Standardisation report for the reverse pinion in the gearbox.

Identifier  ExFiles\Box 66\4\  scan0169
Date  25th September 1924
  
RR 755 (10H) (SL391 2-11-23) MP 281297
STANDARDISATION of CHASSIS PARTS.
COMPLETED 17.10.24.
Date 25.9.24.
Description of Parts. REVERSE PINION IN GEARBOX.
Origin. To enable gear to be ground at the Works.
Experimental Test Report.
This modification was got out in order that reverse pinions could be ground on the Less Bradner Gear Grinder at the Works. The bush has also been modified to prevent seizure.
Road Test Report.
Run 10,000 miles in France on 9-PK.
Run 3200 miles on 93-NK.
Car has been run full power on reverse for a considerable distance - No troubles.
X No. 3322
Drawing No.
Part List
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis
Cost of Parts in Works which will be scrapped if commenced on:-
Series............£.........
Series............£.........
Series............£.........
Weight of Old Part.
Cost of Old Part. £ 1. 12. 6
Weight of New Part.
Cost of New Part. £ 1. 12. 0
Difference per Car.
Difference per Car. £ 6d. saving.
Signature of Mr. De LOOZE that above is correct. My/Rns. 29.9.24.
SIGNATURES
DATE
REMARKS
MR. JOHNSON
14.X.24
agreed b johnson
MR. B. JOHNSON
14.X.24
agreed
MR. ROYCE
9.10.24
Agreed. FHR.
MR. WORMALD
25.9.24
Agreed. Wor. {Arthur Wormald - General Works Manager}
MR. ROWLEDGE
26.9.24
Agreed. Rg. {Mr Rowledge}
MR. DAY
30.9.24
Agreed. Da. {Bernard Day - Chassis Design}
MR. BAILEY
26.9.24
Agreed. BY. {R.W. Bailey - Chief Engineer}
MR. PLATFORD
26.9.24
Agreed. EP. {G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT
9.10.24
Agreed. E. {Mr Elliott - Chief Engineer}
MR. NORTHEY
26.9.24
Agreed. PN. {Mr Northey}
MR. HIVES
13.10.24
Agreed. E. {Mr Elliott - Chief Engineer} Hives
STAMPS:
CLASSIFIED
M. {Mr Moon / Mr Moore} OCT 14 1924
RECEIVED
  
  