm. c. RHC. 1200? BY/EM.38/MM.14.6.37. Handwritten note: GHL Can you get me some information as to what this is all about CAROBRONZE TUBING FOR BUSHES. With reference to the…
| |
|
scan0403 |
The release of Wraith forgings and pressings, pending a 15,000-mile car test.
| |
|
View original record |
RHC. from Rm. c. E. c. By. c. HPS. c. SS._________ 1200 Rm4/R.25.6.37. WRAITH FORGINGS - PRESSINGS. RHC.3/MJ.24.6.37. We are as anxious as you are to release Wraith pieces. We believe in the long run,…
| |
|
scan0404 |
Authorising the order for the balance of material for 100 sets of 'S' series 25/30 HP.
| |
|
View original record |
To Hoy. c. to Hy. RHC. AHM. BY. Tms. D/Dr. Hs.4/KM.28.6.37. 1200 25/30 HP. Material. Please note, it will be in order for you to order the balance of the material for 100 sets of 'S' series, 25/30…
| |
|
scan0405 |
Requesting an order for the balance of material for 200 sets of 'M' series Bentley Material.
| |
|
View original record |
To Roy. c. to Hy. HHG. AEN. BY. Rms. D/EP. 1200 Hs.5/KW.28.6.37. BENTLEY MATERIAL. Will you please order up the balance of the material for 200 sets of 'M' series, the bar and billet for which was…
| |
|
scan0406 |
Extended delivery times for Wraith forgings and pressings, urging the prompt ordering of dies and tools.
| |
|
View original record |
To Rm. From RHC. c. to E. c. to By. c. to HPS. c. to SS. 1200 RHC.3/MJ.24.6.37. WRAITH FORGINGS, PRESSINGS. Deliveries of forgings and pressings will be very extended and in order to get in with the…
| |
|
scan0407 |
Progress report on the development and testing of the Wraith model, detailing ongoing technical issues and future plans.
| |
|
View original record |
SECRET. Sg. from Rm. Hs. c. By. c. RHC. WRAITH MATERIAL. In about three weeks' time we hope to be able to release the majority of the Wraith chassis to the Works. This does not mean that no further…
| |
|
scan0408 |
Delays and design changes to an engine, reverting to an integral construction which requires a new crankcase casting.
| |
|
View original record |
-2- Rm4/R.9.8.37. from France, put the new unit and modified fuel system on this chassis, and send it out again to continue running. Unfortunately, we do not expect this unit will be ready in less…
| |
|
scan0409 |
Urgent memo instructing the Order Office to proceed with ordering material for the Wraith model.
| |
|
View original record |
To BY. & (Rm.) From RHC. 1200 c. to Ms. c. to Roy. RHC.2/MJ.29.9.37. WRAITH MATERIAL. We understand that no material has yet been ordered for Wraith and should be pleased therefore if you would…
| |
|
scan0410 |
Modifications to the Bentley 'M' Series material.
| |
|
View original record |
1200. Copy. S/W To BY. from Sg. Copy to Hs. Re Bentley 'M' Series Material. Sg28/E.29.9.37. Now that it has been decided to go ahead with the whole 200, the question arises regarding the modifications…
| |
|
scan0411 |
On matters for consideration when releasing material for the first 100 Wraith chassis.
| |
|
View original record |
600 ? 1200 ? W R A I T H. Rml/R.11.10.37. MATTERS FOR CONSIDERATION IN RELEASING THE 1st 100 CHASSIS MATERIAL. (1) FRAMES & FITTINGS. We cannot release the front and rear engine mounting, the rearmost…
| |
|
scan0412 |
Status report on the readiness of various vehicle components for production, noting issues and release quantities.
| |
|
View original record |
-2- (5) DASH BRACKETS. O.K. for 100 sets. (6) FLOOR BOARDS. O.K. for 100 sets. (7) PRESS PIPE, HYDRAULIC JACKS, PEDALS. O.K. for 100 sets. (8) PETROL PIPES & PUMP. We are fitting the first six to…
| |
|
scan0413 |
Release and production status of various vehicle components.
| |
|
View original record |
-3- Rml/R.11.10.37. (14) CROSS STEERING TUBE. There does not appear to be any point in releasing six sets without the rest of the steering. (15) REAR AXLE. We can release 100 sets of these with the…
| |
|
scan0414 |
Status report on various vehicle components including exhaust, engine, gearbox, and electrical systems.
| |
|
View original record |
-4- (23) EXHAUST SYSTEM & FITTINGS. We have released the suspension to Lec.5752 and expansion chambers to LOP. E.W.1046 for the first 6 cars. We are experimenting with lighter gauge material before we…
| |
|
scan0415 |
Request to order 6 sets of materials for a 25/30 HP. Chassis, listing various parts and their corresponding drawing numbers.
| |
|
View original record |
To RHC/CAN: cr Hoy/Alm cr HHC cr HPG c. S/RD. c. Rm/Grys. RC 12 00. BY/RD.1/B.13.10.37. Re 25/30 HP. Chassis - 6 Sets of Material. Will you please order 6 sets of material as requested, to the…
| |
|
scan0416 |
Providing tracings and requesting an order for parts for the first six sets of a 25/30-HP chassis.
