Design and standardization of metal floorboards for a Bentley chassis.
| Identifier | ExFiles\Box 136\5\ scan0088 | |
| Date | 25th May 1934 | |
| X819 To Hs {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer} from E. {Mr Elliott - Chief Engineer} c. Wor. {Arthur Wormald - General Works Manager} EV. {Ivan Evernden - coachwork} E.3/HP.25.5.34. Metal Floorboards. Replying to your memo HS {Lord Ernest Hives - Chair} /Rm. {William Robotham - Chief Engineer} 3/KW.25.5.34 we originally envisaged the particular point you raise with regard to the coachbuilding side, and we made the pressed floorboards to a fixed length which will suit any kind of body that is likely to be made for a Bentley chassis, the space between the ends of the floorboards and the body outline being filled by the body sills. As a matter of fact we have already been over this same point with EV {Ivan Evernden - coachwork} and made an alteration to the plan outline of these boards at EV {Ivan Evernden - coachwork} 's suggestion to suit all types of body work, and so far as we are aware the detail drawings have been altered. Subject to EV {Ivan Evernden - coachwork} 's confirmation I think the standardisation sheet can be issued. E. {Mr Elliott - Chief Engineer} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
