Rolls-Royce Archives
         « Prev  Box Series  Next »        

Establishing the official procedure for introducing modifications to the Wraith model using standardisation sheets.


Identifier  ExFiles\Box 108\2\  scan0148
Date  6th September 1938
  
RHC {R. H. Coverley - Production Engineer}
Rm. {William Robotham - Chief Engineer}
Dev.
BY {R.W. Bailey - Chief Engineer} /Mon
BY {R.W. Bailey - Chief Engineer} /NS {Norman Scott}
600
BY.6/G.6.9.38.
Rm {William Robotham - Chief Engineer}
WRAITH.
INTRODUCTION OF MODIFICATIONS.
The position of Wraith development has reached the stage at which we must arrange for any further improvements to be introduced by the official method of chassis on production i.e. by the use of standardisation sheets.
In future for Wraith no changes on production must be made by any other procedure.
BY. {R.W. Bailey - Chief Engineer}
  
  
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).


Copyright Sustain 2026, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