Rolls-Royce Archives
         « Prev  Box Series  Next »        

Casting programme and progress report for the B.60 Crankcase.


Identifier  ExFiles\Box 123\5\  scan0169
Date  17th November 1938
  
Rm. {William Robotham - Chief Engineer}
1044
RHC {R. H. Coverley - Production Engineer} /Vs. {J. Vickers} 7/JT.17.11.38.

Iron Foundry.

Herewith copy of casting programme for B.60 Crankcase :-

B.60.
Pattern received Aug. 9th. (4.p.m.)

(Proof cast Aug.11th. Delivered to works Aug.12th. (2 p.m.)
(Pattern returned to Pattern Shop for correction to proof
EB. (and returned to foundry Aug.18th. (1.30 p.m.)
3778 (
(No. 1. cast Aug.22nd. Cut through on timing end core.
(Core box modified and returned to foundry Aug. 24th.
(No. 2. cast Aug.24th. Delivered to works Aug.25 (3 p.m.)

Pattern returned to Pattern Shop for alteration to EB.4139 and returned to foundry Sept.10th.

EB. (No. 3. cast Sept.13th. Delivered to works Sept.14th (3 p.m.)
4139 (No. 4. " " 15th. " " 17th.
(No. 5. " " 17th. " " 20th.
(No. 6. " " 21st. " " 23rd.
(No. 7. " " 22nd. " " 27th.
(No. 8. " " 23rd. " " 27th.

Pattern returned to Pattern Shop Sept. 27th. for alteration to B.80

------------------

B.80.
Pattern received Saturday Nov. 5th. (1.30 p.m.)

Jhekuis
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