Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 898 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Covering note for the specification of a chassis ammeter.13th Aug 1928Box 70 \ 4  scan0007
Specification for the production inspection and testing of a chassis ammeter.14th Aug 1928Box 70 \ 4  scan0008
The specification for inspection and testing of a Chassis Ammeter.13th Aug 1928Box 70 \ 4  scan0009
Proposed production test for chassis ammeters, arguing that the routine procedure is sufficient.22th Aug 1928Box 70 \ 4  scan0010
Specification for the production inspection and testing of a chassis ammeter.3rd Jan 1930Box 70 \ 4  scan0011
Production test and inspection procedure for an EAC ballast resistance for an ignition coil.16th Jan 1925Box 70 \ 4  scan0012
Production test and inspection procedure for a ballast resistance for an ignition coil.14th Oct 1926Box 70 \ 4  scan0013
Cover note for a production test and inspection of a double value ballast resistance for an ignition coil.26th Nov 1927Box 70 \ 4  scan0014
Production test and inspection procedure for a double value ballast resistance for an ignition coil.25th Nov 1927Box 70 \ 4  scan0015
Instructions on how to check for cracks and loose brass ferrules on a component.15th Oct 1926Box 70 \ 4  scan0016
Production test procedure for an 18,000 turn taller type ignition coil in a Reimanol case.15th Oct 1926Box 70 \ 4  scan0017
Test procedures for an electrical component involving current, voltage, and spark gap measurements.16th Dec 1926Box 70 \ 4  scan0018
The specification for production inspection and testing of new finer primary ignition coils in a redmanol case.16th Dec 1926Box 70 \ 4  scan0019
Production test procedure for Finer Primary Type ignition coils in a Redmanol case.16th Dec 1926Box 70 \ 4  scan0020
Test procedure for a distributor, detailing current, voltage, and spark gap parameters.8th Jun 1927Box 70 \ 4  scan0021
Specification for the insulation testing of Redmanol coil cases at various temperatures.8th Jun 1927Box 70 \ 4  scan0022
Establishing the new standard production test for a 22 SWG primary coil with double ballast resistance.9th Jun 1928Box 70 \ 4  scan0023
Production test procedure for an ignition coil.9th Jun 1928Box 70 \ 4  scan0024
Page of a test procedure for a distributor, detailing current, voltage, and spark gap settings.5th Apr 1930Box 70 \ 4  scan0025
Production test procedure for an ignition coil.5th Apr 1930Box 70 \ 4  scan0026
Test procedure for ignition system components, detailing current, voltage, and running conditions.15th Apr 1932Box 70 \ 4  scan0027
Production test specification for an ignition coil.7th Apr 1930Box 70 \ 4  scan0028
Request to alter the lower current limit for the ignition coil production test.4th Apr 1930Box 70 \ 4  scan0029
Production test procedure for a paper dielectric condenser for battery ignition.15th Oct 1926Box 70 \ 4  scan0030
Testing procedures and specifications for condensers, including capacity and static charge verification.23th Jan 1925Box 70 \ 4  scan0031
Cover note for the specification of Production Inspection & Test of the EAC distribution board and cutout.23th Jan 1925Box 70 \ 4  scan0032
Specification document for the production inspection, adjustment, and testing of a distribution board and cutout.21th Jan 1925Box 70 \ 4  scan0033
Test procedure outlining voltage, amperage, and resistance specifications for a dynamo and cutout system.21th Jan 1925Box 70 \ 4  scan0034
Wiring diagram for an EAC distribution board and cutout test.14th May 1925Box 70 \ 4  scan0035
Providing an additional note on the specification for production inspection and testing of the distribution board and cutout.14th May 1925Box 70 \ 4  scan0036
Additional note on the specification for production inspection and testing of a distribution board and cutout, detailing contact point alignment.14th May 1925Box 70 \ 4  scan0037
Test log for a distribution board and cutout, recording various electrical measurements.4th Nov 1925Box 70 \ 4  scan0038
Specification for production inspection, adjustment, and testing of the distribution board and cutout.19th Oct 1926Box 70 \ 4  scan0039
