From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Financial breakdown of capital expenditure and cost per annum for buildings and machinery.

Identifier  ExFiles\Box 76\2\  scan0029
Date  13th December 1912
  
A (100H) (PP 289. 13.12.12) G 4057

COPY.
(4)

Cap. Expd. Cost Per Annum

Building.
2½% depreciation £2500--0--0 £ 62-10--0
6% interest 150--0--0

Machinery.
Engines & Dynamos £9150--0--0
Switchboards 450--0--0
Oil Storage Tank 400--0--0
Water Cooling } 400--0--0
Tower }
Overhead Cranes 200--0--0
Connecting Piping 100--0--0
Cables 150--0--0
Lighting 25--0--0
£10875--0--0

10% depreciation 1087-10--0
6% interest 652-10--0

Labour 190--0--0
Fuel at 40/- per ton 700--0--0
Lubricating Oil 162--0--0
Insurance at 5/- per cent 33--0--0

£13375--0--0 £3037-10--0

To the above should be added the cost for taking over our
present motors, which would be, approximately,
£1600--0--0.

The cost of electricity for 12 months ending
December 1911 was £2868--0--0.

In comparing the above figures it should be noticed
that the depreciation on the buildings and machinery
  
  