Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 2179 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Feasibility of meeting War Office requirements for an armoured car chassis, focusing on radiator capacity and performance tests.1st Aug 1921Box 180 \ M1 \ 6  img007
Suitability of a chassis for armoured car use, comparing it with commercial alternatives and addressing performance concerns.27th Aug 1921Box 180 \ M1 \ 6  img008
Experimental modification to improve the cooling system of a 40/50 HP armoured car.1st Aug 1921Box 180 \ M1 \ 6  img009
Modifications to the cooling system of the 40/50 Armoured Cars to address water loss.6th Dec 1921Box 180 \ M1 \ 6  img010
Continued discussion on the negative effects of lower water circulation speed and how contaminated water can cause priming.6th Dec 1921Box 180 \ M1 \ 6  img011
Suitability of a C.A.V. starter for a 30 HP 1906/7 chassis, number 60508.1st Aug 1921Box 180 \ M1 \ 6  img012
From 'R.' to 'HM.' discussing costs from C.A.V. and responsibility for a modification.9th Aug 1921Box 180 \ M1 \ 6  img013
Issues with sourcing materials such as thin paper and low hysteresis steel for condensers.21th Nov 1921Box 180 \ M1 \ 6  img014
The performance test of Melin tungsten contact points after a 390-hour run.19th Sep 1921Box 180 \ M1 \ 6  img015
The production plan for six experimental Goshawk 11 chassis.12th Sep 1921Box 180 \ M1 \ 6  img016
Policy for ordering materials for the Goshawk 11 chassis.14th Oct 1931Box 180 \ M1 \ 6  img017
Production and testing strategy for the Goshawk 11 car.14th Oct 1921Box 180 \ M1 \ 6  img018
Inter-departmental cooperation for the development and testing of a new small car, the Goshawk.14th Oct 1921Box 180 \ M1 \ 6  img019
Customer complaints regarding the springing of the 40/50 HP chassis, comparing thick and thin leaf springs.10th Nov 1921Box 180 \ M1 \ 6  img020
Vehicle springing issues, tyre pressure effects, and achieving ideal friction through lubrication and dampers.7th Oct 1921Box 180 \ M1 \ 6  img021
The challenges and considerations of fitting shock absorbers, including component modifications and customer feedback.7th Oct 1921Box 180 \ M1 \ 6  img022
Leaf spring friction, potential complaints, and solutions such as dampers, lubrication, or changing spring types.7th Oct 1921Box 180 \ M1 \ 6  img023
Cover note for a letter from the representative in India about the running of cars fitted only with battery ignition.6th Oct 1921Box 180 \ M1 \ 6  img024
Letter from the Delhi Service Depot outlining the reasons for prejudice against battery ignition cars in India.15th Sep 1921Box 180 \ M1 \ 6  img025
The impracticality of battery-only ignition systems due to a lack of charging facilities in 'Native States'.15th Sep 1921Box 180 \ M1 \ 6  img026
Modifications to fit a magneto on the Goshawk II engine by altering the starter motor position.1st Nov 1921Box 180 \ M1 \ 6  img027
Telegram from Royce to Hives regarding a meeting to discuss U.S.A. matters and the Goshawk engine.15th Jul 1930Box 180 \ M1 \ 6  img028
From Rs. to HS. arranging a meeting with Mr. Royce at West Wittering regarding 'Goshawk II'.18th Nov 1921Box 180 \ M1 \ 6  img029
Bump test failures of the Goshawk II chassis, with a comparison to the standard 40/50 HP chassis.15th Dec 1921Box 180 \ M1 \ 6  img030
Potential front spring failures on the Goshawk car, urging modifications before production.15th Dec 1921Box 180 \ M1 \ 6  img031
Log of breakages and remarks from a bump test on a Tomahawk chassis front.15th Dec 1921Box 180 \ M1 \ 6  img032
Test report on a front bumper chassis, detailing special fittings and a log of failures over time.15th Dec 1921Box 180 \ M1 \ 6  img033
Log of a running test on the rear of a 40/50 chassis, detailing failures over 100 hours.15th Dec 1921Box 180 \ M1 \ 6  img034
The performance of oilless bushes on a Marmon Car and a recommendation for their use on the 40/50 HP model.2nd Aug 1921Box 180 \ M1 \ 7  img001
The dismantling and analysis of a Marmon car crankshaft and bearings.1st Sep 1921Box 180 \ M1 \ 7  img002
Pin dimensions, Brinell hardness tests, and chemical analysis results.1st Sep 1921Box 180 \ M1 \ 7  img003
Extract from the Marmon Car Instruction Book detailing the function of the electrical circuit breaker.10th Dec 1920Box 180 \ M1 \ 7  img004
Analysis of a double circuit breaker from a Marmon car for use in a chassis electrical system.3rd Dec 1921Box 180 \ M1 \ 7  img005
