Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Standardisation of the K.S. petrol gauge with an improved glass tube seal for chassis parts.

Identifier  ExFiles\Box 61\3\  scan0060
Date  30th April 1930
  
RR 755 REVISED (10H) (DG 348 19-7-29) SM. 6/643. COMPLETED 27.6.30. X4038.
STANDARDISATION of CHASSIS PARTS.
Date 30.4.30.
Description of Parts. K.S. PETROL GAUGE WITH IMPROVED GLASS TUBE SEAL.
Origin. To obviate present troubles.
Drawing No. X No.4038
Part List

Experimental Test Report.
This modification consists of directly fusing the brass air line into the glass tube and using a gland at the top of the tube.

Road Test Report.
Run 10,000 miles on 14-G4. Recommend that this should be adopted as soon as possible for 20 HP. and 40/50.

A Scrap and replace at all costs, including Chassis already delivered to Customers.
B Scrap and replace on Chassis in Works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.

Weight of Old Part.
Weight of New Part.
Difference per Car.
Cost of Old Part. £
Cost of New Part. £
Difference per Car. £ None
Signature from Cost Dept. that above is correct. GHR 29/5/30. Agreed W... 1/5/30.

Cost of Parts in Works which will be scrapped if commenced on:-
Series.........£.......
Series.........£.......
Series.........£.......

INITIAL | DATE | REMARKS
B.I. Sg.{Arthur F. Sidgreaves - MD} | 16-6-30 | Agreed Sg.{Arthur F. Sidgreaves - MD}
R.{Sir Henry Royce} | 27.5.30 | Agreed FHR.
WOR.{Arthur Wormald - General Works Manager} | 1.5.30 | Agreed Wor.{Arthur Wormald - General Works Manager}
RG.{Mr Rowledge} | 7.5.30 | Agreed Rg.{Mr Rowledge}
DA.{Bernard Day - Chassis Design} | 2.5.30 | Agreed Da.{Bernard Day - Chassis Design}
BY.{R.W. Bailey - Chief Engineer} | 1.5.30 | Agreed BY.{R.W. Bailey - Chief Engineer}
EP.{G. Eric Platford - Chief Quality Engineer} | 1.5.30 | Agreed EP.{G. Eric Platford - Chief Quality Engineer}
E.{Mr Elliott - Chief Engineer} | 27.5.30 | Agreed AE.
PN.{Mr Northey} | 6.5.30 | Agreed PN.{Mr Northey}
CWB. | 1.5.30 | Agreed C.
HS.{Lord Ernest Hives - Chair} | | Agreed.

[STAMP: Received]
[WATERMARK: ON 20/23 H.P. GLASS]
[STAMP: 31]
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