Action points from a discussion on general car work, with a focus on the Phantom III model.

Identifier  ExFiles\Box 174\3\  img110
Date  11th November 1936
  
Rm{William Robotham - Chief Engineer} con

To Rm{William Robotham - Chief Engineer}/Gry.{Shadwell Grylls} Rm{William Robotham - Chief Engineer}/FD.{Frank Dodd - Bodies}
Rm{William Robotham - Chief Engineer}/Les.{Ivan A. Leslie} Rm{William Robotham - Chief Engineer}/Wym.{G. Harold Whyman - Experimental Manager}
Rm{William Robotham - Chief Engineer}/Smth. Rm{William Robotham - Chief Engineer}/Mths.{Reg Matthews}
Rm{William Robotham - Chief Engineer}/AFM.{Anthony F. Martindale} Rm{William Robotham - Chief Engineer}/Swdl.{Len H. Swindell}
Rm{William Robotham - Chief Engineer}/FJH.{Fred J. Hardy - Chief Dev. Engineer} Rm{William Robotham - Chief Engineer}/CTS.{C. Trot Salt - Carburation}
Rm{William Robotham - Chief Engineer}/Std. Rm{William Robotham - Chief Engineer}/GR.{George Ratcliffe}
Rm{William Robotham - Chief Engineer}/Wst. Rm{William Robotham - Chief Engineer}/JBD.{John B. Dixon - Fuel Systems}

Rm{William Robotham - Chief Engineer}2/R.11.11.36.

CAR WORK GENERALLY.

With reference to the discussion held 9/11/36, the following points should be noted:-

P.III.
(1) Dodd will give me figures for oil consumption thick and thin oil - as soon as possible.

(2) Martindale and Gry.{Shadwell Grylls} will decide whether the front roll rod can be fitted to the Continental P.III without impairing water excluders.

(3) Ll.Smith will prepare a new clutch plate for Pass' car, and advise me when it is ready.

(4) Les.{Ivan A. Leslie} and JBD.{John B. Dixon - Fuel Systems} will let me know what they propose to do to clear up the Arens Control on the P.III.

(5) Les.{Ivan A. Leslie} to report what is to be done on frame noise and why no conclusions have been come to one way or the other.

(6) Les.{Ivan A. Leslie} to report on the sideways shake on the P.III.

(7) Std. to continue with tests to simplify the radiator top tank valve in conjunction with the 4 port cylinder head.

(8) Swdl.{Len H. Swindell} to complete work on P.III engine on the test bed which includes:-

(1) Optimum timing.
(2) Large chokes.
(3) Correct ignition advance curve.
(4) Loss to manifolds.
(5) Elimination of top water pipe.
  
  