| |
|
View original record |
c. Rm/Grys. 1200 BY/CRL.1/E.13.10.37. 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. Please receive herewith tracings of the following LOP's :- Sec.6000. LOP. GW.962. Flywheel & Clutch. " 6035. "…
| |
|
scan0417 |
Requesting an order of materials for the first six 25/30-HP chassis, accompanied by tracings.
| |
|
View original record |
To. [REDACTED] Cc. [REDACTED] O. [REDACTED] C. Mr/Grys. cx.[REDACTED] 12.00 BY/CRL.1/E.23.10.37. 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. Please receive herewith tracings of the following…
| |
|
scan0418 |
Instruction for the revision of operations for Wraith III Chassis wire fittings, Section 521C.
| |
|
View original record |
1200 (RC) BY/CS2/EH.26.10.37. Re Wraith III Chassis - Wire Fittings - Section 521C. 6 sets. Please receive herewith the following tracings for the revision or addition of operations. E.W.1234 Ignition…
| |
|
scan0419 |
Order for 6 sets of materials for the Wraith Chassis.
| |
|
View original record |
To RHC/CAN c. Hm/Grys. 7200 BY/RD.5/B.28.10.37. Re: Wraith Chassis : 6 Sets of Material. Will you please order 6 sets of material, as requested, to the following LOPs. :- Sec.8120. Ignition…
| |
|
scan0420 |
Material and tracings for the first six sets of a 25/30-HP chassis.
| |
|
View original record |
c.c. Rm/Grys. 1200 BY/GRL.4/H.30.10.37. Gracie 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. Please receive herewith tracings of the following LOP's. :- Sec.6030. LOP. GW.1326. Gear Box & Act.…
| |
|
scan0421 |
Material tracings for the first six sets of the 25/30-HP Chassis.
| |
|
View original record |
[REDACTED] e. Rm/Grys. 1200 BY/CRL.8/B.1.11.37. 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. Please receive herewith tracings of the following LOP's :- Sec.7042. LOP. GW.1613. Spring Susp.…
| |
|
scan0422 |
Material for the first six sets of undersheets for the 25/30-HP chassis.
| |
|
View original record |
To: [REDACTED] c.c. Hcy/Mott. c.c. RRC. c.c. S/nb. c. Hm/Grys. [REDACTED] 1200 S T D BY/CRL.S/E.4.11.37. hRu Rm/STD 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. UNDERSHEETS. SECTION 6160.…
| |
|
scan0423 |
Requesting the order of materials for the first six sets of the 25/30-HP chassis, focusing on the rear axle.
| |
|
View original record |
To. HHG/Garage O. Roy/Rex. O. HHG. R. HHSt. O. G/Dev. c. Rm/Grys. c. BY/sldr. 1200 BY/CRL.1/E.4.11.37. 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. Please receive herewith the tracing of the…
| |
|
scan0424 |
Order for 6 sets of material for a Wraith Chassis horn switch.
| |
|
View original record |
1200 To RHC/CAN. c. Roy/Ms. c. RHCs c. HPS. c. Bm/Grys. c. G/Rbt BY/RD.1/B.6.11.37. Re: Wraith Chassis : 6 Sets of Material. Will you please order 6 sets of material as requested, to the following…
| |
|
scan0425 |
Material and tracings for the first six sets of the 25/30-HP chassis brakes.
| |
|
View original record |
[Redacted Text] 1200 BY/CRL.5/E.9.11.37. 25/30-HP. CHASSIS. RE. MATERIAL FOR FIRST SIX SETS. Please receive herewith the tracings of the following LOPs:- Sec.6130. LOP. GW.1839. Rear Brakes. Sec.7045.…
| |
|
scan0426 |
Status report on parts releases for Phantom III, Bentley, and Wraith chassis that are not yet complete.
| |
|
View original record |
1200 RHC (Absent). RHC/JRD. Chassis Production Control Office. RHC/DM.4/IB.24.2.38. RELEASES NOT YET COMPLETE. The following shows the position as regards Releases on Phantom III Chassis - 'D' Series…
| |
|
scan0427 |
Progress report on Wraith chassis parts releases, planning, ordering, and test dates for various models.
| |
|
View original record |
continued.... -2- RHC/DM.4/IB.24.2.38. WRAITH CHASSIS. Approximately 85% of the parts Released. " 85% of the above are complete on Operation Planning. " 75% " " " are Ordered. The table below shows…
| |
|
scan0428 |
Article on metallic coatings for piston rings, with excerpts from various automotive trade journals.
| |
|
View original record |
492 1200. THE CHILTON ROUND TABLE In order to give readers of AUTOMOTIVE INDUSTRIES a clue to certain merchandising and service aspects of the automotive industry which are normally outside the scope…
| |
|
scan0429 |
US automotive and aeronautic industry statistics for 1938-1939, including car dealer representation by state and export data.
