Action points from a discussion on general car work, with a focus on the Phantom III model.
| Identifier | ExFiles\Box 174\3\ img110 | |
| Date | 11th November 1936 | |
| Rm {William Robotham - Chief Engineer} con To Rm {William Robotham - Chief Engineer} /Gry. {Shadwell Grylls} Rm {William Robotham - Chief Engineer} /FD. {Frank Dodd - Bodies} Rm {William Robotham - Chief Engineer} /Les. Rm {William Robotham - Chief Engineer} /Wym. {G. Harold Whyman - Experimental Manager} Rm {William Robotham - Chief Engineer} /Smth. Rm {William Robotham - Chief Engineer} /Mths. {Reg Matthews} Rm {William Robotham - Chief Engineer} /AFM. {Anthony F. Martindale} Rm {William Robotham - Chief Engineer} /Swdl. {Len H. Swindell} Rm {William Robotham - Chief Engineer} /FJH. {Fred J. Hardy - Chief Dev. Engineer} Rm {William Robotham - Chief Engineer} /CTS. {C. Trot Salt - Carburation} Rm {William Robotham - Chief Engineer} /Std. Rm {William Robotham - Chief Engineer} /GR. {George Ratcliffe} Rm {William Robotham - Chief Engineer} /Wst. Rm {William Robotham - Chief Engineer} /JBD. {John B. Dixon - Fuel Systems} Rm {William Robotham - Chief Engineer} 2/R.11.11.36. CAR WORK GENERALLY. With reference to the discussion held 9/11/36, the following points should be noted:- P.III. (1) Dodd will give me figures for oil consumption thick and thin oil - as soon as possible. (2) Martindale and Gry. {Shadwell Grylls} will decide whether the front roll rod can be fitted to the Continental P.III without impairing water excluders. (3) Ll.Smith will prepare a new clutch plate for Pass' car, and advise me when it is ready. (4) Les. {Ivan A. Leslie} and JBD. {John B. Dixon - Fuel Systems} will let me know what they propose to do to clear up the Arens Control on the P.III. (5) Les. {Ivan A. Leslie} to report what is to be done on frame noise and why no conclusions have been come to one way or the other. (6) Les. {Ivan A. Leslie} to report on the sideways shake on the P.III. (7) Std. to continue with tests to simplify the radiator top tank valve in conjunction with the 4 port cylinder head. (8) Swdl. {Len H. Swindell} to complete work on P.III engine on the test bed which includes:- (1) Optimum timing. (2) Large chokes. (3) Correct ignition advance curve. (4) Loss to manifolds. (5) Elimination of top water pipe. | ||
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
