From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Estimate for the cost of extra equipment and bringing the D.2 series chassis into production.
| Identifier | ExFiles\Box 87\1\ scan0103 | |
| Date | 18th September 1934 | |
| STANDARDISATION OF PARTS [Reversed text] Est. cost of extra jigs, tools and equipment (Sft{Mr Swift}/WS.18.9.34) £59.0.0. Could be brought on to production (Sft{Mr Swift}/GH.18.9.34) at 1st chassis in D.2 series, without scrap. | ||