| |
|
View original record |
File for R.M. 491 Car Dealer Representation by States and by Population Groups* (As of January, 1939) Population Divisions TABLE 1: Car Dealer Representation STATE, 0-1,000, 1,000-2,500, 2,500-5,000,…
| |
|
scan0430 |
Article discussing the properties, processes, and applications of various chemical coatings for improving wear-resistance and anti-corrosion on automotive parts.
| |
|
View original record |
493 Research has brought to the front a new technique. The practice bids for a broad scope of application so here are some unique properties of and Chemical Coatings. as the anodizing of aluminum…
| |
|
scan0431 |
Review of metallic and chemical coatings for engine parts and water repellent treatments for seat covers.
| |
|
View original record |
494 METALLIC AND CHEMICAL COATINGS parts where resistance to wear is essential. To this end they are experimenting on valve stems, valve guides, piston pins, and cylinder liners for the aircraft…
| |
|
scan0432 |
Page from a journal discussing metallic and chemical coatings for engine parts, and new automotive developments.
| |
|
View original record |
METALLIC AND CHEMICAL COATINGS 495 to the surface coatings on rings, pistons, valve guides, rocker arm supports, etc. According to a statement by the Acheson Colloids Corp., the chief advantages in…
| |
|
scan0433 |
Article discussing the development and metallurgical process of malleableizing castings using continuous conveyor type furnaces.
| |
|
View original record |
196 Malleableizing By W. F. Ross* INITIATED by a few of the larger producers of castings for the automotive and machine production industry, the trend toward furnace equipment designed to decrease…
| |
|
scan0434 |
Requesting tests on Bakelite material to investigate swelling when used in an oil pump casing.
| |
|
View original record |
To. HRS. From RHC/DWB. c.c. BI & Rm. c.c. RHC. c.c. HPS/BI. 1200? BAKELITE In connection with tests carried out on an oil pump with Bakelite casing it was found that there was a tendency for the…
| |
|
scan0435 |
Requesting to hold up work on specific pressings for the Bentley 5 due to other design modifications.
| |
|
View original record |
BY/NS. c. Rm. c. ROY/Lee. c. Da/ID. 12.00 DA.4/G.15.5.39. BENTLEY 5. MATERIAL. Will you please hold up work on the following pressings :- FB.4814 Support Bracket for Oil Coil. R.H. FB.4815 " " " L.H.…
| |
|
scan0436 |
Issue of instructions and a list of alterations to part lists for production sets.
| |
|
View original record |
1200 Hs. Rm. RHC. RHC/JRD. Les. BY.1/N.15.7.39. In order to indicate accurately when instructions were issued, I am attaching a list of Part Lists giving the dates on which instructions were issued…
| |
|
scan0437 |
Material list for the Bentley V model, detailing released parts with sections and L.O.P. numbers.
| |
|
View original record |
1260? BY.1/G.14.7.39. BENTLEY V. MATERIAL. Date Released Section Title L.O.P. BY/HEB.1/WB.14.12.38. 6151 Front Brake Equal. FB.4022 Mechanism. BY/HEB.3/WB.7.1.39. 7000 Frame & Fittings. FB.4211 } *…
| |
|
scan0438 |
List of alterations and updates to various vehicle components, tools, and spares.
| |
|
View original record |
- 2 - BY.1/G.14.7.39. Date Released Section Title L.O.P. BY/HEB.1/WB.14.12.39. 7160 Front Shock Damper FB.4728 * 7163 Governor Control Front & Rear Dampers. Not required. 7165 Pressure Piping. Mocked…
| |
|
scan0439 |
List of part alterations for the frame makers assembly.
| |
|
View original record |
SECTION 7000 - FRAME MAKERS ASSEMBLY - LOP. FB.3658. Date released BY/HEB.3/WB.7.1.39. Alteration Date Released. New Pieces. Replaced Pieces. Remarks. 2982 F.s/s. 9.1.39. FB.4525 Stiffener in Frame.…
| |
|
scan0440 |
Log of alterations for the Frame Makers Assembly, detailing new and replaced parts.
| |
|
View original record |
- 2 - SECTION 7000 - FRAME MAKERS ASSEMBLY - LOP. FB.3658. Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. 3032 F. s/s. | FB.4706 Bracket Clutch Pedal Spg. | | F.CD.1169…
| |
|
scan0441 |
Alteration record for the Frame Makers Assembly, detailing new and replaced parts.
| |
|
View original record |
- 3 - SECTION 7000 - FRAME MAKERS ASSEMBLY. LOP. FB.3658. | Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. | |---|---|---|---| | 3130 T. s/s. 1.6.39. | FB.4941 Support Bkt. R.H.…
| |
|
scan0442 |
List of alterations for frames and fittings, detailing new and replaced parts.
| |
|
View original record |
SECTION 7000 - FRAMES AND FITTINGS. LOP. FB. 4211. Date Released - BY/HEB.3/VB.7.1.39. Alteration Date Released. | New Pieces. | Replaced Pieces | Remarks. ---|---|---|--- 2981 Fs/S. 9.1.39. | FB.4528…
| |
|
scan0443 |
Alteration sheet detailing changes to frames and fittings parts.
