Rolls-Royce Archives
From the Rolls-Royce experimental archive: a quarter of a million communications from Rolls-Royce, 1906 to 1960's. Documents from the Sir Henry Royce Memorial Foundation (SHRMF).
Rolls-Royce Experimental Archives                
Choose Archive


Browsing Records        Page 1144 of 2367        Sort by   Box   Date   Description

Filter      from        to             identifier   [all]
DescriptionDateIdentifier
Letter to Metropolis Garages Ltd. regarding a support bracket.7th Jul 1939Box 90a \ 6  Scan266
Letter from Metropolis Garages Ltd. acknowledging receipt of drawings and information regarding engine mountings.10th Jul 1939Box 90a \ 6  Scan267
Request to return a complete set of Hartford dampers removed from chassis B.35.AE to be fitted to car B.27.LE.12th Jul 1939Box 90a \ 6  Scan268
List of equipment to be collected regarding a Bentley Chassis No. B.35-AE.13th Jul 1939Box 90a \ 6  Scan269
Expressing dissatisfaction with a customer's attitude regarding their car.21th Jul 1939Box 90a \ 6  Scan270
Letter to a client clarifying an arrangement about replacing experimental car features with standard pieces.21th Jul 1939Box 90a \ 6  Scan271
Mr. Hall's unreasonableness and unresponsiveness to correspondence.25th Jul 1939Box 90a \ 6  Scan272
Arranging a trial of a 'Spectre' vehicle for a weekend.1st Jul 1935Box 91 \ 1  scan0001
Specification document for the Spectre II Car.2nd Jul 1935Box 91 \ 1  scan0002
The trial of a Spectre car, noting its availability and experimental condition.3rd Jul 1935Box 91 \ 1  scan0003
Request to supply an oil cooler matrix and casing for use on the Spectre Test Bed.5th Jul 1935Box 91 \ 1  scan0004
Replacement of unsatisfactory oil retainers for the Spectre Distributor Drive.6th Jul 1936Box 91 \ 1  scan0005
Arranging a visit for Capt. W. Gordon Aston to view the Phantom III chassis for the catalogue.8th Jul 1935Box 91 \ 1  scan0006
Secret memo arranging a personal test drive of the 'Spectre' car.8th Jul 1935Box 91 \ 1  scan0007
Short memo arranging for the 'Spectre' to be available at 5 p.m. on Friday the 12th.9th Jul 1935Box 91 \ 1  scan0008
Spectre Distributor Drive, anticipating issues with leather seals and ordering replacements.9th Jul 1935Box 91 \ 1  scan0009
Order for half a dozen 'Gitseals' from a supplier.9th Jul 1935Box 91 \ 1  scan0010
Serious engine failure at 6,400 miles due to valve breakage on the Spectre project.10th Jul 1935Box 91 \ 1  scan0011
List of main troubles for the Spectre model, categorized by vehicle component.10th Jul 1935Box 91 \ 1  scan0012
New steering wheel and controls for the Spectre model, including details on the rim, spokes, and horn button.10th Jul 1935Box 91 \ 1  scan0013
Typed memo discussing the progress and requirements for Spectre catalogue drawings.11th Jul 1935Box 91 \ 1  scan0014
Corrections for drawing titles related to the Spectre's chassis and suspension.15th Jul 1935Box 91 \ 1  scan0015
Secret memo detailing a very negative test drive of the Spectre model, including a failure to start and significant suspension noises.15th Jul 1935Box 91 \ 1  scan0016
Re-issuing of drawing LeC 4560 for the Spectre Rear Wheelarch following modifications.15th Jul 1935Box 91 \ 1  scan0017
Feedback report on the 'No. 1 Spectre' model, detailing issues with its appearance, comfort, and visibility.15th Jul 1935Box 91 \ 1  scan0018
Road test report for the 'No. 1 Spectre Trial' detailing various mechanical issues.15th Jul 1935Box 91 \ 1  scan0019
Road test report detailing vehicle performance issues such as light springing, a heavy clutch, and a catastrophic gearbox failure during a hill climb.15th Jul 1935Box 91 \ 1  scan0020
Vehicle testing, noting issues like gearbox noise, engine tap, and clutch slip during a hill climb.15th Jul 1935Box 91 \ 1  scan0021
Secret internal memo discussing design feedback and comparisons for the Spectre car model.16th Jul 1935Box 91 \ 1  scan0022
Secret memo discussing the publication status of drawings for the Spectre engine.29th Jul 1935Box 91 \ 1  scan0023
Summary of outstanding troubles and rectified faults for the Spectre project.29th Jul 1935Box 91 \ 1  scan0024
Technical report detailing various vehicle faults and proposed modifications.29th Jul 1935Box 91 \ 1  scan0025
Technical report on resolved and ongoing faults, including a comparison between Spectre and Phantom II models.29th Jul 1935Box 91 \ 1  scan0026
