Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Potential trouble with the 4-port pipe system on the 20/25 model, requesting an investigation into sliding joints.

Identifier  ExFiles\Box 102\1\  scan0362
Date  9th July 1935
  
X508

To RHC.{R. H. Coverley - Production Engineer}

Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer}18/KW.9.7.35.

We anticipate that we may have trouble with the existing pipe on the 4-port system on the 20/25. We should like you to look into the question of getting sliding joints on the main branches as indicated in LeC.2896/7, as these were quite successful on the 20/25 and Phantom. Actually the Invar rod was not found to be necessary.

Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer}
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