| |
|
View original record |
- 2 - SECTION 7000 - FRAMES AND FITTINGS. LOP. FB.4211. Alteration Date Released. | New Pieces | Replaced Pieces. | Remarks. ---|---|---|--- 3006 F.s/s 2.2.39. | FB.4302 Locating Screw. KB.1075 2.BA.…
| |
|
scan0444 |
List of alterations for frames and fittings, detailing new and replaced pieces.
| |
|
View original record |
- 3 - SECTION 7000 - FRAMES AND FITTINGS. LOP. FB.4211. Alteration Date Released. New Pieces Replaced Pieces Remarks. FB.4737 (cont'd. Frame Extn. bodies that are longer than standard. BY/HEB.4/WB.…
| |
|
scan0445 |
Alteration list of new parts for frames and fittings, specifically for the engine rear suspension.
| |
|
View original record |
) & 4) SECTION 7000 - FRAMES AND FITTINGS. LOP. FB.4211. Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. ---|---|---|--- 3069 F.s/s. | FB.4863 Gear Box. Xmember. | | G.CD.1249 |…
| |
|
scan0446 |
Alteration sheet detailing new and replaced parts for frames and fittings.
| |
|
View original record |
- 5 - SECTION 7000 - FRAMES AND FITTINGS. LOP. FB.4211. Alteration Date Released. New Pieces. Replaced Pieces. Remarks. 3069 F. s/s. GW.2018 Spherical Brg. Tie Rod. GW.2024 Spherical Seating Tie Rod.…
| |
|
scan0447 |
Record of alterations for rear springs and fittings, detailing new and replaced parts.
| |
|
View original record |
SECTION 7030 - REAR SPRINGS, & FITTINGS. Alteration Date Released. | New Pieces | Replaced Pieces | Remarks. --- ROW 1 --- Alteration: 3023 F.s/s. Date Released: 13.2.39. New Pieces: FB.4544 Distance…
| |
|
scan0448 |
Alteration record for Front Axle components, section 7040.
| |
|
View original record |
SECTION 7040 - FRONT AXLE. Alteration Date Released. New Pieces Replaced Pieces. Remarks. BY/HEB.1/WB. 13.4.39. FB.4873 Cross Strg. Lever. R.H. FB.4874 ..do.. L.H. FB.4134 FB.4135 Note: FB.4873/4 Held…
| |
|
scan0449 |
Alteration record for the Cross Steering system, section 7041.
| |
|
View original record |
SECTION 7041 - CROSS STEERING. Alteration Date Released. New Pieces. Replaced Pieces Remarks BY/HEB.S/WB. 17.4.39. L.O.P. FB.4610 Machining held up on FB.4066 13.6.39. and released 29.6.39.
| |
|
scan0450 |
Alteration log sheet detailing new and replaced parts for the Section 7080 petrol tank.
| |
|
View original record |
SECTION 7080 - PETROL TANK. Alteration Date released. New Pieces. Replaced Pieces. Remarks. 3010 F. s/s 2.2.39. FB.4629 Stiffening Plate Filler Tube, Flange. FW.1107 3029 F. s/s 2.3.39. FB.4678…
| |
|
scan0451 |
List of alterations and part changes for the spring suspension mechanism.
| |
|
View original record |
SECTION 7042 - SPRING SUSPENSION MECHANISM. Alteration Date released. New Pieces. Replaced Pieces. Remarks. 3075 F. s/s. 30.3.39. G.83639 Distance Pce. F.78487 Pipe Clip. F.82497 Ferrule for Oil Pipe.…
| |
|
scan0452 |
Page detailing alterations to the Spring Suspension Mechanism.
| |
|
View original record |
- 2 - SECTION 7042 - SPRING SUSPENSION MECHANISM. Alteration Date released. BY/HEB.1/WB. 7.6.39. New Pieces FB.5033 Adaptor Coil Pipe, Rear End Torque Arm. FB.5034 Coiled Pipe Rear End Torque Arm.…
| |
|
scan0453 |
Alteration record for Steering Column & Box parts.
| |
|
View original record |
SECTION 7050 - STEERING COLUMN & BOX. Alteration Date released. | New Pieces. | Replaced Pieces. | Remarks. ---|---|---|--- BY/HEB.1/WB. 10.1.39. | The following parts are held up :- | FB.4424 FB.4473…
| |
|
scan0454 |
Alteration record for a side steering tube, detailing new and replaced component part numbers.
| |
|
View original record |
SECTION 7070 - SIDE STEERING TUBE. | Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. | |---|---|---|---| | 3097 F. s/s. 2.5.39. | FB.4923 End Socket Side Stg.Tube. Rear. |…
| |
|
scan0455 |
Alteration record for pedal components, detailing new pieces, replaced pieces, and remarks.
| |
|
View original record |
SECTION 7100 - PEDALS. Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. BY/HEB.1/WB. 10.1.39. The following parts are held up :- FB.3758 Bkt.on Frame Clutch & Brake Levers.…
| |
|
scan0456 |
Change log document for dashboard and fitting components, listing new and replaced parts.