Test procedure document for a dynamo and cutout system, specifying operational limits for voltage, current and resistance.19th Oct 1926Box 70 \ 4  scan0040
Wiring diagram for a distribution board and cutout test for the 40/50 model.9th May 1924Box 70 \ 4  scan0041
Test log sheet for dynamos, detailing performance data and remarks from multiple tests.9th May 1924Box 70 \ 4  scan0042
Checklist of inspection points and record-keeping requirements for dynamo particulars.20th Jan 1925Box 70 \ 4  scan0043
Specification for the production inspection and testing of an EAC dynamo.20th Jan 1925Box 70 \ 4  scan0044
Specification and test procedure for an R.R. EAC. Dynamo, version 1.20th Jan 1925Box 70 \ 4  scan0045
Test procedures for a dynamo, including insulation resistance, running tests, and the bedding of brushes.20th Jan 1925Box 70 \ 4  scan0046
Continued list of testing procedures for a dynamo, including checks for voltage, noise, and insulation.20th Feb 1925Box 70 \ 4  scan0047
Production tests for the R.R. EAC dynamo, noting issues with overheating.20th Feb 1925Box 70 \ 4  scan0048
Production tests of 20 HP dynamos, requesting an up-to-date model for early review.27th Feb 1925Box 70 \ 4  scan0049
The production testing of 20 HP dynamos and a request for sample models.27th Feb 1925Box 70 \ 4  scan0050
The production test of a dynamo, detailing its satisfactory performance and suggesting improvements.25th Apr 1925Box 70 \ 4  scan0051
Test log sheet for various dynamos, recording outputs, settings, and remarks.30th Apr 1925Box 70 \ 4  scan0052
Temporary alterations to a dynamo's production inspection and test specification.12th May 1925Box 70 \ 4  scan0053
Attaching Version 2 of the Production Inspection & Test Specification for the EAC Dynamo X.8660.19th May 1925Box 70 \ 4  scan0054
Specification of inspection and test procedures for a dynamo, version 2.19th May 1925Box 70 \ 4  scan0055
Testing procedure for a dynamo, including insulation resistance, main and final bedding of brushes, and output checks.19th May 1925Box 70 \ 4  scan0056
Testing procedures for a dynamo, including open circuit voltage, load, noise, and insulation tests.8th Apr 1925Box 70 \ 4  scan0057
Test results log for R.R. EAC Dynamos, detailing output and brush settings.8th Apr 1925Box 70 \ 4  scan0058
Test log for dynamos, detailing performance metrics, adjustments, and inspection remarks.30th Nov 1925Box 70 \ 4  scan0059
New specification for production inspection and testing of an EAC Dynamo, changing the brush angle.29th Jan 1926Box 70 \ 4  scan0060
Specification for the inspection and testing of a dynamo's brush mechanism.29th Jan 1926Box 70 \ 4  scan0061
Instructions for testing and bedding the brushes of a dynamo.29th Jan 1926Box 70 \ 4  scan0062
Continued page of test procedures for a dynamo, detailing output, load, noise, and insulation checks.3rd Mar 1926Box 70 \ 4  scan0063
Clarifying the specification for measuring the spacing of dynamo commutator brushes for 40/50 and 20 HP models.3rd Mar 1926Box 70 \ 4  scan0064
To Mr. Brock regarding updates to production adjustment and test specifications for 40/50 HP and 20 HP models.31th Mar 1926Box 70 \ 4  scan0065
Specification for the inspection and testing of a dynamo brush mechanism.14th Oct 1926Box 70 \ 4  scan0066
Procedure for testing a dynamo, focusing on insulation resistance and the main and final bedding of brushes.14th Oct 1926Box 70 \ 4  scan0067
Continuation of a test procedure for a dynamo, detailing output, mechanical, and insulation checks.6th Nov 1926Box 70 \ 4  scan0068
Modified EAC Dynamo (WD.45.M) and its new 'Version 4' specification.6th Nov 1926Box 70 \ 4  scan0069
Inspection and test specification for a dynamo, detailing checks on the brush mechanism.6th Nov 1926Box 70 \ 4  scan0070
Procedure for testing and bedding in dynamo brushes.6th Nov 1926Box 70 \ 4  scan0071
Continued list of test procedures for a dynamo, covering output, voltage, noise, and insulation checks.13th Apr 1927Box 70 \ 4  scan0072
Specification and testing of a modified EAC dynamo and new test result forms.13th Apr 1927Box 70 \ 4  scan0073
