From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Requesting clarification on the type of bearings and their fitment time for chassis B.8.GA.
Identifier | ExFiles\Box 146\1\ scan0057 | |
Date | 28th October 1937 | |
W/P. To Sr. from Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell} Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}3/MH.{M. Huckerby}28.10.37. CHASSIS B.8.GA. Re your memo VA.4/GM.20.10.37 giving details of main bearing wear and sinkage etc., we would like to know definitely which type of bearings these are, AC.2 or AC.7 ? You say, "We fitted a set of AC.2 main bearings and liners and 6 new connecting rods complete with AC.7 big ends". Do you mean that these were fitted when the engine was last dismantled in accordance with your memo Sr/VA.3/ET.7.6.37, or that you are going to fit them now ? We should like a reply as soon as possible. Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell} | ||