Financial breakdown of capital expenditure and cost per annum for buildings and machinery.
Identifier | ExFiles\Box 76\2\ scan0029 | |
Date | 13th December 1912 | |
A (100H) (PP 289. 13.12.12) G 4057 COPY. (4) Cap. Expd. Cost Per Annum Building. 2½% depreciation £2500--0--0 £ 62-10--0 6% interest 150--0--0 Machinery. Engines & Dynamos £9150--0--0 Switchboards 450--0--0 Oil Storage Tank 400--0--0 Water Cooling } 400--0--0 Tower } Overhead Cranes 200--0--0 Connecting Piping 100--0--0 Cables 150--0--0 Lighting 25--0--0 £10875--0--0 10% depreciation 1087-10--0 6% interest 652-10--0 Labour 190--0--0 Fuel at 40/- per ton 700--0--0 Lubricating Oil 162--0--0 Insurance at 5/- per cent 33--0--0 £13375--0--0 £3037-10--0 To the above should be added the cost for taking over our present motors, which would be, approximately, £1600--0--0. The cost of electricity for 12 months ending December 1911 was £2868--0--0. In comparing the above figures it should be noticed that the depreciation on the buildings and machinery | ||