List of mechanical issues and faults, numbered 4 through 10.29th Jul 1935Box 91 \ 1  scan0027
Faults and design issues found on a new chassis, including gearbox, suspension, and wheel problems.29th Jul 1935Box 91 \ 1  scan0028
Faults and required jobs for a 'Spectre' (1st Production) unit being returned for dismantling.30th Jul 1935Box 91 \ 1  scan0029
Sending 'Spectre' chassis and suspension drawings for checking before inking.30th Jul 1935Box 91 \ 1  scan0030
Request for a drawing or sketch of the Klaxons or horns for the Spectre model's catalogue illustrations.30th Jul 1935Box 91 \ 1  scan0031
Using white metal main and big end bearings on the three Spectre trial cars.31th Jul 1935Box 91 \ 1  scan0032
Modifications for the Spectre engine regarding an exhaust valve, camshaft timing, and the oil lubrication system.31th Jul 1935Box 91 \ 1  scan0033
Decision to name the new 40/50 HP car 'Phantom III' instead of 'Spectre'.31th Jul 1935Box 91 \ 1  scan0034
Photograph of a car's front due to no horns being fitted to the chassis at Derby.1st Aug 1935Box 91 \ 1  scan0035
Confirming the return of Spectre chassis drawings.1st Aug 1935Box 91 \ 1  scan0036
Secret memorandum detailing driving and operational faults found on the Spectre model.2nd Aug 1935Box 91 \ 1  scan0037
The despatch of drawings on cardboard to a Mr. Buckley.3rd Aug 1935Box 91 \ 1  scan0038
Accompanying photographs and turning circle data for the Phantom and Spectre models.3rd Aug 1935Box 91 \ 1  scan0039
Modification to the Spectre distributor wires, increasing the vertical wiring tube height.5th Aug 1935Box 91 \ 1  scan0040
Urgent memo regarding modifications to a strengthened aluminium push rod for the Spectre engine.5th Aug 1935Box 91 \ 1  scan0041
Drawing of a Spectre strengthened pushrod, noting design changes.5th Aug 1935Box 91 \ 1  scan0042
The failure of Duralumin push rods and the unsuitability of steel replacements for the Spectre engine.5th Aug 1935Box 91 \ 1  scan0043
The second test of the Spectre (1st Production) engine, detailing performance issues and proposed modifications.8th Aug 1935Box 91 \ 1  scan0044
List of technical modifications and corrections for an engine unit regarding valve springs, push rods, spark plugs, filters, and carburettor settings.8th Aug 1935Box 91 \ 1  scan0045
The supply of lamps and bumpers for Spectre demonstration and experimental cars for the Olympia show.8th Aug 1935Box 91 \ 1  scan0046
Page confirming details regarding wing lamps, front horns, and badges for a chassis.8th Aug 1935Box 91 \ 1  scan0047
Timing and process for supplying dummy chassis to coachbuilders for the Olympia model.8th Aug 1935Box 91 \ 1  scan0048
Outstanding requests for inertia figures, a Spectre back axle for a Vulture, and the fitment of a specific gearbox stay.20th Aug 1935Box 91 \ 1  scan0049
Finished drawings and captions for the Phantom III and the 20/25 HP Catalogue.21th Aug 1935Box 91 \ 1  scan0050
Confirming the decision to use white metal bearings for all Spectre engines, both for new production and existing units.23th Aug 1935Box 91 \ 1  scan0051
Letter providing feedback and suggested alterations on 20/25 HP Catalogue drawings.27th Aug 1935Box 91 \ 1  scan0052
Key listing vehicle controls and instruments labelled alphabetically from A to Z.27th Aug 1935Box 91 \ 1  scan0053
Typewritten list of various vehicle controls and components.27th Aug 1935Box 91 \ 1  scan0054
Urgent modification to make the foot switch bracket on the Spectre model detachable.27th Aug 1935Box 91 \ 1  scan0055
Requesting the dispatch of 20/25 HP chassis drawings to the Sales Department.27th Aug 1935Box 91 \ 1  scan0056
Design of Spectre Pipes in Frame, specifically the oil pipe connection used on demonstration cars.27th Aug 1935Box 91 \ 1  scan0057
Secret memo regarding the requirement for wheel covers on Olympia 40/50 demonstration cars.27th Aug 1935Box 91 \ 1  scan0058
Test report on the Spectre Dynamo Drive's spiral grooved spindle.3rd Sep 1935Box 91 \ 1  scan0059
Outlining points to raise with the Design Department regarding delays and required parts for various projects.5th Sep 1935Box 91 \ 1  scan0060
Secret memo regarding the design of a sparking plug spanner and a new sparking plug terminal.6th Sep 1935Box 91 \ 1  scan0061
