From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Build schedule and handover of a Valve Gear Rig to the millwrights.
Identifier | ExFiles\Box 133\1\ scan0221 | |
Date | 25th May 1937 | |
To HPS.{Horace Percy Smith - Experimental Factory Mgr} C. to Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell} C. to E/PSN. 1129 Rm{William Robotham - Chief Engineer}/Ed.{J. L. Edwards}4/JH.25.5.37. Valve Gear Rig. We shall be ready to hand No.20. bed over to the millwrights for building up the above rig in about a weeks time. An engine unit B.14 is being allocated to the job, and should be ready less crankshaft cam rods and pistons by Tuesday morning. We should be glad therefore if you would have the rig assembled as far as possible, so that when the millwrights are ready for lining up there may be no unnecessary delay. Rm{William Robotham - Chief Engineer}/Ed.{J. L. Edwards} | ||