| Description | Date | Identifier | |
| Letter from Park Ward & Co. Ltd to W.A. Robotham, enclosing a Progress Report concerning the 'Myth' project. | 30th Jun 1941 | Box 109 \ 2 scan0263 | |
| Progress report tracking the completion status of jigs and components for various vehicle parts. | 18th Apr 1941 | Box 109 \ 2 scan0264 | |
| Progress chart tracking the completion status of jigs and components for various part numbers. | 1st Apr 1941 | Box 109 \ 2 scan0265 | |
| Progress log for Jigs and Components, listing part numbers, descriptions, and completion status. | 9th Apr 1941 | Box 109 \ 2 scan0266 | |
| Progress report tracking the completion of jigs and components for various parts. | 25th May 1941 | Box 109 \ 2 scan0267 | |
| Progress chart for a Stiffening Bracket Left Hand Front Cross Member. | 1st Jul 1941 | Box 109 \ 2 scan0268 | |
| Letter to Park Ward Ltd. enclosing prints for the Front Wing Stay L & R.H. and noting the use of American projection. | 1st Jul 1941 | Box 109 \ 2 scan0269 | |
| Letter to Park Ward Ltd. enclosing drawings for a Front Wing Rear Shield and an arrangement of Locks, Dovetails & Bumpers. | 2nd Jul 1941 | Box 109 \ 2 scan0270 | |
| Request to send the wooden former for Myth front seats to Messrs. Jackson, Millboard & Fibre Co., Ltd. | 8th Jul 1941 | Box 109 \ 2 scan0271 | |
| List of 'Myth' body metal parts collected, detailing part numbers, quantities, and individual weights. | 19th Jun 1941 | Box 109 \ 2 scan0272 | |
| Parts list showing reference numbers, descriptions, quantities, and weights. | 10th Jul 1941 | Box 109 \ 2 scan0273 | |
| Letter to Park Ward, Ltd. with instructions for the finish of the first body for M.40. | 10th Jul 1941 | Box 109 \ 2 scan0274 | |
| Progress report on the Myth Body and Chassis Framework, detailing delays due to equipment repair and other work priorities. | 14th Jul 1941 | Box 109 \ 2 scan0275 | |
| Progress report on the Myth Body and Chassis Framework, including drawings by Park Ward. | 14th Jul 1941 | Box 109 \ 2 scan0276 | |
| Letter to Park Ward & Co. enclosing blueprints for the 'Myth' car. | 16th Jul 1941 | Box 109 \ 2 scan0277 | |
| Letter to Messrs. Park Ward Ltd. enclosing prints for the 'Myth' body and discussing a locking arrangement for the petrol filler. | 19th Aug 1941 | Box 109 \ 2 scan0278 | |
| Letter to Park Ward Ltd. concerning the construction of the 'Myrth Bonnet' side hinge. | 19th Aug 1941 | Box 109 \ 2 scan0279 | |
| Letter to C.W. Ward regarding the design of project 4.B.50 and the importance of a meeting in Derby. | 20th Aug 1941 | Box 109 \ 2 scan0280 | |
| Letter to Park Ward & Co. regarding revised instructions and material specifications for a 4 Light Body. | 21th Aug 1941 | Box 109 \ 2 scan0281 | |
| Letter to Messrs. Park Ward, Ltd. detailing a list of enclosed duplicate prints for the job 'MYHT'. | 26th Aug 1941 | Box 109 \ 2 scan0282 | |
| Letter to Park Ward & Co. regarding required body mounting parts for project 'Myth'. | 27th Aug 1941 | Box 109 \ 2 scan0283 | |
| Letter to Park Ward Ltd. enclosing duplicate prints for a car body. | 3rd Sep 1941 | Box 109 \ 2 scan0284 | |
| Progress report on body work by Park Ward concerning the 'Myth' project and 'Rationalized Bodies'. | 18th Aug 1941 | Box 109 \ 2 scan0285 | |
| Project delays, supplier coordination for drawings and jigs, and modifications for a vehicle body. | 18th Aug 1941 | Box 109 \ 2 scan0286 | |