Instructions for new ignition timing markings on the flywheel for the Spectre.9th Sep 1935Box 91 \ 1  scan0062
Secret memo clarifying conflicting specifications for the Phantom III regarding engine capacity, horsepower, and connecting rod type.12th Sep 1935Box 91 \ 1  scan0063
Query regarding whether a clock is hand-wound or electric.12th Sep 1935Box 91 \ 1  scan0064
Providing technical details and clarification on the Phantom III model.13th Sep 1935Box 91 \ 1  scan0065
Notes from a conference with 'Sg' detailing action points for the Spectre, Bentley, and Wraith models.13th Sep 1935Box 91 \ 1  scan0066
Requesting suitable dates for an instruction session on the Phantom III for salesmen and inspectors in London.17th Sep 1935Box 91 \ 1  scan0067
Secret memo discussing test results for a Phantom III 33-EX demonstration car, including brake seizure issues and a speed comparison against a P.II.18th Sep 1935Box 91 \ 1  scan0068
Typed memorandum detailing multiple faults and desired improvements on a vehicle, including overheating, gearbox issues, and noise.18th Sep 1935Box 91 \ 1  scan0069
Vehicle drive issue and the decision on sending it to Paris.18th Sep 1935Box 91 \ 1  scan0070
Test drive report for a Phantom III vehicle over a 240-mile journey.16th Sep 1935Box 91 \ 1  scan0071
Road test report detailing multiple mechanical and coachwork faults on a Phantom II.16th Sep 1935Box 91 \ 1  scan0072
Driving report discussing visibility from the seat, overall performance, and confidence in future sales after minor defects are cured.16th Sep 1935Box 91 \ 1  scan0073
Confirming a conversation and outlining seven action points for vehicle development and modifications.18th Sep 1935Box 91 \ 1  scan0074
Instruction for modifying the Front Brake Equaliser on the Spectre chassis by replacing specific parts and rollers.19th Jun 1935Box 91 \ 1  scan0075
Preliminary draft detailing the final specification for the 3rd Spectre chassis destined for France.14th Sep 1935Box 91 \ 1  scan0076
List of specifications and modifications for various engine components.14th Sep 1935Box 91 \ 1  scan0077
Required specifications and modifications for various components of Spectre models, focusing on issues like noise reduction.14th Sep 1935Box 91 \ 1  scan0078
Specification sheet detailing modifications for axles, suspension, petrol tank, frame, and jacks for Spectre vehicles.19th Sep 1935Box 91 \ 1  scan0079
Development and road test comparisons of the Phantom III 33-EX car against other models.19th Sep 1935Box 91 \ 1  scan0080
Short note regarding the plan to send car Phantom III to Paris.19th Sep 1935Box 91 \ 1  scan0081
Petrol and oil consumption for car 33-BX, detailing performance after specific engine modifications.20th Sep 1935Box 91 \ 1  scan0082
Questioning the necessity of lifting both sides of the bonnet to fill the Spectre with water and oil.20th Sep 1935Box 91 \ 1  scan0083
Letter enclosing poor-quality photographs of a Spectre, a 20/25, and a Bentley on the Stelvio pass and in Hungary.21th Sep 1935Box 91 \ 1  scan0084
Requesting the negatives for photographs of Phantom III and Bentley cars to make better prints for bulletins.24th Sep 1935Box 91 \ 1  scan0085
Note authorizing the collection of film prints and negatives from Messrs. Aitcheson.25th Sep 1935Box 91 \ 1  scan0086
Urgent and secret request for Phantom III vehicle specifications for S.M.M.T. private car publications.25th Sep 1935Box 91 \ 1  scan0087
Production holds on certain Phantom III (Spectre) chassis parts to align with experimental chassis No.3.25th Sep 1935Box 91 \ 1  scan0088
List of five technical specifications in reply to a query regarding the Phantom III model.26th Sep 1935Box 91 \ 1  scan0089
Run of the Phantom III main battery cable along new stiffeners.2nd Oct 1935Box 91 \ 1  scan0090
Travel to Paris for competitor vehicle testing and an issue with a Large Bore Bentley chassis.4th Oct 1935Box 91 \ 1  scan0091
List of modifications and features for the Phantom III production chassis.4th Oct 1935Box 91 \ 1  scan0092
List of required modifications and specifications for various vehicle components, including the flywheel, clutch, gearbox, and servo.4th Oct 1935Box 91 \ 1  scan0093


Copyright Sustain 2025, All Rights Reserved.    whatever is rightly done, however humble, is noble
An unhandled error has occurred. Reload 🗙