Cost-saving modification to the tappet block and clamp for the Phantom III.
| Identifier | ExFiles\Box 96\2\ scan0220 | |
| Date | 22th April 1937 | |
| To Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls} from HPS. {Horace Percy Smith - Experimental Factory Mgr} 354. HPS. {Horace Percy Smith - Experimental Factory Mgr} 7/VS. {J. Vickers} 22.4.37. MODIFIED TAPPET BLOCK AND CLAMP LeC.5371. We have discussed with RHC {R. H. Coverley - Production Engineer} /Cy. the question of cost regarding the above, and give below for your perusal his remarks. "We have looked into this job and find that a saving of 15/-d per chassis can be effected by die casting and reducing the number of parts. We have also discussed with E {Mr Elliott - Chief Engineer} /JNR. {Charles L. Jenner} the shape of the clamp, who has agreed to a modification reducing the excessive clearance in the fork. The anti-rotation device, while costing slightly more to produce, will definitely cut out the adjusting by filing, which is now necessary. We therefore recommend the adoption of this scheme". A set of these tappet blocks is fitted to Phantom III No. 8. Unit. HPS. {Horace Percy Smith - Experimental Factory Mgr} | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
