Modifications to a new 20 HP chassis and a potential delay with the bodywork.
Identifier | ExFiles\Box 5\2\ 02-page169 | |
Date | 7th July 1928 | |
X5830 To R.{Sir Henry Royce} from Hs.{Lord Ernest Hives - Chair} c. to BJ. Wor.{Arthur Wormald - General Works Manager} c. to E.{Mr Elliott - Chief Engineer} DA.{Bernard Day - Chassis Design} c. to BY.{R.W. Bailey - Chief Engineer} DA{Bernard Day - Chassis Design}/EV.{Ivan Evernden - coachwork} HeS/LG17. 7. 28. X5350 X5770 20 HP. CAR - 12-G-4. We have had the new 20 HP. chassis on the road today which has a new frame - fitted with a X member, new petrol tank, smaller wheels, narrower hubs, modified engine suspension, stiffer crankshaft, tubular connecting rods etc. etc. We are also busy fitting the wings and valences as far as possible. We sincerely hope there will be no delay with the body because a special effort has been made at Derby to complete this chassis in time for your holiday. Although the body was promised for July the 20th. we now hear it is not likely to be ready. Hs.{Lord Ernest Hives - Chair} | ||