| Progress report on body work being undertaken by Park Ward for the Myth, B.V., and Senior Range models. | 18th Aug 1941 | Box 109 \ 2 scan0287 | |
| Project delays, the need for jigs and drawings for suppliers, and modifications for a lightened body. | 18th Aug 1941 | Box 109 \ 2 scan0288 | |
| Description of the contents of four drawing sheets for the Morphics Side Frame. | 17th Sep 1941 | Box 109 \ 2 scan0289 | |
| Letter to Messrs. Park Ward Ltd. regarding the dispatch of body fittings for M.40. | 18th Sep 1941 | Box 109 \ 2 scan0290 | |
| List of fittings to Park Ward & Co. Ltd. | 18th Sep 1941 | Box 109 \ 2 scan0291 | |
| Letter to A.W. Chapman Ltd. confirming an order for Mark 27 Seat Fittings with specific hand requirements. | 18th Sep 1941 | Box 109 \ 2 scan0292 | |
| Internal memorandum requesting the despatch of non-chargeable body fittings for M.40 to Park Ward. | 18th Sep 1941 | Box 109 \ 2 scan0293 | |
| Commenting on a draught report concerning work in hand for body manufacturer Park Ward. | 20th Sep 1941 | Box 109 \ 2 scan0294 | |
| Scrapping of faulty parts and the need to supply Park Ward with jigs or drawings to prevent reoccurrence. | 20th Sep 1941 | Box 109 \ 2 scan0295 | |
| Progress report on the 'Myth' experimental car, detailing delays with the frame and coachwork. | 22th Sep 1941 | Box 109 \ 2 scan0296 | |
| The 'Myth' project, staffing issues, the war effort, and post-war planning with coachbuilder Park Ward. | 22th Sep 1941 | Box 109 \ 2 scan0297 | |
| Lack of progress and various issues with the B.V. body production and associated drawing work. | 22th Sep 1941 | Box 109 \ 2 scan0298 | |
| Capacity constraints due to the 'Myth' project and its impact on the coachwork for the 'Senior Range' of cars. | 22th Sep 1941 | Box 109 \ 2 scan0299 | |
| Future car design, covering topics like air conditioning, lightened bodies, and specific car models. | 18th Jul 1941 | Box 109 \ 2 scan0300 | |
| Request from Park Ward's for a permit to purchase ash wood and a certificate for wing manufacturing. | 24th Sep 1941 | Box 109 \ 2 scan0301 | |
| Letter to Messrs. Wilmot-Breede, Ltd. regarding undelivered glass channels for rear door window regulators. | 25th Sep 1941 | Box 109 \ 2 scan0302 | |
| Letter to Messrs. Park Ward Ltd. detailing amendments to various drawings. | 25th Sep 1941 | Box 109 \ 2 scan0303 | |
| Letter from Park Ward & Co Ltd chasing a permit for hardwood for 'Myth' coachwork. | 3rd Oct 1941 | Box 109 \ 2 scan0304 | |
| Letter from Park Ward & Co Ltd to W. A. Robotham regarding a visit from a Mr. Draper. | 9th Oct 1941 | Box 109 \ 2 scan0305 | |
| Response to a report regarding issues with drawing details, the shrinkage of blueprints, and the creation of new drawings for wing jigs. | 14th Oct 1941 | Box 109 \ 2 scan0306 | |
| Outlining the procedure and estimated time to produce four and six light bodies for Silver Phantom chassis. | 21th Oct 1941 | Box 109 \ 2 scan0307 | |
| Production procedure for rationalised Silver Phantom bodies. | 21th Oct 1941 | Box 109 \ 2 scan0308 | |
| Visit to Messrs. Park Wards to locate full-scale drawings for R.R. & Bentley models. | 21th Oct 1941 | Box 109 \ 2 scan0309 | |
| List of car models detailing their respective drawing numbers and body construction materials. | 21th Oct 1941 | Box 109 \ 2 scan0310 | |
| The Silver Ripplet model and assigning large scale drawings of an experimental car to Park Wards. | 21th Oct 1941 | Box 109 \ 2 scan0311 | |