| |
|
View original record |
DASHBOARD AND FITTINGS. SECTION 7130. Alteration Date Released. New Pieces. Replaced Pieces. Remarks. 3050 F.s/s. 9.3.39. FB.4756 Catch Bkt. for Bonnet Rear Half. R.H. FB.4757 Catch Bkt. ..do.. L.H.…
| |
|
scan0457 |
Record of alterations for dashboard and fittings, section 7130.
| |
|
View original record |
- 2 - DASHBOARD AND FITTINGS. SECTION 7130. Alteration Date Released. New Pieces. Replaced Pieces. Remarks. 3095 cont'd. F. s/s. 2.5.39. FB.4794 Dashboard. FB.3961 2.BA. Hank Bush - Cable Covers.…
| |
|
scan0458 |
Alteration record for the oil pump on the dash, detailing the replacement of part F.60895 with F.s.4784.
| |
|
View original record |
OIL PUMP ON DASH - SECTION 7141. Alteration Date Released. New Pieces. Replaced Pieces. Remarks. S067 F. B/s. 20.3.39. F.s.4784 Luvax Oil Pump. F.60895 Luvax Oil Pump. BY/HD.7/B. 16.12.38.
| |
|
scan0459 |
Log of alterations for the rear shock damper, section 7150.
| |
|
View original record |
SECTION 7150 - REAR SHOCK DAMPER. Alteration Date Released. New Pieces. Replaced Pieces. Remarks. 3007 F.s/s. 2.2.39. FB.4595/6 Main Lever. FB.4597 Connecting Link. FB.3049 Silent Bloc Damper Rear…
| |
|
scan0460 |
Alteration notice detailing new and replaced pieces for the Front Shock Damper.
| |
|
View original record |
SECTION 7160 - FRONT SHOCK DAMPER. Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. ---|---|---|--- 3078 F. s/s. 4.4.39. | FB.4850 D.O. Top Cover Damper Casing. | FB.4720 DC. |…
| |
|
scan0461 |
Parts alteration notice for a front stabiliser, detailing new and replaced components.
| |
|
View original record |
SECTION 7166 - FRONT STABILISER. Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. Row 1: Alteration Date Released: 3034 F. s/s. 27.2.39. New Pieces: FB.4743 Stud, Cushioning…
| |
|
scan0462 |
Alteration list for the Side Spare Wheel Carrier, section 7430.
| |
|
View original record |
SECTION 7430 - SIDE SPARE WHEEL CARRIER. Alteration Date Released. | New Pieces. | Replaced Pieces. | Remarks. BY/HEB.2/WB. 26.4.39. The following parts held up :- FB.3982 Side Stay Support Tube.…
| |
|
scan0463 |
L.O.P. (List of Parts) Index for the Bentley V model.
| |
|
View original record |
DISTRIBUTION LIST A ROLLS-ROYCE, LTD. STANDARDS Date. 15.5.39. 17 MAY 1939 L.O.P. INDEX. - BENTLEY V DERBY ML. 788. | NOTES | TITLE OF SECTION. | SECTION No. | EXP.PROD. 50 SETS | PROD. 250 SETS | 50…
| |
|
scan0464 |
Suggesting an increase in material order quantities to cover all possible contingencies.
| |
|
View original record |
1200. To HPS, from Rm. c. HPS/RH. Rm.10/MH.14.3.40. In view of the increasing difficulty in obtaining supplies of material, we suggest that as far as possible quantities should be increased to cover…
| |
|
scan0465 |
Difficulty in obtaining materials for chassis experimental work and the process for obtaining a government license.
| |
|
View original record |
[Handwritten] Hs file Hs file [Struck through] Rm [Struck through] Please see me [Struck through] 1200 Hs [Struck through] [Typed] To Hs. from Rm. Rm.9/MH.14.3.40. MATERIAL FOR CHASSIS EXPERIMENTAL…
| |
|
scan0466 |
Letter from Accles & Pollock Ltd. regarding order No. 17572, which is on hold pending an exemption or license number under the Iron and Steel Control Order.
| |
|
View original record |
COPY. ACCLES & POLLOCK LTD., OLDBURY, BIRMINGHAM. Messrs. Rolls-Royce Ltd., Nightingale Road, Derby. 7th. March, 1940. [STAMP: RECEIVED 29 MAR 1940] Dear Sirs, We would refer you to our letter of the…
| |
|
scan0467 |
Cover memo forwarding communications from Professor J.M. Lessells of M.I.T.
| |
|
View original record |
To:- E.,Bn.,Rm.,Dor.,Hl. Lr/SGH.,Lr/Psn. 1250 E/TGD.1/MLH.14.3.40 MATERIAL FILE Herewith for your information and retention copy of recent communications from Prof. J.M.Lessells of M.I.T. E/TGD…
| |
|
scan0468 |
Paper on the use of brittle lacquers as an experimental method for stress and strain distribution analysis.
| |
|
View original record |
BRITTLE LACQUERS AS AN AID TO STRESS ANALYSIS by A. V. de Forest and Greer Ellis Abstract The fracturing of brittle coatings has long been recognized as an experimental method of checking strain…
| |
|
scan0469 |
Technical paper discussing the history and properties of brittle coatings for strain analysis.