Continuation page of a report on electrical circuit protection arrangements as an alternative to fuses.3rd Dec 1921Box 180 \ M1 \ 7  img006
Analysis of a circuit breaker and dynamo system under fault conditions, page 3.13th Dec 1921Box 180 \ M1 \ 7  img007
The examination and particulars of a 6-volt Marmon Delco Dynamo.28th Sep 1921Box 180 \ M1 \ 7  img008
Page 2 of a report detailing the performance and physical specifications of an electrical machine.28th Sep 1921Box 180 \ M1 \ 7  img009
Graph of ampere-output speed curves for a Delco Dynamo from a Marmon Car.19th Oct 1921Box 180 \ M1 \ 7  img010
The compression ratio and detonation issues of an Essex car engine.19th Oct 1921Box 180 \ M1 \ 7  img011
Comparison of a 15 HP Lorraine-Dietrich with the 'Goshawk II', listing its shortcomings.23th Nov 1921Box 180 \ M1 \ 7  img012
Recommendation to adopt the new Lucas Cut-out as standard based on its reliability and performance.7th Jul 1921Box 180 \ M1 \ 8  img001
Recommendation for the adoption of a new cut-out and further development with Lucas's.4th Jul 1921Box 180 \ M1 \ 8  img002
Unsatisfactory output of the Lucas Dynamo for the 40/50 chassis, comparing cutting-in speeds with different axle ratios.7th Jul 1921Box 180 \ M1 \ 8  img003
Axle ratios and their impact on dynamo cutting-in speeds for the 40/50 chassis.1st Jul 1921Box 180 \ M1 \ 8  img004
Dissatisfaction with the Lucas Company's electrical equipment and future contract terms.8th Jul 1921Box 180 \ M1 \ 8  img005
Reliability issues with dynamo, cut-out, and fuse components.1st Jul 1921Box 180 \ M1 \ 8  img006
Successfully resolving and standardising issues regarding Exide battery reliability and dynamo belt tension.1st Jul 1921Box 180 \ M1 \ 8  img007
Further notes discussing the unreliability of Lucas electrical equipment, dynamos, and potential replacement options.2nd Jul 1921Box 180 \ M1 \ 8  img008
Reliability of fuses and fuse holders, and questioning a committee decision.1st Jul 1921Box 180 \ M1 \ 8  img009
Difficulties and proposed design changes for petrol tank fittings in response to U.S.A. complaints.14th Jul 1921Box 180 \ M1 \ 8  img010
Letter discussing vacuum feed systems and a hot spot induction system for low-grade gasoline.1st Jul 1921Box 180 \ M1 \ 8  img011
Methods of heating the carburettor and throttle, including using exhaust gases and the implications for using alcohol as fuel.1st Jul 1921Box 180 \ M1 \ 8  img012
Starter carburettor, speedometer drive, chassis weight, and battery ignition.12th Jul 1921Box 180 \ M1 \ 8  img013
Comparison of platinum-iridium versus tungsten for use in contact points.1st Jul 1921Box 180 \ M1 \ 8  img014
Requesting a test of G.11 and Neptune induction pipes against the Dorris scheme on a 40/50 engine.15th Dec 1921Box 180 \ M1 \ 9  img001
Unsuitability of the Bendix pinion for the Neptune Electric Starter and proposing an alternative design.15th Dec 1921Box 180 \ M1 \ 9  img002
Modification of a 40/50 HP chassis engine for marine applications, to be named 'Neptune'.1st Oct 1921Box 180 \ M1 \ 9  img003
Listing drawings for the 'Goshawk II' and 'Swallow' designs being prepared for an upcoming meeting.8th Nov 1921Box 180 \ M1 \ 9  img004
Listing drawings related to the 'Swallow' Gear Box and Clutch.1st Nov 1921Box 180 \ M1 \ 9  img005
Drawings for the 'Swallow' Gear Box and Declutching Gear.1st Nov 1921Box 180 \ M1 \ 9  img006
Proposed visit and a plan to modify the 40/50 engine for a smaller G.11-based chassis.13th Dec 1921Box 180 \ M1 \ 9  img007
Query regarding driving a magneto through a dynamo for the G.11 Swallow and Neptune engines, requesting an experiment on gearing backlash.15th Dec 1921Box 180 \ M1 \ 9  img008
Shift of taxation from the car to petrol, smaller engine bores, and the 12/14 HP model.1st Oct 1921Box 180 \ M1 \ 9  img009
Study and proposal for modifying the 40/50 HP engine to an OHV configuration, using existing stock parts.1st Oct 1921Box 180 \ M1 \ 9  img010
Requesting valve samples to test if they can be resized for a 40/50 HP engine altered to have overhead valves.3rd Oct 1921Box 180 \ M1 \ 9  img011
The Essex cylinder head gasket and its relation to the 'Swallow' engine design.23th Sep 1921Box 180 \ M1 \ 9  img012
Proposal for a crankshaft for a new 14 HP six-cylinder engine, seeking feedback on the similar Marmon crankshaft design.29th Aug 1921Box 180 \ M1 \ 9  img013