| Letter to F. Connolly regarding the supply and matching of Vaumol hides to Rexine. | 21th Oct 1941 | Box 109 \ 2 scan0312 | |
| Letter to Hairlok Co. Ltd. regarding wood models for arm rests and a missing Seatex sample. | 22th Oct 1941 | Box 109 \ 2 scan0313 | |
| Arranging for the packing and forwarding of wooden patterns for side and centre arm rests. | 22th Oct 1941 | Box 109 \ 2 scan0314 | |
| Order for 4 sets of moulded hair arm rests from The Hairlok Company Ltd. | 22th Oct 1941 | Box 109 \ 2 scan0315 | |
| Clarifying an order for moulded air arm rests, reducing the quantity from 4 to 2 sets. | 23th Oct 1941 | Box 109 \ 2 scan0316 | |
| Letter to Messrs. Park Ward, Ltd. regarding the dispatch of drawing prints for a sliding roof and steering column bracket. | 28th Oct 1941 | Box 109 \ 2 scan0317 | |
| Letter from Park Ward & Co. Ltd confirming a telegram and requesting urgent delivery of various gauges of sheet metal. | 29th Oct 1941 | Box 109 \ 2 scan0318 | |
| Requesting to hold all machining for rear and front hubs for the M.40 Test Rig pending a modified design. | 30th Oct 1941 | Box 109 \ 2 scan0319 | |
| Notes and a visit concerning rationalised and experimental saloon bodies. | 30th Oct 1941 | Box 109 \ 2 scan0320 | |
| Letter concerning a new panel lay-out drawing, third party interests, and a sample of a flush-mounted ash tray. | 30th Oct 1941 | Box 109 \ 2 scan0321 | |
| Meeting minutes regarding the instrument board design for the 'Myth' car with Messrs. S. Smith & Sons. | 30th Oct 1941 | Box 109 \ 2 scan0322 | |
| Specifications for the instrument panel, switch-box, and auxiliary controls. | 30th Oct 1941 | Box 109 \ 2 scan0323 | |
| Letter to Messrs. S. Smith & Sons confirming the dispatch of a blueprint for a proposed instrument board. | 30th Oct 1941 | Box 109 \ 2 scan0324 | |
| Cover letter to C. W. N. Nichols of Messrs. S. Smith & Sons regarding a discussion about the Instrument Board. | 1st Nov 1941 | Box 109 \ 2 scan0325 | |
| Letter discussing a projected ignition switch and the placement of an ash-tray. | 4th Nov 1941 | Box 109 \ 2 scan0326 | |
| Letter to Messrs. Park Ward & Co. regarding prints for a Bonnet Fastener Assembly and a Rear Wing Assembly. | 10th Nov 1941 | Box 109 \ 2 scan0327 | |
| Letter to Park Ward & Co. regarding the fitting of a water drip rail on the Myth Body, referencing specific prints. | 10th Nov 1941 | Box 109 \ 2 scan0328 | |
| Letter clarifying a misunderstanding regarding an enclosed list for additional steel for the 'Myth' body. | 13th Nov 1941 | Box 109 \ 2 scan0329 | |
| Letter to Wilmot Breeden, Ltd. discussing bumper designs, bracket modifications, and an order for parts. | 26th Nov 1941 | Box 109 \ 2 scan0330 | |
| Progress report on the discontinued 'Myth Project (Body)' detailing the status of the layout, drawings, and hardware. | 6th Dec 1943 | Box 109 \ 2 scan0331 | |
| Page 2 of a parts list detailing quantities and locations for various car body components. | 6th Dec 1943 | Box 109 \ 2 scan0332 | |
| Inventory list of car body parts, detailing quantities, conditions, and storage locations. | 6th Dec 1943 | Box 109 \ 2 scan0333 | |
| Numbered inventory list of vehicle body parts, specifying quantities and their assigned locations. | 6th Dec 1943 | Box 109 \ 2 scan0334 | |
| Parts list for vehicle bodies, detailing quantities, suppliers, and specifications. | 6th Dec 1943 | Box 109 \ 2 scan0335 | |