Specification of inspection and test procedures for a dynamo, version 5.13th Apr 1927Box 70 \ 4  scan0074
Procedure for testing and bedding the brushes of a dynamo.13th Apr 1927Box 70 \ 4  scan0075
Test procedures and specifications for a dynamo, detailing various operational checks.24th Jun 1927Box 70 \ 4  scan0076
The specification for production, inspection, adjustment, and testing of the narrow brush dynamo.24th Jun 1927Box 70 \ 4  scan0077
Specification of inspection and test for an EAC Dynamo, Version 5, applicable to dynamos with narrower brushes.24th Jun 1927Box 70 \ 4  scan0078
Instructions for the preliminary, main, and final bedding of dynamo brushes.24th Jun 1927Box 70 \ 4  scan0079
Addition to a dynamo specification concerning testing for and rectifying undue brush noise.24th Jun 1927Box 70 \ 4  scan0080
Continued list of test procedures for a dynamo, covering performance and condition checks.6th Jul 1927Box 70 \ 4  scan0081
Update to the specifications for production tests of EAC dynamos, specifically concerning brush noise.6th Jul 1927Box 70 \ 4  scan0082
Inspection and test specification for 40/50 dynamos, specifically about control brush angle settings.16th Nov 1927Box 70 \ 4  scan0083
Confirming the correct control brush angle for N.B. type dynamos from 122° to 121°.10th Jan 1928Box 70 \ 4  scan0084
Fault report on a Dynamo RU.95 from Chassis 58-HC, detailing melted solder and brush issues.2nd Feb 1928Box 70 \ 4  scan0085
Customer complaints about faulty dynamos on the Phantom model, identifying the cause as melted commutator solder.13th Feb 1928Box 70 \ 4  scan0086
Amended specifications and testing for the N.B. type dynamo.7th Mar 1928Box 70 \ 4  scan0087
Specification for the inspection and testing of the N.B. type dynamo with narrower brushes.7th Mar 1928Box 70 \ 4  scan0088
Instructions for dynamo testing and brush bedding procedures.7th Mar 1928Box 70 \ 4  scan0089
Continuation of a testing procedure for a dynamo, focusing on brush bedding and performance checks.7th Mar 1928Box 70 \ 4  scan0090
Procedure for testing the insulation of a machine while it is still hot.19th Dec 1927Box 70 \ 4  scan0091
Production test results for EAC dynamos with narrower brushes.19th Dec 1927Box 70 \ 4  scan0092
Test results log for single modification dynamo machines.7th Apr 1927Box 70 \ 4  scan0093
Production specification for inspection and test of an EAC Dynamo of the N.B. type with a higher output armature.4th Dec 1928Box 70 \ 4  scan0094
Specification of inspection and test for a Dynamo of the N.B. Type X.8664 with higher output armature.4th Dec 1928Box 70 \ 4  scan0095
Instructions for the testing and bedding of dynamo brushes, page 2.4th Dec 1928Box 70 \ 4  scan0096
Page of test procedures for a dynamo, detailing brush bedding, load tests, and noise/vibration checks.4th Dec 1928Box 70 \ 4  scan0097
Inspection and insulation testing procedures for an electrical machine.19th Dec 1928Box 70 \ 4  scan0098
Specification for the inspection and test of an EAC Dynamo with a 28-slot armature.19th Dec 1928Box 70 \ 4  scan0099
Specification for the inspection and test of an N.B. type dynamo with a 28 slot armature.19th Dec 1928Box 70 \ 4  scan0100
Continued instructions for testing a dynamo, covering connections, brush bedding, insulation resistance, and operational tests.19th Dec 1928Box 70 \ 4  scan0101
Testing procedures for a dynamo, detailing final brush bedding and various load and speed tests.19th Dec 1928Box 70 \ 4  scan0102
Inspection and testing procedures for machine components, including armature and insulation.10th Apr 1929Box 70 \ 4  scan0103
Specification for production inspection and testing of Phantom and S.S. type dynamos.10th Apr 1929Box 70 \ 4  scan0104
Specification of inspection and test for Phantom & S.S. dynamos with 28 slot armatures.10th Apr 1929Box 70 \ 4  scan0105
Continued testing procedure for a dynamo, detailing checks on pigtail conductors, brush bedding, and insulation resistance.10th Apr 1929Box 70 \ 4  scan0106


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