Design specifications for a new small six-cylinder engine, referred to as the 'Third Line Model'.26th Oct 1921Box 180 \ M1 \ 9  img014
Comparing the development of a six-cylinder engine against a four-cylinder version, outlining costs, design choices, and simplifications.1st Aug 1921Box 180 \ M1 \ 9  img015
Proposal for an earthed electrical system for the small 14 HP model, referencing the 'Goshawk II' system.1st Aug 1921Box 180 \ M1 \ 9  img016
Request to test a fan belt drive for the 'Goshawk II' engine, detailing its specifications and mentioning a new 14 HP model.11th Aug 1921Box 180 \ M1 \ 9  img017
Proposed design modifications for the 'Swallow' model, including wheelbase, body, and mechanical changes.3rd Sep 1921Box 180 \ M1 \ 9  img018
Design considerations for a new car model, including ignition, size, and weight comparisons.9th Mar 1921Box 180 \ M1 \ 9  img019
Problem of water loss from the radiator during hill climbing and potential solutions.9th Sep 1921Box 180 \ M1 \ 9  img020
Policy for building the Goshawk I engine, comparing it to the Vulture and Goshawk II.11th Jun 1921Box 180 \ M1 \ 9  img021
Transition from the 'Goshawk II' to a new 40 HP chassis and managing material orders for the 40/50 HP model.14th Jun 1930Box 180 \ M1 \ 9  img022
From 'R.' to 'WD.' concerning the procedure for keeping production output six months ahead.10th Jun 1921Box 180 \ M1 \ 9  img023
Proposed rig for analyzing crankshaft torque and stress.22th Jul 1918Box 180 \ M2 \ M2.1  img001
Oil pressure application for piston and crankshaft tests, and pump modifications.22th Jul 1918Box 180 \ M2 \ M2.1  img002
From 'E' to 'DA' requesting to proceed with an experimental test apparatus as per Mr. Royce's wishes.22th Jul 1918Box 180 \ M2 \ M2.1  img003
Hand-drawn plan of an oil pump and piston assembly for reverse torque.22th Jul 1918Box 180 \ M2 \ M2.1  img004
Pictorial and schematic diagrams of the Condor battery ignition system.25th Jun 1918Box 180 \ M2 \ M2.1  img005
Design sketch of a Condor engine connecting rod with handwritten notes.24th Mar 1918Box 180 \ M2 \ M2.1  img006
Design considerations for a two-cylinder experimental 'V' Condor engine.24th Mar 1918Box 180 \ M2 \ M2.1  img007
Design requirements for a new 'V' engine, referencing Condor, Falcon, and Eagle designs.22th Jan 1918Box 180 \ M2 \ M2.1  img008
Heavy engine breathing, crankcase vacuum, and options for piston testing.1st Mar 1927Box 180 \ M2 \ M2.1  img009
Letter discussing the performance of a trembler coil and requesting a specific small model for testing.12th Mar 1918Box 180 \ M2 \ M2.1  img010
Letter to Count Carlos de Salamanca regarding fuel substitutes for petrol.29th Jan 1918Box 180 \ M2 \ M2.1  img011
Letter to Count Carlos de Salamanca regarding fuel alternatives, lubrication, and engine testing procedures.29th Jan 1918Box 180 \ M2 \ M2.1  img012
Note on the elastic mounting design for the 'Eagle' engine's electrical starting gear.26th Jan 1918Box 180 \ M2 \ M2.1  img013
Requesting the Experimental Department test the 'Eagle' Electrical Starting Gear for engine vibration effects.24th Jan 1918Box 180 \ M2 \ M2.1  img014
Formalization of production methods, suggesting roles for Mr. Hives and Mr. Willis.4th Jan 1918Box 180 \ M2 \ M2.1  img015
Methods of production and fitting for engine bearings and brasses, advocating for high precision machining to ensure interchangeability.4th Jan 1918Box 180 \ M2 \ M2.1  img016
Clarifying a misunderstanding about production methods and the importance of collaborating with specialists.25th Jan 1918Box 180 \ M2 \ M2.1  img017
Methods of production, ending with a personal clarification.25th Jan 1918Box 180 \ M2 \ M2.1  img018
Requesting the maker and analytical details of 'Quick Step' steel for valves.12th Jan 1918Box 180 \ M2 \ M2.1  img019
Recent visit to West Wittering and stressing the value of in-person meetings over correspondence.25th Feb 1918Box 180 \ M2 \ M2.1  img020
Suggesting a document be sent to the Technical Director of the Air Ministry for the attention of Lieut. Col. Barrington.12th Sep 1918Box 180 \ M2 \ M2.1  img021
Request for taps and drills required to service an office anthracite stove.12th Sep 1918Box 180 \ M2 \ M2.1  img022
Responding to a previously received suggestion on how to compare the Goshawk engine.18th May 1922Box 180 \ M2 \ M2.1  img023


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