Status of various schemes for the B.60 engine installation in the W.111 chassis.
| Identifier | ExFiles\Box 123\5\ scan0203 | |
| Date | 28th November 1938 | |
| Rm. {William Robotham - Chief Engineer} Rm {William Robotham - Chief Engineer} /Swdl {Len H. Swindell} BY {R.W. Bailey - Chief Engineer} /NS. {Norman Scott} 8/G.28.11.38. B.60 ENGINE IN W.111 CHASSIS. The following indicates the position of the schemes issued in connection with B.60 Engine in W.111 chassis :- E.CD.1032 Additional Front Crossmember, complete. BY {R.W. Bailey - Chief Engineer} /CS.1/E.25.11.38. E.CD.1008 Engine Controls, complete. BY {R.W. Bailey - Chief Engineer} /CS.2/E.11.11.38. F.CD.1015 Engine Mounting, Fan, etc. BY {R.W. Bailey - Chief Engineer} /CS.1/E.17.11.38. E.CD.1018 Top Water Pipe, complete. BY {R.W. Bailey - Chief Engineer} /CS.1/E.22.11.38. E.CD.1021 Exh.Downtake Pipe,complete. BY {R.W. Bailey - Chief Engineer} /CS.2/E.24.11.38. E.CD.1025 Air Silencer, complete. BY {R.W. Bailey - Chief Engineer} /CS.5/E.25.11.38. G.CD.1019 Clutch Actuation. This scheme has been detailed but not issued, as it is superseded by G.CD.1034, details for which are at present in hand, and will be finished by Thursday. BY {R.W. Bailey - Chief Engineer} /NS. {Norman Scott} NS {Norman Scott} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
