Standardisation of material for valves on 40/50 HP and 20 HP chassis to increase life.

Identifier  ExFiles\Box 171\3\  img221
Date  30th October 1923
  
R.R. 755 (10M) (SL 72 18-7-23) MP 274954s.
ORIGINAL COMPLETED 28.11.23.
STANDARDISATION of CHASSIS PARTS. Date 30.10.23.
Description of Parts. 40/50 HP. AND 20 HP. CHASSIS. MATERIAL FOR VALVES.
Origin: To increase life.
Experimental Test Report.
Tests on aero engines have proved that Silchrome steel is a considerable improvement over our present steel.
Road Test Report.
Springfield have tested these valves on 40/50 HP. cars and find that they are an improvement. There is less wear with this material.
X No. 4226
Drawing No. 2764
Part List
A Scrap and replace at all costs, including Chassis already delivered to customers.
B Scrap and replace on Chassis in works.
C Scrap present stock and replace on all Chassis not yet handed to test.
D Use existing stock Alteration effective on future Chassis.
Weight of Old Part. £
Cost of Old Part. £
Weight of New Part. £
Cost of New Part. £
Difference per Car. £ No difference.
Cost of Parts in Works which will be scrapped if commenced on:-
Series.......... £ ..........
Series.......... £ ..........
Series.......... £ ..........
Signature of Mr. De LOOZE that above is correct. MY/JW 30.10.23.
SIGNATURES
DATE
REMARKS
MR. JOHNSON
27.11.23
Agreed. CJ.
MR. B. JOHNSON
27.11.23
Agreed. BJ. Presume no scrap.
MR. ROYCE
19/11/23
Agreed FHR I understand we have made tests which show decided improvement and that we are making further searching tests both in cars & on engines to prove that there is no other constituent in which the steel may fail, such as mechanical strength after repeated heating
MR. WORMALD
30.10.23
Agreed. Wor.{Arthur Wormald - General Works Manager}
MR. ROWLEDGE
30.10.23
Agreed. Re.
MR. DAY
1.11.23
agreed DA{Bernard Day - Chassis Design}
MR. BAILEY
30.10.23
Agreed. BY.{R.W. Bailey - Chief Engineer}
MR. PLATFORD
31.10.23
Agreed. EP.{G. Eric Platford - Chief Quality Engineer}
MR. ELLIOTT
3-11-23
Agreed AE
MR. NORTHEY
31.10.23
Agreed. Provided that Springfields tests in the absence of ours are sufficient. PN.{Mr Northey}
MR. HIVES
21.11.23
Agreed. E.{Mr Elliott - Chief Engineer} Hives.
  
  