From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation proposal for an improved design of ignition coil for chassis parts.
Identifier | ExFiles\Box 172\3\ img118 | |
Date | 4th April 1930 | |
RR 785 REVISED (10M) (D.C. 777 - 29 - 2 - 28) MC C.L.TD ORIGINAL COMPLETED 2.5.30 STANDARDISATION of CHASSIS PARTS. Date 4.4.30 No. 8712 Drawing No. Part List Description of Parts. Ignition Coil of Improved design. (See attached sheet) Origin. To facilitate manufacture and improve reliability and efficiency of coil. Experimental Test Report. Three coils of this type have satisfactorily passed through our schedule of ignition coil intensive bench tests, which we consider to take the place of a 10,000 mile test in a chassis, which latter test has proved to be an unreliable test in the case of ignition coils. Road Test Report. Run 12,000 miles on 14-G4 in France. Also fitted to 23-EK run 1,000 miles. A Scrap and replace at all costs, including Chassis already delivered to Customers. B Scrap and replace on Chassis in Works. C Scrap present stock and replace on all Chassis not yet handed to test. D Use existing stock Alteration effective on future Chassis. Weight of Old Part. Weight of New Part. Difference per Car. Cost of Old Part. £ 1. 1. 7. Cost of New Part. £ 1. 1. 2. Agreed Wor.{Arthur Wormald - General Works Manager} Difference per Car. £ - . 5. Saving. Cost of Parts in Works which will be scrapped if commenced on :- Series...........£......... Series...........£......... Series...........£......... Signature from Cost Dept. that above is correct. G/Rb.{R. Bowen} 29.4.30 G.I. 5.30 INITIAL | DATE | REMARKS BJ. Sg.{Arthur F. Sidgreaves - MD} | 2.5.30 | Agreed Sg.{Arthur F. Sidgreaves - MD} R.{Sir Henry Royce} | April 29th | p.p. R.{Sir Henry Royce} Rg.{Mr Rowledge} By E & HS{Lord Ernest Hives - Chair} absent in France WOR.{Arthur Wormald - General Works Manager} | 1.4.30 | Agreed Wor.{Arthur Wormald - General Works Manager} RG.{Mr Rowledge} | 3.4.30 | Agreed Rg.{Mr Rowledge} DA.{Bernard Day - Chassis Design} | 4.4.30 | Agreed Da.{Bernard Day - Chassis Design} BY.{R.W. Bailey - Chief Engineer} | 7.4.30 | Agreed By.{R.W. Bailey - Chief Engineer} EP.{G. Eric Platford - Chief Quality Engineer} | 7.4.30 | Agreed EP.{G. Eric Platford - Chief Quality Engineer} E.{Mr Elliott - Chief Engineer} | 4.4.30 | Agreed Elliott. PN.{Mr Northey} | 7.4.30 | Agreed PN.{Mr Northey} CWB. | 7.4.30 | Agreed C. HS.{Lord Ernest Hives - Chair} | | Agreed. [Green Stamp Text] PHANTOM 20. H.P. CHASSIS | ||