From Sg. to Rm. regarding a misunderstanding and frustration over the agreed testing schedule for Continental Tests at Chateauroux.


Identifier  ExFiles\Box 83\2\  scan0212
Date  4th February 1938
  
To Rm. {William Robotham - Chief Engineer} from Sg. {Arthur F. Sidgreaves - MD} re Continental Tests
Sg {Arthur F. Sidgreaves - MD} 16/E4.2.38

Policy?

I am in receipt of your Rm {William Robotham - Chief Engineer} 3/R2.2.38 but I am afraid I cannot understand it because you refer to running Mx {John H Maddocks - Chief Proving Officer} 's recommended schedule when the car has completed 10,000 miles at Chateauroux(French test region).

As the result of discussions back in November Mx. {John H Maddocks - Chief Proving Officer} was asked to put up his recommendations, which he did in Mx {John H Maddocks - Chief Proving Officer} 12/N.6.1.38 of which you had a copy.

A reference to this shows quite clearly that it was not the idea to run 10,000 miles at Chateauroux(French test region) and then start something different.

I need not indicate what it does say because it would only be repeating the memo. but is really the opposite of what you seem to have in mind.

I have felt for years, as I think you know, that the normal Chateauroux(French test region) testing, whereby the cars are driven at speed round and round a circuit was wrong and did not produce the best results from a testing point of view and I am distressed to find that, after having ventilated - and got it agreed that the whole scheme should be revised, no notice has been taken of it.

Sg. {Arthur F. Sidgreaves - MD}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