Rolls-Royce Archives
         « Prev  Box Series  Next »        

From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Cost estimate for a spring-loaded axle control scheme on a Bentley.

Identifier  ExFiles\Box 85\1\  scan0126
Date  22th June 1936
  
Hs{Lord Ernest Hives - Chair}/RM.{William Robotham - Chief Engineer}
WOT.
x20b
Sft{Mr Swift}/WNW.1/DR.22.6.36.

SPRING LOADED AXLE CONTROL.
BENTLEY.
Scheme Drg. R.M.163.

In connection with the above we have, as requested, examined the scheme from a manufacturing point of view and find their will be a slight increase in cost over our present design.

We estimate this increase to be 2 1/2d. (without charges) per chassis. The reason for this is mainly due to the material change. The S/ZN Spindle and Bushes requiring additional machining operations above those required for the present S/N Spindle and Bronze Bushes.

We have assumed in our estimates for the new Spindle that machining only is required on the end bearings and on the stems for holding down.

An increase in the dia. of the long oil hole through the spindle portion would reduce the cost for this drilling operation.

Bentley Chassis. Sec. 7161.
YB.2604/12. RR.Sch.966.(Sh.1)
Issued Exactly:- Bx/Twp/S. 3.7.36.

Sft.{Mr Swift}

HP cWB
  
  


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