| Query regarding a material shortage of hardware and trimming to complete two car bodies. | 8th Dec 1943 | Box 109 \ 2 scan0336 | |
| The progress and challenges of the 'Myth Project' body construction by Park Ward. | 15th Dec 1943 | Box 109 \ 2 scan0337 | |
| Leather supply for prototype cars with Connolly Bros. | 15th Dec 1943 | Box 109 \ 2 scan0338 | |
| Illustration of the front view of a car, focusing on the radiator grille, headlamps, and front wings. | 15th Dec 1943 | Box 109 \ 2 scan0339 | |
| Secret memo regarding the 'Myth' project and its similarity to the new Austin 12. | 10th Oct 1939 | Box 109 \ 3 scan0001 | |
| Specification sheet for the Austin 12 car. | 10th Oct 1939 | Box 109 \ 3 scan0002 | |
| Notes on the practical forging techniques for various metals. | 21th Nov 1939 | Box 109 \ 3 scan0003 | |
| The forging procedure, including flash and contracting allowances. | 21th Nov 1939 | Box 109 \ 3 scan0004 | |
| Page detailing contraction allowances, draft allowances, and die cracks in the forging process. | 21th Nov 1939 | Box 109 \ 3 scan0005 | |
| Forging cracks, stress concentration, die design, and errors in the forging process. | 21th Nov 1939 | Box 109 \ 3 scan0006 | |
| Variations and faults in metal forgings, such as chopping and offset. | 21th Nov 1939 | Box 109 \ 3 scan0007 | |
| Notes and guidelines on forging principles and techniques. | 28th Jun 1940 | Box 109 \ 3 scan0008 | |
| Secret memorandum discussing the design progress of 'Project of Myth', focusing on suspension, track width, and body construction. | 28th Jun 1940 | Box 109 \ 3 scan0009 | |
| To 'Jr' regarding a request for a timeline to finish the Hyth engine patterns. | 20th Jul 1940 | Box 109 \ 3 scan0010 | |
| Outlining the design and procurement plan for engine components from outside suppliers. | 23th Jul 1940 | Box 109 \ 3 scan0011 | |
| Decision memo favouring a four-part design over a two-part design. | 30th Aug 1940 | Box 109 \ 3 scan0012 | |
| Design drawings and specifications for the 'Myth Engine'. | 30th Aug 1940 | Box 109 \ 3 scan0013 | |
| Design and features of the PL.333 Connecting Rod. | 1st Jul 1938 | Box 109 \ 3 scan0014 | |
| Fitting a large 4-cylinder engine into the 'Myth' car model, comparing it with the 'Rippletto' model. | 18th Sep 1940 | Box 109 \ 3 scan0015 | |
| Dispatch of a tappet door, petrol pump, and crank chamber breather for the 10 HP Myth Engine. | 25th Sep 1940 | Box 109 \ 3 scan0016 | |
| New designs for the M.40 Engine, including carburetter, oil pipes, and thermostat. | 26th Sep 1940 | Box 109 \ 3 scan0017 | |
| Confirmation of an agreement to dispose of a Buick and obtain two small cars for design information on the Myth project. | 26th Sep 1940 | Box 109 \ 3 scan0018 | |
| Sale of a Buick and the purchase of replacement second-hand cars. | 30th Sep 1940 | Box 109 \ 3 scan0019 | |
| Sale of a Buick to purchase two smaller cars. | 1st Oct 1940 | Box 109 \ 3 scan0020 | |
| Modifications to the crankcase, oil gauge, and dip stick for the 10 HP M.40. | 3rd Oct 1940 | Box 109 \ 3 scan0021 | |
| Confirming design modifications for the Thumper engine for the Myth car and suggesting investigation into the Wisp project. | 5th Oct 1940 | Box 109 \ 3 scan0022 | |
| The frame, suspension, and transmission layout for the 'Myth' car model. | 8th Oct 1940 | Box 109 \ 3 scan0023 | |
| | | | |