| |
|
View original record |
2 approximate this ideal in several ways. While they cannot approach the accuracy of other mechanical gages they can furnish a very useful preliminary survey which need only be checked at a few…
| |
|
scan0470 |
The properties and application of brittle coatings for stress analysis.
| |
|
View original record |
3 and used the next day. The brittle coatings produced are to a practical degree uniformly brittle within the thickness range of three to eight-thousandths of an inch. Under normal conditions of use,…
| |
|
scan0471 |
Page explaining the methodology for using brittle coatings in strain analysis.
| |
|
View original record |
4 After being painted, the coating should not be subjected during drying to a sudden temperature variation of more than 5° F. nor a slowly acting change of more than 10° F. During testing, temperature…
| |
|
scan0472 |
Guide on the painting of brittle lacquers and illustrations of their use in strain analysis.
| |
|
View original record |
5 gages are desired, the qualitative picture of areas and directions of principal strains provides a most excellent aid in the placing of the gages. Painting of Brittle Lacquers. All the apparatus we…
| |
|
scan0473 |
Page from a report on strain distribution analysis, referencing Luder's lines and the use of brittle lacquers.
| |
|
View original record |
6 The preformed lap joint has much less strain and that which it has is distributed up onto the weld instead of being confined to the plate at the weld junction. Plain and corrugated sections of .050…
| |
|
scan0474 |
Illustrations of the Brittle Lacquer Apparatus and a Calibration Strip in a Calibrator.
| |
|
View original record |
Figure 1. - Brittle Lacquer Apparatus Figure 2. - Calibration Strip Under Load in Calibrator
| |
|
scan0475 |
Photographic analysis of stress concentration on a plate with a hole under increasing tensile loads.
| |
|
View original record |
11 .0010 9 8 7 6 .0005 4 W.P. a. b. c. d. e. a. Calibration strip in scale which is marked in inches per inch strain. b. Plate with hole; 5000 lb.load. c. Plate with hole; 9000 lb.load. d. Plate with…
| |
|
scan0476 |
Photographs illustrating the effects of torsion on a round bar and tension on lap welds.
| |
|
View original record |
Figure 4. - Round Bar in Torsion Figure 5. - Lap Welds in Tension
| |
|
scan0477 |
Photographs illustrating compression tests on thin plates and Lüder's lines from a Brinell test on soft steel.
| |
|
View original record |
Figure 6. - Plain and Corrugated Thin Plate Sections With Hole, Loaded Vertically in Compression Figure 7. - Luder's Lines Pattern Around a Brinell Impression in Soft Steel
| |
|
scan0478 |
Use of material purchased for chassis for aviation work.
| |
|
View original record |
1280 Les. Rm.2/ML.28.3.40. With reference to the attached note, .it appears it would be fortunate if we had to use a little of the material which we are buying for chassis, for aviation work as that…
| |
|
scan0479 |
The difficulty in obtaining materials for experimental chassis due to licensing requirements and lack of a government contract.
| |
|
View original record |
1200 To Rm. c. to Hs. c. to Sg. Les.1/B.30.3.40. MATERIAL FOR EXPERIMENTAL CHASSIS We should like to warn you that we are now finding it impossible to obtain certain chassis material which has been…
| |
|
scan0480 |
Request for an opinion on American steel recommendations for various chassis components.
| |
|
View original record |
1200 Rm/HH/Jenkinson. Rm.6/ML.2.4.40. MATERIALS. We have some recommendations from America with regard to materials used for various components of the chassis. We should like to have your opinion as…
| |
|
scan0481 |
Tempering graph for Vibrac Steel V.30 showing the effect of reheating temperature on its mechanical properties.
| |
|
View original record |
TEMPERING GRAPH OF VIBRAC STEEL V. 30 DIA. OF BAR: 1" HARDENING TEMPERATURE: 830°C QUENCHING MEDIUM: OIL COOLED, AFTER TEMPERING IN AIR. TONS PER SQUARE INCH - PERCENTAGES - FOOT- POUNDS - BRINELL IN…
| |
|
scan0482 |
Tempering graph for Vibrac Steel V.45 showing properties at different reheating temperatures.
| |
|
View original record |
TEMPERING GRAPH OF VIBRAC STEEL V.45 Material File DIA. OF BAR: 1" HARDENING TEMPERATURE 830°C. QUENCHING MEDIUM: OIL COOLED, AFTER TEMPERING IN AIR. Y-AXIS: TONS PER SQUARE INCH - PERCENTAGES - FOOT…
| |
|
scan0483 |
Forwarding of a report and a letter in reply to three points.
| |
|
View original record |
ask ML By/EM. ? 4 file Rm.2/ML.4.3.40. I don't know whether Llewellyn Smith sent you a copy of this Report, but in case he did not I attach it herewith. Pleas return it when you have finished with it.…
| |
|
scan0484 |
Announcing a staff transfer and a new appointment in the Material Progress Department.
| |
|
View original record |
Rm All Officials & Superintendents. Sft.2/BH.27.8.40. MATERIAL PROGRESS DEPT. Please note that Mr. Leslie (Sft/Les) has now been transferred to Crewe, and Mr. Wallis (Sft/AW) has been appointed Chief…
| |
|
scan0485 |
Specification list of deep drawing auto-body steel sheets required for a project named 'MYTH'.
