Instructions for the removal and replacement of equipment on test bed No. 2c.

Identifier  ExFiles\Box 143\1\  scan0194
Date  5th October 1936
  
To EJJ/JV.
X1209
Hs{Lord Ernest Hives - Chair}/Ed.{J. L. Edwards}24/KW.5.10.36.

No. 2c Bed.

It has been arranged that the above bed is to be taken over from Hs{Lord Ernest Hives - Chair}/Wd.{Mr Wood/Mr Whitehead} by Hs{Lord Ernest Hives - Chair}/Rm.{William Robotham - Chief Engineer} after any tackle required by him has been removed, and it is suggested that this be taken away first and stored wherever they require it.

A list of the stuff is as under :-

(1) Oil cooler complete.
(2) Cooling stand complete.
(3) Air flow rig complete.
(4) All superfluous pipes, etc.
(5) Thermometers and gauges.
(6) Petrol filter and 2-way cock.
(7) Blower, oil pump etc.

Items (5) & (6) are to be left in place until replacements are obtained.

The removal of the above tackle necessitates the following replacements.

I. Cooling System.

(a) A tank placed in the roof spilling into the funnel return to the plant, with steam and water connections as shown in the sketch.
(b) 1 pressure gauge 0 - 40 lbs/in.2.
(c) Two N. & Z. thermometers 40 - 160 °C.
  
  