| |
|
View original record |
STEEL REQUIRED FOR MYTH. Deep drawing Auto-Body Sheet. Ch. Material 2 Sheet 72 x 48 x .048 (Heelplate Hinge Reinf: Trunk Reinf: etc.,) 4 " 72 x 48 x .040 (Underframe, Crossmember, Monopiece, Door…
| |
|
scan0486 |
Stock list of chassis material sheets of various thicknesses available in the stores.
| |
|
View original record |
FOR OUR INFORMATION. CHASSIS MATERIAL IN THE STORES. 1 Sheet of .040 } 1 " " .039 } 4 sheets of .040" 2 " " .038 } 1 " " .037 } 2 sheets of .036" 1 " " .036 } 1 " " .032 } 3 " " .031 } 9 sheets of…
| |
|
scan0487 |
Responsibility and access to the Chassis Material Stores for Experimental cars.
| |
|
View original record |
Rm/RH. from Rm. c. Rm/Wym. CHASSIS MATERIAL STORES. Further to our conversation on this subject, it is agreed that in order to maintain continuity of control and records, Claud Parr shall continue to…
| |
|
scan0488 |
The reorganisation of car material stores, appointing a new storekeeper and transferring responsibility for records.
| |
|
View original record |
Rm/RH. from Rm. c. Rm/TFF. c. Rm/Wym. 200 Rm.18/ML.4.10.40. CAR MATERIAL STORES. Further to our Memo. Rm.4/ML.11.9.40. on this subject. We have now ascertained that the records of parts that are in…
| |
|
scan0489 |
Confirming authorisation for Auto Body Sheet and requesting a requisition for required sizes and quantities.
| |
|
View original record |
Rm/RL. To Rm. Dealt with Rm Materials (Chassis) Roy/AES.3/MH.31.10.40. We have now received an authorisation from the Society of Motor Manufacturers and Traders Ltd. releasing a further 10cwts. of…
| |
|
scan0490 |
List of materials required to construct one car body for the model 'MYTH'.
| |
|
View original record |
Rm/EAG. 2.11.40. M Y T H. ---------- Material required to construct one body, including the following items:- Body complete, Wings, Bonnet and Radiator Shell: 7 Sheets 72 x 48 x .036 9 " 72 x 48 x…
| |
|
scan0491 |
Material request for various sizes of deep drawing auto-body steel sheet for the 'MYTH' project.
| |
|
View original record |
Roy/AES. from Rm. Action Material Gen Rm.9/ML.1.11.40. Will you please obtain, for use in the Experimental Department, the following material :- STEEL REQUIRED FOR MYTH. (Deep drawing Auto-body…
| |
|
scan0492 |
Programme to tidy up the Chassis Material Stores, assigning personnel to specific dates.
| |
|
View original record |
1200 Rm/Wym. from Rm. material gen Rm.2/HL.5.11.40. CHASSIS MATERIAL STORES. It has been agreed that the following programme will be put in hand in order to get the Stores tidied up within a…
| |
|
scan0493 |
Tables detailing the mechanical properties of Aluminium-Magnesium and Magnesium alloys.
| |
|
View original record |
"METALS" by Sir Harold CARPENTER & J.M.ROBERTSON (Vol.II). 1200 Table 190 (561) page 1372. Mechanical Properties of Annealed Sheets of Aluminium-Magnesium Alloys | Magnesium per cent. | Yield-point…
| |
|
scan0494 |
Tables of mechanical properties for Magnesium and Aluminium-Magnesium alloys after various heat treatments.
| |
|
View original record |
Table 240 - page 1441. (Magnesium). Property. | Hot-rolled | Annealed 350° C. Tensile strength, tons per sq.in. | 15.7 | 14.3 Elongation per cent. on 2 in. | 12.5 | 7.0 Reduction in area per cent. |…
| |
|
scan0495 |
Pre-war chassis material commitments, for discussion at the next chassis conference.
| |
|
View original record |
To Rm. from Sg. Handwritten: Material file (1200 ?) Sg.4/KW.15.3.41. Handwritten: Next Chassis Conference Handwritten: 1200 re Chassis You will remember that when we had a recent Chassis Meeting the…
| |
|
scan0496 |
Letter from Reinforced Plastics Ltd. proposing the use of patented wire-cotton fabric for motor car construction, including test results from the R.A.E.
| |
|
View original record |
REINFORCED PLASTICS LTD. Handwritten notes: Rm, #1, Car files, 1200, 2/? TELEPHONE. KINGSTON 4603 DIRECTORS: SIR WM. YARWORTH-JONES (CHAIRMAN & MANAGING) SIR HERBERT A. WALKER, C.B GLENCOE, QUEENS…
| |
|
scan0497 |
Results of tests on experimental plastic boards made from interwoven steel wire and cotton fabric.
| |
|
View original record |
Results of some tests of experimental plastic boards made from the interwoven steel wire and cotton fabric supplied. Thickness 0.088" Thickness 0.120" ============ Three series of experiments were…
| |
|
scan0498 |
Requesting a copy of a paper concerning metal adhesives for Mr. Robotham.
| |
|
View original record |
To: Lov/O'D. from Rm/h. Rm. 2/h. 7.2.44. 1200 METAL ADHESIVES. Mr. Robotham would like a copy of the paper referred to in your Lov/O'D. 10/MM. 21.1.44. and I should be glad if you could obtain this…
| |
|
scan0499 |
Confidential memo regarding the S.M.M.T. committee's work on post-war steel specifications.
| |
|
View original record |
Rm. c, M/LS. c, Psn. c, EM/Les. c, Hs. Enclosure by 1200 borrowed fah EM.10/DJ.14.2.44. S.M.M.T. POST-WAR STEELS - CONFIDENTIAL. As you may be aware, about the middle of last year I was appointed a…
| |
|
scan0500 |
Cover page for a list of post-war steels compiled by the S.M.M.T. Technical Sub-committee for Metals.
| |
|
View original record |
S.M.M.T. List of Post-War Steels compiled for revision by The Technical Sub-committee (Metals)
| |
|
scan0501 |
Letter of appreciation to Sir Arthur Winder for the supply of Silico Manganese Steel Bar.
| |
|
View original record |
1200 Rm. 4/h. 23rd February, 1944. Dear Sir Arthur, I am very much indebted to you for your letter of the 17th February, and for your offer to supply us with the Silico Manganese Steel Bar. A separate…
| |
|
scan0502 |
Letter to High Duty Alloys seeking collaboration on making Duralumin forgings for prototype motor-cars.
| |
|
View original record |
1200 Rm. 13/h. 28th February, 1944. Dear Devereux, We have got permission from the Board of Trade to build a few prototype motor-cars, and with the possibility of taxation by weight, in the…
| |
|
scan0503 |
Letter from English Steel Corporation confirming the forging and delivery of Silico Manganese Steel Bar.
| |
|
View original record |
TELEGRAMS: STEELCORPO, SHEFFIELD. TELEPHONE 41071. EXTENSION LONDON OFFICE: VICKERS HOUSE, BROADWAY, WESTMINSTER, S.W.1. TELE:- ABBEY 7777. ENGLISH STEEL CORPORATION LTD, (Registered Office) VICKERS…
| |
|
scan0504 |
Confidential memo discussing the sourcing of steel supplies for prototypes.
| |
|
View original record |
CONFIDENTIAL. To...Wym from Ev/RG. c...Rm. 1200 Ev/RG.6.JMA. 21.1.44 Steel Supplies for Prototypes. I have had a talk to P.S.Co., concerning the above. Their main source of supply is Lysaght's in…
| |
|
scan0505 |
Letter confirming a telephone discussion about a steel specification and requesting delivery.
| |
|
View original record |
1200 Confidential. 21st January, 1944. Rm. 6/h. Dear Herewith a copy of the specification of the steel which we require, and which I discussed with you on the telephone. We should naturally like…
| |
|
scan0506 |
List of steel sheet quantities and specifications with definitions for abbreviations.
| |
|
View original record |
Rm. 6/h. 21.1.44 STEEL - QUANTITIES AND SPECIFICATION. 50 sheets 72 x 48. N.A.B.O. 20 S.W.G. (.036) 80 sheets 72 x 48. N.A.B.O. 21 S.W.G. (.032) 10 sheets 72 x 48. N.A.B.O. 22 S.W.G. (.028) Note:…
| |
|
scan0507 |
Specification sheet detailing quantities and types of steel sheets with explanatory notes.
| |
|
View original record |
1200 Rm. 6/h. 21.1.44 STEEL - QUANTITIES AND SPECIFICATION. 50 sheets 72 x 48. N.A.B.O. 20 S.W.G. (.036) 80 sheets 72 x 48. N.A.B.O. 21 S.W.G. (.032) 10 sheets 72 x 48. N.A.B.O. 22 S.W.G. (.028) Note:…
| |
|
scan0508 |
Confidential notice outlining the wartime procedure for issuing sub-authorisations for iron and steel.
| |
|
View original record |
1265D. COPY. Confidential. THE ISSUE OF SUB-AUTHORISATIONS FOR IRON AND STEEL. Under the present regulations, the holder of an authorisation to acquire Iron and Steel who wishes to delegate a part of…
| |
|
scan0509 |
Authorization form for the acquisition of iron and steel under the Control of Iron & Steel Distribution Scheme.
| |
|
View original record |
COPY. Confidential. 1200 CONTROL OF IRON & STEEL - DISTRIBUTION SCHEME. Name ROLLS-ROYCE Address DERBY is hereby authorised to quote: Department Symbol B.T.2. Department Authorisation Number…
| |
|
scan0510 |
Confidential notice on the procedure for issuing sub-authorisations for iron and steel.
| |
|
View original record |
12050 COPY. Confidential. THE ISSUE OF SUB-AUTHORISATIONS FOR IRON AND STEEL. Under the present regulations, the holder of an authorisation to acquire Iron and Steel who wishes to delegate a part of…
| |
| | | |